Commercial Electrical work permitted February 27, 2025, with 4 permits through June 18, 2026.
Portland’s permit records for this address don’t name a contractor; the permits list the scope, value and dates below.
4 permits issued Feb 27 – Jun 18, newest first.
| Issued | Permit | Contractor | Value |
|---|---|---|---|
| applied Jun 18 | #2026-044874-000-00-ET Electrical Permit · Addition/Alteration/Replacement Addition of shunt trip breaker for elevator. Status: Final | Not published | — |
| applied Sep 17 | #2025-075588-000-00-ET Electrical Permit · Addition/Alteration/Replacement |
Rogers will disconnect and reconnect power and data. One Gallon Shakers get a dedicated circuit with duplex receptacle, Five Gallon shakers get a dedicated circuit with duplex receptacle, Tinters get dedicated circuit with duplex receptacle, PCs get IS circuit (if available) with quad receptacle.
Status: Final
| Not published |
| — |
| applied Aug 6 | #2025-063624-000-00-ET Electrical Permit · Addition/Alteration/Replacement Aisle 35 - mount two quad boxes for new strip fixtures. Status: Final | Not published | — |
| applied Feb 27 | #2025-015789-000-00-ET Electrical Permit · Addition/Alteration/Replacement Scope: Bay ids; Receiving - Meet Reset Team Onsite at 8:30pm To Disconnect/Reconnect Electrical In One Trip Refer to bay IDs above and REMOVE all electrical including lights, conduit, junction boxes, mc cable, straps, and anything else in these bays as well as the bay to the left and bay to the… Status: Final | Not published | — |