Commercial General Building, Electrical, Fire Protection, Hvac/Mechanical, Plumbing work permitted December 16, 2024, with 23 permits through April 17, 2026, declaring $558,382 of work.
SINGLE PDF - FIRST TIME TI: 1ST FLOOR HOTEL BUILDING. REMOVING AND ADDING NON-SUPPORTING PARTITION WALLS TO CREATE TWO GALLERIES, AN OFFICE, A SPA EVENT ROOM, A KITCHEN, CLOSETS, SPA RETAIL SPACE, TWO FITNESS CLASSROOMS, FIVE SPA TREATMENT ROOMS, SPA STAFF ROOMS, A JUICE BAR, A KITCHEN, AND A WALK-IN BEVERAGE COOLER. W/24-018828-MT
Portland’s permit records for this address don’t name a contractor; the permits list the scope, value and dates below.
23 permits issued Dec 16 – Apr 17, newest first.
| Issued | Permit | Contractor | Value |
|---|---|---|---|
| applied Sep 4 | #2024-018821-REV-01-CO |
Commercial Building Permit · Alteration
SINGLE PDF - VALUE ADDED REVISION FOR ADDITIONAL BUILD OUT, NEW WARMING KITCHEN AND STORAGE ROOM, ADD FOLDING WALL PARTITION, ADD A SAUNA AND COLD SPA. **W/ 24-018828 REV 01 MT**
Status: Under Inspection
| Not published |
| $175K |
| applied Sep 4 | #2024-018828-REV-01-MT Mechanical Permit · Tenant Improvement SINGLE PDF - VALUE ADDED REVISION, MECHANICAL WORK TO ACCOMODATE ADDITIONAL TI BUILD OUT **W/ 24-018821 REV 01 CO** Status: Final | Not published | — |
| applied Apr 10 | #2026-026113-000-00-MT Mechanical Permit · Addition/Alteration/Replace (MT) FOR 40 FT OF GAS PIPING Status: Final | Not published | — |
| applied Apr 8 | #2026-025484-000-00-ET Electrical Permit · Addition/Alteration/Replacement Cascada Hotel, Room 103, 5 altered circuits Status: Final | Not published | — |
| applied Feb 10 | #2026-010365-000-00-PT Plumbing Permit · Addition/Alteration/Replacement TENANT IMPROVEMENT ADING 4 NEW SPA TREATMENT ROOMS WITH HAND SINKS, 1 NEW UNISEX LOCKER ROOM, 9 SHOWERS FOR THERMAL SPA ON FIRST FLOOR OF BUILDING IN THE EAST 1/3 OF THE BUILDING. Status: Final | Not published | — |
| applied Sep 2 | #2025-068466-000-00-FS Fire Systems Permit · Addition ALARM - ADDITION OF FA NOTIFICATION DEVICES AND NAC PANEL TO ACCOMODATE VARIOUS TI PROJECCTS ON FLOOR 1 Status: Final | Not published | — |
| applied Jan 20 | #2026-004719-000-00-ET Electrical Permit · New Construction In 1st floor TI buildout: - installing fire alarm devices as part of existing system, per fire alarm design - network video cameras - wireless access points - possible electronic access control door wire modifications if needed - possible voice/date drop modifications if needed Status: Final | Not published | — |
| applied Jan 7 | #2026-000667-000-00-FS Fire Systems Permit · Alteration SPRINKLER - INSTALL/RELOCATE FIRE SPRINKLERS DUE TO NEW WALLS/CEILINGS Status: Final | Not published | — |
| applied Nov 14 | #2025-093262-000-00-MT Mechanical Permit · Addition/Alteration/Replace (MT) SINGLEPDF - INSTALL A WALK IN COOLER W/SELF CONTAINED REFRIGERATION, INSTALL (2) TYPE 2 HOODS W/MAKEUP AIR UNIT - ELECTRICAL IS SEPARATE PERMIT. Status: Final | Not published | — |
| applied Dec 2 | #2025-096822-000-00-ET Electrical Permit · New Construction New 100amp service with 32 circuits Status: Final | Not published | — |
| applied Dec 2 | #2025-096894-000-00-ET Electrical Permit · New Construction 200amp service with 42 circuits Status: Final | Not published | — |
| applied Nov 19 | #2025-094593-000-00-ET Electrical Permit · Addition/Alteration/Replacement 89594-25: low voltage cabling for audio in the Forbidden Garden Space Status: Final | Not published | — |
| applied Oct 20 | #2025-085530-000-00-PT Plumbing Permit · Addition/Alteration/Replacement Addition of a commercial Type 2 prep kitchen for an event space adjacent to this as use for a catering facility. Adding 4 floor sinks, 1 prep sink, 1 dish sink, one hand wash station, two steam ovens, and 1 floor drain as an addition to the hotel Cascada T.I. Status: Final | Not published | — |
| applied Jul 24 | #2025-059698-000-00-FS Fire Systems Permit · Alteration SPRINKLER - INSTALL DROPS AND SPRINKLER HEADS IN NEW CEILINGS Status: Final | Not published | — |
| applied Jul 22 | #2025-058917-000-00-ET Electrical Permit · Addition/Alteration/Replacement 86304-25 low voltage cabling for audio and control systems in event space Status: Final | Not published | — |
| applied Jul 16 | #2025-057124-000-00-ET Electrical Permit · New Construction 200amp 3 phase panel install with 30 circuits Status: Final | Not published | — |
| applied May 12 | #2025-036737-000-00-FS Fire Systems Permit · New FIXED SYSTEM - CONNECTION OF A FACTORY INSTALLED CAPTIVE AIRE SYSTEM COVERING DUCT/ PLENUM/ APPLIANCES. Status: Final | Not published | — |
| applied May 13 | #2025-037758-000-00-PT Plumbing Permit · Addition/Alteration/Replacement Adding new Juice bar, and Kitchen to existing space for a T.I. hand sinks, floor sinks, dishwashers, and coffee machine. Status: Final | Not published | — |
| applied May 9 | #2025-036919-000-00-ET Electrical Permit · New Construction New 200amp panel and circuits for spa/garden area. Status: Final | Not published | — |
| applied Apr 3 | #2025-025872-000-00-ET Electrical Permit · New Construction First floor kitchen area 30 branch circuits Status: Final | Not published | — |
| applied Mar 4 | #2024-018821-000-00-CO Commercial Building Permit · Alteration SINGLE PDF - FIRST TIME TI: 1ST FLOOR HOTEL BUILDING. REMOVING AND ADDING NON-SUPPORTING PARTITION WALLS TO CREATE TWO GALLERIES, AN OFFICE, A SPA EVENT ROOM, A KITCHEN, CLOSETS, SPA RETAIL SPACE, TWO FITNESS CLASSROOMS, FIVE SPA TREATMENT ROOMS, SPA STAFF ROOMS, A JUICE BAR, A KITCHEN, AND A… Status: Under Inspection | Not published | $383K |
| applied Mar 4 | #2024-018828-000-00-MT Mechanical Permit · Tenant Improvement SINGLE PDF - TI MECHANICAL RENOVATION FOR THE FIRST FLOOR OF THE BUILDING. WITH 24-018821-CO. Status: Under Inspection | Not published | — |
| applied May 28 | #2024-044305-000-00-ET Electrical Permit · Addition/Alteration/Replacement PDOX - 93.664KW DC SOLAR ELECTRIC SYSTEM Status: Final | Not published | — |