Commercial General Building, Electrical work permitted November 14, 2024, with 25 permits through August 26, 2026, declaring $1,343,955 of work.
SINGLE PDF PROCESS/ LANDLORD WORK HVAC 1ST FLR & ROOF; INSTALL DUCTWORK, GRILLES, WATER COOLED CHILLERS, COOLING TOWER, PUMPS, VARIABLE FREQUENCY DRIVES, AIR SEPARATOR, STRAINERS, PIPING AND ELEC
Portland’s permit records for this address don’t name a contractor; the permits list the scope, value and dates below.
25 permits issued Nov 14 – Aug 26, newest first.
| Issued | Permit | Contractor | Value |
|---|---|---|---|
| applied Aug 26 | #2026-063589-000-00-FA Facility Permit · Alteration access - COFFMAN ENGINEERS STE 1900 9TH FLR TI; DEMO WALLS, NEW WALLS TO CREATE STOREFRONT DOORWAYS, LOUNGE/COLLAB AREA, WELLNESS RM, WORK/SUPPLY RM, CONFERENCE RM, OFFICE, RECEPTION AREA, REMODEL OFFICES, CONFERENCE RM, OPEN OFFICE AREA, BREAK RM, CEILING, FLOORING, FINISHES, PLUMB AND ELEC Status: Final | Not published |
| — |
| applied Aug 4 | #2026-057535-000-00-FA Facility Permit · Alteration data, HDMI - COFFMAN ENGINEERS STE 1900 9TH FLR TI; DEMO WALLS, NEW WALLS TO CREATE STOREFRONT DOORWAYS, LOUNGE/COLLAB AREA, WELLNESS RM, WORK/SUPPLY RM, CONFERENCE RM, OFFICE, RECEPTION AREA, REMODEL OFFICES, CONFERENCE RM, OPEN OFFICE AREA, BREAK RM, CEILING, FLOORING, FINISHES, PLUMB AND ELEC Status: Final | Not published | — |
| applied Jul 15 | #2026-052113-000-00-FA Facility Permit · Alteration SINGLE PDF PROCESS/ COFFMAN ENGINEERS STE 1900 9TH FLR TI; INSTALL (1) SMOKE DETECTOR AND (1) ACCESS CONTROLS RELAY, EXISTING DEVICES TO REMAIN IN SUITE 1900, 1 SMOKE DETECTOR, 1 AUXILIARY PANEL Status: Final | Not published | $8K |
| applied Jul 8 | #2026-050307-000-00-FA Facility Permit · Alteration SINGLE PDF PROCESS/ COFFMAN ENGINEERS STE 1900 9TH FLR TI; INSTALL DUCTWORK, GRILLES, DIFFUSERS AND ELEC Status: Issued | Not published | $9K |
| applied Jun 25 | #2026-046709-000-00-FA Facility Permit · Alteration SINGLE PDF PROCESS/ COFFMAN ENGINEERS STE 1900 9TH FLR TI; ADD/RELOCATE FIRE SPRINKLER HEADS FOR OFFICE TENANT IMPROVEMENT, 8 HEADS Status: Final | Not published | $2.5K |
| applied Jun 9 | #2026-042208-000-00-FA Facility Permit · Alteration SINGLE PDF PROCESS/ COFFMAN ENGINEERS STE 1900 9TH FLR TI; DEMO WALLS, NEW WALLS TO CREATE STOREFRONT DOORWAYS, LOUNGE/COLLAB AREA, WELLNESS RM, WORK/SUPPLY RM, CONFERENCE RM, OFFICE, RECEPTION AREA, REMODEL OFFICES, CONFERENCE RM, OPEN OFFICE AREA, BREAK RM, CEILING, FLOORING, FINISHES, PLUMB AND… Status: Final | Not published | — |
| applied Jun 2 | #2026-040100-000-00-FA Facility Permit · Alteration SINGLE PDF PROCESS/ COFFMAN ENGINEERS STE 1900 9TH FLR TI; DEMO WALLS, NEW WALLS TO CREATE STOREFRONT DOORWAYS, LOUNGE/COLLAB AREA, WELLNESS RM, WORK/SUPPLY RM, CONFERENCE RM, OFFICE, RECEPTION AREA, REMODEL OFFICES, CONFERENCE RM, OPEN OFFICE AREA, BREAK RM, CEILING, FLOORING, FINISHES, PLUMB AND… Status: Under Inspection | Not published | $243K |
| applied Jun 2 | #2026-040141-000-00-FA Facility Permit · Alteration power, fire alarm - COFFMAN ENGINEERS STE 1900 9TH FLR TI; DEMO WALLS, NEW WALLS TO CREATE STOREFRONT DOORWAYS, LOUNGE/COLLAB AREA, WELLNESS RM, WORK/SUPPLY RM, CONFERENCE RM, OFFICE, RECEPTION AREA, REMODEL OFFICES, CONFERENCE RM, OPEN OFFICE AREA, BREAK RM, CEILING, FLOORING, FINISHES, PLUMB AND… Status: Final | Not published | — |
| applied Jun 2 | #2026-040097-000-00-FA Facility Permit · Alteration SINGLE PDF PROCESS/ COFFMAN ENGINEERS STE 1900 9TH FLR TI; DEMO WALLS, NEW WALLS TO CREATE STOREFRONT DOORWAYS, LOUNGE/COLLAB AREA, WELLNESS RM, WORK/SUPPLY RM, CONFERENCE RM, OFFICE, RECEPTION AREA, REMODEL OFFICES, CONFERENCE RM, OPEN OFFICE AREA, BREAK RM, CEILING, FLOORING, FINISHES, PLUMB AND… Status: Issued | Not published | — |
| applied Jan 15 | #2026-003548-000-00-FA Facility Permit · Alteration waps-(replaces 25-099315ET) -BOLY WELCH STE 1425 14TH FLR TI; DEMO WALLS, NEW WALLS TO CREATE ENTRY AREA, PHONE RMS, BREAKRM, REMODEL OFFICES, CONFERENCE RM, OPEN OFFICE AREA, CEILING, FLOORING, FINISHES, PLUMB AND ELEC Status: Final | Not published | — |
| applied Dec 5 | #2025-098064-000-00-FA Facility Permit · Alteration SINGLE PDF PROCESS/ BOLY WELCH STE 1425 14TH FLR TI; INSTALL DUCTWORK, DIFFUSERS, GRILLES AND ELEC Status: Final | Not published | $2.7K |
| applied Dec 3 | #2025-097190-000-00-FA Facility Permit · Alteration SINGLE PDF PROCESS/ BOLY WELCH STE 1425 14TH FLR TI; RELOCATE AND/OR ADD FIRE SPRINKLERS TO ACCOMMODATE TENANT IMPROVEMENT, 5 HEADS Status: Final | Not published | $4.2K |
| applied Nov 5 | #2025-090432-000-00-FA Facility Permit · Alteration SINGLE PDF PROCESS/ BOLY WELCH STE 1425 14TH FLR TI; DEMO WALLS, NEW WALLS TO CREATE ENTRY AREA, PHONE RMS, BREAKRM, REMODEL OFFICES, CONFERENCE RM, OPEN OFFICE AREA, CEILING, FLOORING, FINISHES, PLUMB AND ELEC, 1-SUPPLY BOX, 1-COFFEE MAKER, 1-WATER DISPENSER Status: Final | Not published | — |
| applied Oct 31 | #2025-089299-000-00-FA Facility Permit · Alteration power- BOLY WELCH STE 1425 14TH FLR TI; DEMO WALLS, NEW WALLS TO CREATE ENTRY AREA, PHONE RMS, BREAKRM, REMODEL OFFICES, CONFERENCE RM, OPEN OFFICE AREA, CEILING, FLOORING, FINISHES, PLUMB AND ELEC Status: Final | Not published | — |
| applied Oct 31 | #2025-089295-000-00-FA Facility Permit · Alteration SINGLE PDF PROCESS/ BOLY WELCH STE 1425 14TH FLR TI; DEMO WALLS, NEW WALLS TO CREATE ENTRY AREA, PHONE RMS, BREAKRM, REMODEL OFFICES, CONFERENCE RM, OPEN OFFICE AREA, CEILING, FLOORING, FINISHES, PLUMB AND ELEC Status: Under Inspection | Not published | $93.7K |
| applied Oct 31 | #2025-089294-000-00-FA Facility Permit · Alteration SINGLE PDF PROCESS/ BOLY WELCH STE 1425 14TH FLR TI; DEMO WALLS, NEW WALLS TO CREATE ENTRY AREA, PHONE RMS, BREAKRM, REMODEL OFFICES, CONFERENCE RM, OPEN OFFICE AREA, CEILING, FLOORING, FINISHES, PLUMB AND ELEC Status: Issued | Not published | — |
| applied Mar 27 | #2025-023680-000-00-ET Electrical Permit · New Construction D250140 - Install fiber optic cable from 1st floor MPOE to suite 600 DKS network rack Status: Final | Not published | — |
| applied Feb 21 | #2025-014073-000-00-ET Electrical Permit · New Construction D250101 Install Comcast service coax to suite 700 US Bankruptcy Court fro 7th floor riser Status: Final | Not published | — |
| applied Feb 5 | #2025-009573-000-00-FA Facility Permit · Alteration power-6th & Main 14th Floor; Rework existing duplex receptacles to now be quad receptacles Status: Final | Not published | — |
| applied Feb 5 | #2025-009570-000-00-FA Facility Permit · Alteration 6th & Main 14th Floor; Rework existing duplex receptacles to now be quad receptacles Status: Issued | Not published | — |
| applied Jan 30 | #2025-007983-000-00-ET Electrical Permit · Addition/Alteration/Replacement Extend 1 100amp circuit feeding 2 50amp heaters. Status: Final | Not published | — |
| applied Dec 17 | #2024-105629-000-00-FA Facility Permit · Alteration LANDLORD WORK BASEMENT; INSTALL ONE NEW DUAL MONITOR MODULE, TO MONITOR THE NEW TAMPER SWITCHES ASSOCIATED WITH THE NEW SPRINKLER BACKFLOW DEVICES, 2 ADDRESSABLE MONITORING MODULES Status: Final | Not published | $6K |
| applied Dec 17 | #2024-105626-000-00-FA Facility Permit · Alteration LANDLORD WORK BASEMENT; INSTALL ONE NEW DUAL MONITOR MODULE, TO MONITOR THE NEW TAMPER SWITCHES ASSOCIATED WITH THE NEW SPRINKLER BACKFLOW DEVICES, 2 ADDRESSABLE MONITORING MODULES Status: Issued | Not published | — |
| applied Aug 19 | #2024-071449-000-00-FA Facility Permit · Alteration power-LANDLORD WORK HVAC 1ST FLR & ROOF; INSTALL DUCTWORK, GRILLES, WATER COOLED CHILLERS, COOLING TOWER, PUMPS, VARIABLE FREQUENCY DRIVES, AIR SEPARATOR, STRAINERS, PIPING AND ELEC Status: Final | Not published | — |
| applied Aug 16 | #2024-070977-000-00-FA Facility Permit · Alteration SINGLE PDF PROCESS/ LANDLORD WORK HVAC 1ST FLR & ROOF; INSTALL DUCTWORK, GRILLES, WATER COOLED CHILLERS, COOLING TOWER, PUMPS, VARIABLE FREQUENCY DRIVES, AIR SEPARATOR, STRAINERS, PIPING AND ELEC Status: Issued | Not published | $975K |