Commercial Plumbing work permitted August 11, 2025.
Install a new 4" cast iron rain drain line using no-hub couplings, connecting from the existing collection box on the side of the building to the existing rain drain stack. -Provide and install the required clean-out to allow for leak testing, inspection, and future maintenance access.
Portland’s permit records for this address don’t name a contractor; the permits list the scope, value and dates below.
1 permit issued Aug 11 – Aug 11, newest first.
| Issued | Permit | Contractor | Value |
|---|---|---|---|
| applied Aug 11 | #2025-064800-000-00-PT Plumbing Permit · Addition/Alteration/Replacement Install a new 4" cast iron rain drain line using no-hub couplings, connecting from the existing collection box on the side of the building to the existing rain drain stack. -Provide and install the required clean-out to allow for leak testing, inspection, and future maintenance access. Status: Final | Not published |
| — |