Commercial General Building, Electrical work permitted November 8, 2024, with 43 permits through October 20, 2026, declaring $11,863,773 of work.
SINGLE PDF PROCESS/ PERKINS COIE 9TH & 10TH FLR TI; DEMO WALLS, EXTERIOR - TERRACE DOOR, INTERIOR - INFILL CONNECTING STAIR BETWEEN 8TH & 9TH FLR, NEW WALLS TO CREATE 9TH FLR - ENTRY, LIBRARY, STORAGE RMS, OFFICE SERVICES RM, WORKSTATIONS, SYSTEMS RM, OFFICES, COPY/COATS RM, HUDDLE RM, COFFEE RM, 10TH FLR - RECEPTION/WAITING AREA, CONFERENCE RMS, PANTRY/WORK LOUNGE/SOCAIL BAR, BATHRMS, MOTHERS RM, STORAGE RMS, OFFICES, RECORDS RM, WORKSTATIONS, COPY/PRINT RM, CEILING, FLOORING, FINISHES, PLUMB AND ELEC
Portland’s permit records for this address don’t name a contractor; the permits list the scope, value and dates below.
43 permits issued Nov 8 – Oct 20, newest first.
| Issued | Permit | Contractor | Value |
|---|---|---|---|
| applied Aug 25 | #2026-063023-000-00-FA Facility Permit · Alteration SINGLE PDF PROCESS/ ERNST AND YOUNG STE 600 6TH FLR TI; INSTALL TERMINAL UNITS, AIR HANDLING UNIT, CONDENSATE PUMP, DUCTWORK, PIPING, DIFFUSERS, GRILLES AND ELEC |
Status: Issued
| Not published |
| $573K |
| applied Aug 25 | #2026-063021-000-00-FA Facility Permit · Alteration SINGLE PDF PROCESS/ ERNST AND YOUNG STE 600 6TH FLR TI; DEMO WALLS, NEW WALLS TO CREATE STORAGE RMS, COATS RM, RECEPTION, IT STORAGE, CONFERENCE RM, OFFICES, JIT RMS, LIBRARY, MAIL RM, PRINT RM, PRIVACY RM, PANTRY, OPEN OFFICE AREAS, TRAINING RM W/ OPERABLE WALL, HUB AREA, CEILING, FLOORING,… Status: Issued | Not published | $3.1M |
| applied Oct 14 | #2026-076338-000-00-FA Facility Permit · Alteration SINGLE PDF PROCESS/ ERNST AND YOUNG STE 600 6TH FLR TI; DEMO WALLS, NEW WALLS TO CREATE STORAGE RMS, COATS RM, RECEPTION, IT STORAGE, CONFERENCE RM, OFFICES, JIT RMS, LIBRARY, MAIL RM, PRINT RM, PRIVACY RM, PANTRY, OPEN OFFICE AREAS, TRAINING RM W/ OPERABLE WALL, HUB AREA, CEILING, FLOORING,… Status: Issued | Not published | — |
| applied Oct 5 | #2026-073627-000-00-FA Facility Permit · Alteration power, fire alarm - ERNST AND YOUNG STE 600 6TH FLR TI; DEMO WALLS, NEW WALLS TO CREATE STORAGE RMS, COATS RM, RECEPTION, IT STORAGE, CONFERENCE RM, OFFICES, JIT RMS, LIBRARY, MAIL RM, PRINT RM, PRIVACY RM, PANTRY, OPEN OFFICE AREAS, TRAINING RM W/ OPERABLE WALL, HUB AREA, CEILING, FLOORING,… Status: Issued | Not published | — |
| applied Oct 12 | #2026-075586-000-00-FA Facility Permit · Alteration SINGLE PDF PROCESS/ LANDLORD WORK FIRE ALARM SYSTEM UPGRADE 5TH FLR; THE GOAL IS TO PROVIDE ONE NEW EST ADDRESSABLE FIRE ALARM RELAY, TO INTERFACE WITH TENANT ACCESS CONTROL SYSTEM, TO RELEASE THE DOOR TO THE OUTDOOR PATIO UPON GENERAL FIRE ALARM, PROVIDING EGRESS PATH THROUGH THE STAIRWELL TO… Status: Issued | Not published | — |
| applied Sep 9 | #2026-066961-000-00-FA Facility Permit · Alteration SINGLE PDF PROCESS/ LANDLORD WORK COMMON AREA UPGRADES 6TH FLR; DEMO WALLS, NEW WALLS TO REMODEL RESTRMS, REMODEL ELEVATOR LOBBY, CORRIDORS, CEILING, FLOORING, FINISHES AND ELEC Status: Issued | Not published | — |
| applied Aug 25 | #2026-063006-000-00-FA Facility Permit · Alteration SINGLE PDF PROCESS/ ERNST AND YOUNG STE 600 6TH FLR TI; DEMO WALLS, NEW WALLS TO CREATE STORAGE RMS, COATS RM, RECEPTION, IT STORAGE, CONFERENCE RM, OFFICES, JIT RMS, LIBRARY, MAIL RM, PRINT RM, PRIVACY RM, PANTRY, OPEN OFFICE AREAS, TRAINING RM W/ OPERABLE WALL, HUB AREA, CEILING, FLOORING,… Status: Issued | Not published | — |
| applied Jul 16 | #2026-052515-000-00-FA Facility Permit · Alteration SINGLE PDF PROCESS/ BURNS & WILCOX FIRE ALARM STE 305; INSTALL (2) SMOKE DETECTORS AND (1) ACCESS CONTROL RELAY IN SUITE 305, 2 SMOKE DETECTORS, 1 AUXILIARY PANEL Status: Issued | Not published | $8K |
| applied May 28 | #2026-039049-000-00-ET Electrical Permit · Addition/Alteration/Replacement low voltage data cabling Status: Issued | Not published | — |
| applied May 21 | #2026-037407-000-00-FA Facility Permit · Alteration SINGLE PDF PROCESS/ BURNS & WILCOX FIRE ALARM STE 305 Status: Issued | Not published | — |
| applied May 21 | #2026-037409-000-00-FA Facility Permit · Alteration power, fire alarm, access - BURNS & WILCOX FIRE ALARM STE 305; #305 Burns & Wilcox - new and relocated outlets and furniture feeds, add 2-smoke detectors and access control relay Status: Final | Not published | — |
| applied May 21 | #2026-037544-000-00-FA Facility Permit · Alteration 1-HUB DRAIN, 1-PRIMER, 1-SUPPPLY BOX, 1-SINK, 1-WATER HEATER. Status: Issued | Not published | — |
| applied May 21 | #2026-037553-000-00-FA Facility Permit · Alteration 1-HUB DRAIN, 1-PRIMER, 1-SUPPPLY BOX, 1-SINK, 1-WATER HEATER. Status: Final | Not published | — |
| applied Dec 12 | #2025-099797-000-00-FA Facility Permit · Alteration SINGLE PDF PROCESS/ HENRYS TI 1ST FLR & MEZZANINE; INSTALL GAS LINE Status: Final | Not published | $4.5K |
| applied May 22 | #2025-040709-000-00-FA Facility Permit · Alteration SINGLE PDF PROCESS/ HENRYS TI 1ST FLR & MEZZANINE; EXT - REMOVE EXTERIOR AWNINGS, RECOVER REMAINING EXTERIOR AWNINGS, INT - DEMO WALLS, NEW WALLS TO CREATE RESTRMS, REMODEL BAR, SEATING AREAS, KITCHEN, MEZZANINE, CEILING, FLOORING, FINISHES, PLUMB AND ELEC, 7-LAVS Status: Final | Not published | — |
| applied Oct 24 | #2025-087142-000-00-FA Facility Permit · Alteration data - LANDLORD WORK COMMON AREAS UPGRADES 2ND, 3RD & 9TH FLRS; DEMO WALLS, NEW WALLS TO CREATE 2ND FLR - RESTRMS, SHOWER RMS, CONFERENCE RMS, BREAK/LOUNGE AREA, FITNESS CENTER, CONCRETE STAIRS W/ HANDRAILS, CONCRETE LANDING W/ GUARDRAIL, 3RD FLR - RESTRMS, 9TH FLR - RESTRMS, REMODEL - 3RD FLR & 9… Status: Final | Not published | — |
| applied Sep 8 | #2025-072723-000-00-FA Facility Permit · Alteration SINGLE PDF PROCESS/ LANDLORD WORK BOILER REPLACEMENT ROOF; INSTALL BOILER, PIPING AND ELEC Status: Final | Not published | $56.9K |
| applied Jun 24 | #2025-049998-000-00-FA Facility Permit · Alteration SINGLE PDF PROCESS/ LANDLORD WORK COMMON AREAS UPGRADES 2ND, 3RD & 9TH FLRS; DEMO WALLS, NEW WALLS TO CREATE 2ND FLR - RESTRMS, SHOWER RMS, CONFERENCE RMS, BREAK/LOUNGE AREA, FITNESS CENTER, CONCRETE STAIRS W/ HANDRAILS, CONCRETE LANDING W/ GUARDRAIL, 3RD FLR - RESTRMS, 9TH FLR - RESTRMS, REMODEL… Status: Final | Not published | — |
| applied Sep 8 | #2025-072721-000-00-FA Facility Permit · Alteration SINGLE PDF PROCESS/ LANDLORD WORK BOILER REPLACEMENT ROOF; INSTALL BOILER, PIPING AND ELEC Status: Issued | Not published | — |
| applied Sep 8 | #2025-072795-000-00-FA Facility Permit · Alteration power - LANDLORD WORK BOILER REPLACEMENT ROOF; INSTALL BOILER, PIPING AND ELEC Status: Final | Not published | — |
| applied Sep 8 | #2025-072847-000-00-FA Facility Permit · Alteration SINGLE PDF PROCESS/ LANDLORD WORK BOILER REPLACEMENT ROOF; INSTALL BOILER, MISC PLUMBING. Status: Final | Not published | — |
| applied Aug 21 | #2025-067812-000-00-FA Facility Permit · Alteration SINGLE PDF PROCESS/ LANDLORD WORK COMMON AREAS UPGRADES 2ND, 3RD & 9TH FLRS; REPLACE/ADD/RELOCATE FIRE ALARM FIELD DEVICES, 31 SMOKE DETECTORS, 9 STROBES, 17 SPKRS/STROBES Status: Final | Not published | $38.3K |
| applied Jul 28 | #2025-060431-000-00-FA Facility Permit · Alteration SINGLE PDF PROCESS/ LANDLORD WORK COMMON AREAS UPGRADES 2ND, 3RD & 9TH FLRS; 2ND FLR - INSTALL DUCTWORK, GRILLES, DIFFUSERS, FAN COILS AND ELEC Status: Final | Not published | $96K |
| applied Jun 23 | #2025-049256-000-00-FA Facility Permit · Alteration power - LANDLORD WORK COMMON AREAS UPGRADES 2ND, 3RD & 9TH FLRS; DEMO WALLS, NEW WALLS TO CREATE 2ND FLR - RESTRMS, SHOWER RMS, CONFERENCE RMS, BREAK/LOUNGE AREA, FITNESS CENTER, CONCRETE STAIRS W/ HANDRAILS, CONCRETE LANDING W/ GUARDRAIL, 3RD FLR - RESTRMS, 9TH FLR - RESTRMS, REMODEL - 3RD FLR &… Status: Final | Not published | — |
| applied Jul 24 | #2025-059641-000-00-FA Facility Permit · Alteration SINGLE PDF PROCESS/ LANDLORD WORK COMMON AREAS UPGRADES 2ND, 3RD & 9TH FLRS; RELOCATING, REMOVING AND INSTALLING NEW PENDENT AND UPRIGHT SPRINKLERS TO CONFORM TO NEW WALL AND CEILING LAYOUT FOR NEW OFFICE BUILD OUT, 47 HEADS Status: Final | Not published | $3.5K |
| applied Jun 17 | #2025-048020-000-00-FA Facility Permit · Alteration SINGLE PDF PROCESS/ LANDLORD WORK COMMON AREAS UPGRADES 2ND, 3RD & 9TH FLRS; DEMO WALLS, NEW WALLS TO CREATE 2ND FLR - RESTRMS, SHOWER RMS, CONFERENCE RMS, BREAK/LOUNGE AREA, FITNESS CENTER, CONCRETE STAIRS W/ HANDRAILS, CONCRETE LANDING W/ GUARDRAIL, 3RD FLR - RESTRMS, 9TH FLR - RESTRMS, REMODEL… Status: Final | Not published | $2.6M |
| applied Jun 30 | #2025-050607-000-00-FA Facility Permit · Alteration hvac control - PERKINS COIE 9TH & 10TH FLR TI; DEMO WALLS, EXTERIOR - TERRACE DOOR, INTERIOR - INFILL CONNECTING STAIR BETWEEN 8TH & 9TH FLR, NEW WALLS TO CREATE 9TH FLR - ENTRY, LIBRARY, STORAGE RMS, OFFICE SERVICES RM, WORKSTATIONS, SYSTEMS RM, OFFICES, COPY/COATS RM, HUDDLE RM, COFFEE RM, 10TH… Status: Final | Not published | — |
| applied Jun 17 | #2025-047909-000-00-FA Facility Permit · Alteration SINGLE PDF PROCESS/ PERKINS COIE 9TH & 10TH FLR TI; PROVIDE & INSTALL NEW NOTIFICATION DEVICES, PROVIDE CONDUIT RACEWAY FOR ALL NEW FA CABELING BETWEEN DEVICES, 3 STROBES, 29 SPEAKER STROBES Status: Final | Not published | $20K |
| applied Jun 26 | #2025-050665-000-00-FA Facility Permit · Alteration audio visual - PERKINS COIE 9TH & 10TH FLR TI; DEMO WALLS, EXTERIOR - TERRACE DOOR, INTERIOR - INFILL CONNECTING STAIR BETWEEN 8TH & 9TH FLR, NEW WALLS TO CREATE 9TH FLR - ENTRY, LIBRARY, STORAGE RMS, OFFICE SERVICES RM, WORKSTATIONS, SYSTEMS RM, OFFICES, COPY/COATS RM, HUDDLE RM, COFFEE RM, 10TH… Status: Final | Not published | — |
| applied Jun 17 | #2025-048018-000-00-FA Facility Permit · Alteration SINGLE PDF PROCESS/ LANDLORD WORK COMMON AREAS UPGRADES 2ND, 3RD & 9TH FLRS; DEMO WALLS, NEW WALLS TO CREATE 2ND FLR - RESTRMS, SHOWER RMS, CONFERENCE RMS, BREAK/LOUNGE AREA, FITNESS CENTER, CONCRETE STAIRS W/ HANDRAILS, CONCRETE LANDING W/ GUARDRAIL, 3RD FLR - RESTRMS, 9TH FLR - RESTRMS, REMODEL… Status: Issued | Not published | — |
| applied May 13 | #2025-037874-000-00-FA Facility Permit · Alteration power- HENRYS TI 1ST FLR & MEZZANINE; EXT - REMOVE EXTERIOR AWNINGS, RECOVER REMAINING EXTERIOR AWNINGS, INT - DEMO WALLS, NEW WALLS TO CREATE RESTRMS, REMODEL BAR, SEATING AREAS, KITCHEN, MEZZANINE, CEILING, FLOORING, FINISHES, PLUMB AND ELEC Status: Final | Not published | — |
| applied May 29 | #2025-042300-000-00-FA Facility Permit · Alteration SINGLE PDF PROCESS/ PERKINS COIE 9TH & 10TH FLR TI; RELOCATE SPRINKLERS FOR NEW TENANT IMPROVEMENT, 120 HEADS Status: Final | Not published | $24.4K |
| applied Feb 28 | #2025-015951-000-00-FA Facility Permit · Alteration power, fire alarm - PERKINS COIE 9TH & 10TH FLR TI; DEMO WALLS, EXTERIOR - TERRACE DOOR, INTERIOR - INFILL CONNECTING STAIR BETWEEN 8TH & 9TH FLR, NEW WALLS TO CREATE 9TH FLR - ENTRY, LIBRARY, STORAGE RMS, OFFICE SERVICES RM, WORKSTATIONS, SYSTEMS RM, OFFICES, COPY/COATS RM, HUDDLE RM, COFFEE RM,… Status: Final | Not published | — |
| applied Mar 11 | #2025-018821-000-00-FA Facility Permit · Alteration SINGLE PDF PROCESS/ PERKINS COIE 9TH & 10TH FLR TI; DEMO WALLS, EXTERIOR - TERRACE DOOR, INTERIOR - INFILL CONNECTING STAIR BETWEEN 8TH & 9TH FLR, NEW WALLS TO CREATE 9TH FLR - ENTRY, LIBRARY, STORAGE RMS, OFFICE SERVICES RM, WORKSTATIONS, SYSTEMS RM, OFFICES, COPY/COATS RM, HUDDLE RM, COFFEE RM,… Status: Final | Not published | — |
| applied Jun 3 | #2025-043482-000-00-FA Facility Permit · Alteration data, security-PERKINS COIE 9TH & 10TH FLR TI; DEMO WALLS, EXTERIOR - TERRACE DOOR, INTERIOR - INFILL CONNECTING STAIR BETWEEN 8TH & 9TH FLR, NEW WALLS TO CREATE 9TH FLR - ENTRY, LIBRARY, STORAGE RMS, OFFICE SERVICES RM, WORKSTATIONS, SYSTEMS RM, OFFICES, COPY/COATS RM, HUDDLE RM, COFFEE RM, 10TH… Status: Final | Not published | — |
| applied May 13 | #2025-037653-000-00-FA Facility Permit · Alteration SINGLE PDF PROCESS/ HENRYS TI 1ST FLR & MEZZANINE; EXT - REMOVE EXTERIOR AWNINGS, RECOVER REMAINING EXTERIOR AWNINGS, INT - DEMO WALLS, NEW WALLS TO CREATE RESTRMS, REMODEL BAR, SEATING AREAS, KITCHEN, MEZZANINE, CEILING, FLOORING, FINISHES, PLUMB AND ELEC Status: Final | Not published | $345K |
| applied May 13 | #2025-037623-000-00-FA Facility Permit · Alteration SINGLE PDF PROCESS/ HENRYS TI 1ST FLR & MEZZANINE; EXT - REMOVE EXTERIOR AWNINGS, RECOVER REMAINING EXTERIOR AWNINGS, INT - DEMO WALLS, NEW WALLS TO CREATE RESTRMS, REMODEL BAR, SEATING AREAS, KITCHEN, MEZZANINE, CEILING, FLOORING, FINISHES, PLUMB AND ELEC Status: Issued | Not published | — |
| applied Apr 29 | #2025-014662-REV-01-FA Facility Permit · Alteration SINGLE PDF PROCESS/ PERKINS COIE 9TH & 10TH FLR TI; REVISION TO EXISTING STAIR STRUCTURAL SUPPORT Status: Final | Not published | $100K |
| applied Feb 25 | #2025-014664-000-00-FA Facility Permit · Alteration SINGLE PDF PROCESS/ PERKINS COIE 9TH & 10TH FLR TI; INSTALL DUCTWORK, GRILLES, DIFFUSERS, AIR HANDLING UNIT, TERMINAL UNITS, EXHAUST FAN, PIPING AND ELEC Status: Final | Not published | $1.3M |
| applied Feb 25 | #2025-014662-000-00-FA Facility Permit · Alteration SINGLE PDF PROCESS/ PERKINS COIE 9TH & 10TH FLR TI; DEMO WALLS, EXTERIOR - TERRACE DOOR, INTERIOR - INFILL CONNECTING STAIR BETWEEN 8TH & 9TH FLR, NEW WALLS TO CREATE 9TH FLR - ENTRY, LIBRARY, STORAGE RMS, OFFICE SERVICES RM, WORKSTATIONS, SYSTEMS RM, OFFICES, COPY/COATS RM, HUDDLE RM, COFFEE RM,… Status: Final | Not published | $3.6M |
| applied Feb 25 | #2025-014657-000-00-FA Facility Permit · Alteration SINGLE PDF PROCESS/ PERKINS COIE 9TH & 10TH FLR TI; DEMO WALLS, NEW WALLS TO CREATE 9TH FLR - ENTRY, LIBRARY, STORAGE RMS, OFFICE SERVICES RM, WORKSTATIONS, SYSTEMS RM, OFFICES, COPY/COATS RM, HUDDLE RM, COFFEE RM, 10TH FLR - RECEPTION/WAITING AREA, CONFERENCE RMS, PANTRY/WORK LOUNGE/SOCAIL BAR,… Status: Issued | Not published | — |
| applied Oct 24 | #2024-091371-000-00-FA Facility Permit · Alteration cameras, access controls - CPACKET STE 320 3RD FLR TI; DEMO WALLS, NEW WALLS TO CREATE HARDWARE LAB, OFFICES, SHOWER RM, BIKE PARKING RM, CONFERENCE RM, REMODEL, TRAINING RM, RECEPTION AREA, OPEN OFFICE AREA, CEILING, FLOORING, FINISHES, PLUMB AND ELEC Status: Final | Not published | — |
| applied Nov 8 | #2024-095919-000-00-FA Facility Permit · Alteration hvac control - CPACKET STE 320 3RD FLR TI; DEMO WALLS, NEW WALLS TO CREATE HARDWARE LAB, OFFICES, SHOWER RM, BIKE PARKING RM, CONFERENCE RM, REMODEL, TRAINING RM, RECEPTION AREA, OPEN OFFICE AREA, CEILING, FLOORING, FINISHES, PLUMB AND ELEC Status: Final | Not published | — |