Commercial General Building, Electrical work permitted July 23, 2025, with 9 permits through January 28, 2026, declaring $416,918 of work.
SINGLE PDF PROCESS/ MULTCO ELECTIONS BUILDING GENERATOR ROOM INT & EXT; MINOR DEMO, ROOF - INSTALL METAL PENTHOUSE, CURBS, EXTERIOR - INSTALL OVERHEAD DOOR, ACCESS DOOR, INTERIOR 1ST FLOOR - NEW WALLS TO CREATE ELECTRICAL RM, HALLWAY, GENERATOR RM, CABINET, MECHANICAL SHAFT TO ROOF, INSTALL METAL ACCESS PLATFORM & STAIRS W/ HANDRAIL, REMODEL BLUE RM (ELEC), INFILL RAMP, CEILING, FLOORING, FINISHES, GAS PIPING AND ELEC
Portland’s permit records for this address don’t name a contractor; the permits list the scope, value and dates below.
9 permits issued Jul 23 – Jan 28, newest first.
| Issued | Permit | Contractor | Value |
|---|---|---|---|
| applied Jan 16 | #2025-068820-REV-01-FA Facility Permit · Alteration SINGLE PDF PROCESS/ MULTCO ELECTIONS BUILDING GENERATOR ROOM INT & EXT; REVISION TO REMOVE GEOFOAM SPECIAL INSPECTION REQUIREMENT Status: Final |
| Not published |
| — |
| applied Nov 14 | #2025-092699-000-00-ET Electrical Permit · Addition/Alteration/Replacement PDOX - MULTCO ELECTIONS BLDG GENERATOR: REMOVE AND RELOCATE EXISTING LIGHTS, POWER, AND DATA. RECONFIGURE POWER TO GENERATOR FROM EXISTING ATS. Status: Final | Not published | — |
| applied Nov 24 | #2025-095713-000-00-FA Facility Permit · Alteration SINGLE PDF PROCESS/ MULTCO ELECTIONS BUILDING GENERATOR ROOM INT & EXT; RELOCATING/INSTALLING NEW PIPE AND PENDENT SPRINKLERS TO CONFORM TO NEW GENERATOR ROOM BUILD OUT, 12 HEADS Status: Final | Not published | $6.2K |
| applied Nov 24 | #2025-095668-000-00-FA Facility Permit · Alteration INSTALL CATCH BASIN AND SUMP PUMP IN BASEMENT. Status: Issued | Not published | — |
| applied Nov 24 | #2025-095677-000-00-FA Facility Permit · Alteration INSTALL CATCH BASIN AND SUMP PUMP IN BASEMENT. Status: Final | Not published | — |
| applied Aug 25 | #2025-068826-000-00-FA Facility Permit · Alteration SINGLE PDF PROCESS/ MULTCO ELECTIONS BUILDING GENERATOR ROOM INT & EXT; EXTERIOR/ROOF - INSTALL LOUVERS, INTAKE HOOD, INTERIOR - INSTALL GENERATOR, DUCT SILENCERS, ELECTRIC HEATER, DUCTWORK, GRILLES, GAS PIPING AND ELEC Status: Final | Not published | $100K |
| applied Aug 25 | #2025-068820-000-00-FA Facility Permit · Alteration SINGLE PDF PROCESS/ MULTCO ELECTIONS BUILDING GENERATOR ROOM INT & EXT; MINOR DEMO, ROOF - INSTALL METAL PENTHOUSE, CURBS, EXTERIOR - INSTALL OVERHEAD DOOR, ACCESS DOOR, INTERIOR 1ST FLOOR - NEW WALLS TO CREATE ELECTRICAL RM, HALLWAY, GENERATOR RM, CABINET, MECHANICAL SHAFT TO ROOF, INSTALL METAL… Status: Final | Not published | $304K |
| applied Aug 25 | #2025-068817-000-00-FA Facility Permit · Alteration SINGLE PDF PROCESS/ MULTCO ELECTIONS BUILDING GENERATOR ROOM INT & EXT; MINOR DEMO, ROOF - INSTALL METAL PENTHOUSE, CURBS, EXTERIOR - INSTALL OVERHEAD DOOR, ACCESS DOOR, INTERIOR 1ST FLOOR - NEW WALLS TO CREATE ELECTRICAL RM, HALLWAY, GENERATOR RM, CABINET, MECHANICAL SHAFT TO ROOF, INSTALL METAL… Status: Issued | Not published | — |
| applied Jul 10 | #2025-055189-000-00-FA Facility Permit · Alteration SINGLE PDF PROCESS/ MULTCO ELECTIONS BUILDING FIRE SPRINKLER UPGRADE BSMT, 1ST FLR, ATTIC; ADD A SINGLE PRE-ACTION RISER/ZONE TO COVER MULTIPLE ROOMS, THE ROOMS CURRENTLY ARE EQUIPPED WITH SMOKE DETECTION, ONE ADDITIONAL WET VALVE + TAMPER WILL ALSO BE ADDED AND MONITORED, SHUNT TRIP AND SHUNT… Status: Final | Not published | $6.7K |