Get Procommercial project · Portland, OR
Commercial General Building, Electrical, Fire Protection, Hvac/Mechanical, Plumbing, Sign work permitted November 18, 2024, with 41 permits through August 10, 2026, declaring $16,490,833 of work.
MC BELMONT LIBRARY - Renovation and mandatory seismic upgrade of existing building and new two-story addition with a separate, detached trash enclosure (<120 s.f.); includes associated site work *** w/24-048486-MT ***
Portland’s permit records for this address don’t name a contractor; the permits list the scope, value and dates below.
41 permits issued Nov 18 – Aug 10, newest first.
| Issued | Permit | Contractor | Value |
|---|---|---|---|
| applied Aug 10 | #2026-059112-000-00-ET |
Electrical Permit · Addition/Alteration/Replacement
(1) branch electrical circuit for connection for an Illuminated Sign
Status: Final
| Not published |
| — |
| applied Jul 6 | #2026-048086-000-00-CO Commercial Building Permit · Alteration SINGLE PDF - REPLACE EXISTING CUPOLA LIKE FOR LIKE DUE TO WATER DAMAGE. Status: Under Inspection | Not published | $81K |
| applied Apr 6 | #2026-024221-000-00-SG Sign Permit · New Sign/Awning SINGLE PDF - 1 OF 3 - SIGN AA1 - NEW 28.17SQFT ILLUMINATED FREESTANDING SIGN AT NORTH WEST CORNER Status: Final | Not published | — |
| applied Apr 6 | #2026-024227-000-00-SG Sign Permit · New Sign/Awning SINGLE PDF - 2 OF 3 - SIGN AA3 - NEW NONILLUMINATED 8.8 SQFT FASCIA SIGN ON WEST ELEVATION Status: Final | Not published | — |
| applied Apr 6 | #2026-024229-000-00-SG Sign Permit · New Sign/Awning SINGLE PDF - 3 OF 3 - SIGN BB1 - NEW NONILLUMINATED 5.08 SQFT FREESTANDING DIRECTIONAL SIGN AT NORTHWEST STREET FRONTAGE Status: Final | Not published | — |
| applied Apr 3 | #2024-048482-REV-08-CO Commercial Building Permit · Addition MC BELMONT LIBRARY - REV-08 to DFS-11 - Revision to metal stair 2; update detail 4 on Z1.0 Stair Layout from 5-1/2" anchor to 5" anchor Status: Final | Not published | — |
| applied Dec 11 | #2024-048482-DFS-13-CO Commercial Building Permit · Addition MC BELMONT LIBRARY - DFS-13 - Exterior aluminum ladder at BOH location Status: Final | Not published | — |
| applied Feb 25 | #2024-048482-REV-07-CO Commercial Building Permit · Addition MC BELMONT LIBRARY - REV-07 to DFS-17 - Revision to attachment detail for ramp handrail in Circ 140 at south side of ramp due to in-slab piping conflict Status: Final | Not published | — |
| applied Dec 2 | #2024-048482-REV-04-CO Commercial Building Permit · Addition MC BELMONT LIBRARY - REV-04 - Revision to remove the welded detail and special inspection for shoring Status: Final | Not published | — |
| applied Dec 26 | #2025-102747-000-00-CO Commercial Building Permit · Alteration MC BELMONT LIBRARY - New library shelving (see 24-048482-CO) Status: Final | Not published | $130K |
| applied Jan 21 | #2024-048482-DFS-15-CO Commercial Building Permit · Addition MC BELMONT LIBRARY - DFS-15 - Aluminum ladder from Level 2 to mechanical well (ships ladder) Status: Final | Not published | — |
| applied Jan 20 | #2024-048482-DFS-14-CO Commercial Building Permit · Addition MC BELMONT LIBRARY - DFS-14 - Exterior decorative metal fencing with gates Status: Final | Not published | — |
| applied Jan 21 | #2024-048482-DFS-16-CO Commercial Building Permit · Addition MC BELMONT LIBRARY - DFS-16 - Exterior metal railings and guardrail on site Status: Final | Not published | — |
| applied Jan 22 | #2024-048482-DFS-17-CO Commercial Building Permit · Addition MC BELMONT LIBRARY - DFS-17 - Interior handrails and guardrails at Stair 1 and concrete ramp and stairs Status: Final | Not published | — |
| applied Nov 25 | #2024-048482-DFS-12-CO Commercial Building Permit · Addition MC BELMONT LIBRARY - DFS-12 - Precast concrete treads at Stair 1 Status: Final | Not published | — |
| applied Nov 18 | #2025-093597-000-00-FS Fire Systems Permit · New HAZARDOUS / TANK - SET TWO 500 GALLON PROPANE TANKS TO BE USED FOR TEMP HEATING***REVISION TO ADD 3RD TANK*** Status: Final | Not published | — |
| applied Oct 27 | #2024-048482-REV-06-CO Commercial Building Permit · Addition MC BELMONT LIBRARY - REV-06 - Revisions to the exterior canopy on the east side of the building to account for updated PGE routing requirements and current as-built conditions Status: Final | Not published | — |
| applied Aug 6 | #2024-048482-DFS-07-CO Commercial Building Permit · Addition MC BELMONT LIBRARY - DFS-07 - Seismic anchorage and bracing for electrical equipment Status: Final | Not published | — |
| applied Jul 3 | #2024-048482-DFS-06-CO Commercial Building Permit · Addition MC BELMONT LIBRARY - DFS-06 - Vibration and seismic bracing for HVAC systems Status: Final | Not published | — |
| applied Sep 29 | #2024-048482-DFS-10-CO Commercial Building Permit · Addition MC BELMONT LIBRARY - DFS-10 - Exterior handrail & guardrail at Stair 3 Status: Final | Not published | — |
| applied Oct 6 | #2024-048482-DFS-11-CO Commercial Building Permit · Addition MC BELMONT LIBRARY - DFS-11 - Stair 2 and handrails and associated railings in NE corner of building Status: Final | Not published | — |
| applied Jul 28 | #2024-048482-DFS-08-CO Commercial Building Permit · Addition MC BELMONT LIBRARY - DFS-08 - Glazing and storefront system Status: Final | Not published | — |
| applied Sep 24 | #2024-048482-REV-05-CO Commercial Building Permit · Addition MC BELMONT LIBRARY - REV-05 to DFS-02 - Revision to add framing at the mechanical well Status: Final | Not published | — |
| applied Aug 28 | #2024-048482-DFS-09-CO Commercial Building Permit · Addition MC BELMONT LIBRARY - DFS-09 - Seismic bracing/strapping for plumbing equipment Status: Final | Not published | — |
| applied Jul 2 | #2024-048482-DFS-04-CO Commercial Building Permit · Addition MC BELMONT LIBRARY - DFS-04 - Seismic bracing for fire suppression sprinkler system Status: Final | Not published | — |
| applied Jul 17 | #2025-057687-000-00-FS Fire Systems Permit · New ALARM - INSTALLATION OF A NEW NOTIFIER FIRE ALARM AND OCCUPANT NOTIFICATION SYSTEM. Status: Final | Not published | — |
| applied May 12 | #2024-048482-DFS-02-CO Commercial Building Permit · Addition MC BELMONT LIBRARY - DFS-02 - Exterior cold formed metal framing Status: Final | Not published | — |
| applied Jun 26 | #2024-048482-DFS-05-CO Commercial Building Permit · Addition MC BELMONT LIBRARY - DFS-05 - Fall restraint system Status: Final | Not published | — |
| applied Jul 9 | #2025-054531-000-00-ET Electrical Permit · Addition/Alteration/Replacement Cat 6 cabling, Cat 6a cabling for WAPs, Access Control Cabling for doors Status: Final | Not published | — |
| applied May 21 | #2024-048482-DFS-03-CO Commercial Building Permit · Addition MC BELMONT LIBRARY - DFS-03 - Acoustical ceilings Status: Final | Not published | — |
| applied Apr 18 | #2024-048482-DFS-01-CO Commercial Building Permit · Addition MC BELMONT LIBRARY - DFS-01 - Helical wall tie anchors Status: Final | Not published | — |
| applied Apr 16 | #2025-028545-000-00-FS Fire Systems Permit · New UNDERGROUND - INSTALL 80LF OF 6" FIRE WATER Status: Final | Not published | — |
| applied Apr 15 | #2025-029427-000-00-PT Plumbing Permit · New Construction INSTALLATION OF 588LF OF STORM 93LF OF STORM SEWER 106LF OF DOMESTIC WATER Status: Final | Not published | — |
| applied Apr 2 | #2024-048482-REV-03-CO Commercial Building Permit · Addition MC BELMONT LIBRARY - REV-03 - Revision to reroute sanitary stormwater line Status: Final | Not published | — |
| applied Mar 20 | #2025-021458-000-00-FS Fire Systems Permit · New SPRINKLER - START 5' FROM THE BUILDING'S FOOTPRINT AND INSTALL NEW WET SYSTEM FOR NEW 2-STORY WOOD BUILDING. INSTALL NEW DRY SYSTEM FOR EXISTING ONE STORY WOOD BUILDING Status: Final | Not published | — |
| applied Apr 8 | #2025-027323-000-00-ET Electrical Permit · Addition/Alteration/Replacement HVAC Control Wiring 24 volt Status: Final | Not published | — |
| applied Jan 27 | #2024-048482-REV-02-CO Commercial Building Permit · Addition MC BELMONT LIBRARY - REV-02 - Revision to add shoring Status: Final | Not published | $180K |
| applied Dec 27 | #2024-105027-000-00-ET Electrical Permit · Addition/Alteration/Replacement PDOX NEW LIBRARY ADDITION AND REMODEL, SCOPE: ONE LINE, BRANCH, MECHANICAL CONNECTIONS, LIGHTING/LIGHTING CONTROLS, AND (2) TEMP POWER SERVICES, fire alarm Status: Final | Not published | — |
| applied Jan 15 | #2024-048482-REV-01-CO Commercial Building Permit · Addition MC BELMONT LIBRARY - REV-01 - Remove (1) existing tree; drawings include updates to planting plan in response to tree removal and updated tree protection plan Status: Final | Not published | — |
| applied Jul 1 | #2024-048486-000-00-MT Mechanical Permit · Addition/Alteration/Replace (MT) MT - MC BELMONT LIBRARY - Demolish existing HVAC system and install new system to include (2) heat recovery ventilators, (2) variable refrigerant flow heat pumps, (4) 1.5-ton condensing units, (16) indoor fan coils of various styles, (1) VRF-to-hydronic heat exchanger and its associated piping… Status: Final | Not published | — |
| applied Jul 1 | #2024-048482-000-00-CO Commercial Building Permit · Addition MC BELMONT LIBRARY - Renovation and mandatory seismic upgrade of existing building and new two-story addition with a separate, detached trash enclosure (<120 s.f.); includes associated site work *** w/24-048486-MT *** Status: Final | Not published | $16.1M |