Get ProEvery project in every city · from $79/mo
Get Promultifamily project · Portland, OR
Multifamily General Building, Electrical, Fire Protection, Plumbing work permitted February 6, 2026, with 4 permits through September 15, 2026, declaring $1,000,000 of work.
PDOX PS: REPAIR FIRE DAMAGE TO SIX UNITS IN EXISTING 3-STORY BUILDING. INCLUDES REPAIRING EXTERIOR DAMAGE TO ROOF, WALLS, DECKS, STAIRS, AND SMALL ADDITION ON EXTERIOR TO CREATE A FIRE PUMP ROOM.
Portland’s permit records for this address don’t name a contractor; the permits list the scope, value and dates below.
4 permits issued Feb 6 – Sep 15, newest first.
| Issued | Permit | Contractor | Value |
|---|---|---|---|
| applied Aug 20 | #2026-060758-000-00-FS Fire Systems Permit · New SPRINKLER - INSTALL A CPVC SPRINKLER SYSTEM IN THE 4 APARTMENTS THAT BURNED. STARTS AT 1' ABOVE FINISHED FLOOR OF THE RISER ROOM. SYSTEM IS DESIGNED TO RESIDENTIAL HAZARD (REV: ADDITION OF UNDERGROUND) |
Status: Under Inspection
| Not published |
| — |
| applied Feb 6 | #2026-009327-000-00-CO Commercial Building Permit · Addition PDOX PS: REPAIR FIRE DAMAGE TO SIX UNITS IN EXISTING 3-STORY BUILDING. INCLUDES REPAIRING EXTERIOR DAMAGE TO ROOF, WALLS, DECKS, STAIRS, AND SMALL ADDITION ON EXTERIOR TO CREATE A FIRE PUMP ROOM. Status: Under Inspection | Not published | $1M |
| applied Jul 22 | #2026-054170-000-00-PT Plumbing Permit · Addition/Alteration/Replacement 2- Lav sinks 2- water closets 1- tub shower 1-shower 1- kitchen sink 1-water heater 1-clothes washer box for units 1A, 1B, 2A, 2B, 3A, 3B Status: Under Inspection | Not published | — |
| applied Feb 6 | #2026-009389-000-00-ET Electrical Permit · Addition/Alteration/Replacement Rewire of 6 apartments due to fire. Status: Under Inspection | Not published | — |