Get ProEvery project in every city · from $79/mo
Get Procommercial project · Portland, OR
Commercial General Building, Electrical, Fire Protection, Hvac/Mechanical, Sign work permitted October 29, 2024, with 30 permits through October 22, 2026, declaring $21,727,715 of work.
PDOX PS - TI FOR EXISTING TENANT, NO CHANGE OF OCCUPANCY. NEW EMERGENCY GENERATOR AND 30,000 GAL BELOW GROUND FUEL TANK, MODIFICATIONS TO MECHANICAL ROOM IN BASEMENT, MATERIALS MANAGEMENT AREA, NURSING TOWER, AND LINEN STORAGE ON LOWER LEVEL, MATERIALS MANAGEMENT AREA AND NURSING TOWER ON FIRST FLOOR, AND NURSING TOWER ON SECOND THROUGH FIFTH FLOORS FOR ELECTRICAL ROUTING. w/24-002408-CO & 24-002418 -MT
Portland’s permit records for this address don’t name a contractor; the permits list the scope, value and dates below.
30 permits issued Oct 29 – Oct 22, newest first.
| Issued | Permit | Contractor | Value |
|---|---|---|---|
| applied Oct 7 |
#2026-074517-000-00-FA
Facility Permit · Alteration
SINGLE PDF PROCESS/ ADVENTIST MED CENTER PET CT REMODEL LEVEL 1; RELOCATING SPRINKLER HEADS PER NEW WALL LAYOUT, 14 HEADS
Status: Issued
| Not published |
| $13.1K |
| applied Sep 11 | #2026-067584-000-00-FA Facility Permit · Alteration power - ADVENTIST MED CENTER PET CT REMODEL LEVEL 1; DEMO WALLS, NEW WALLS TO CREATE WORK RM, CT ROOM #3 - OFFICE, CONTROL RM, UPTAKE ROOM - RESTRM, CORRIDOR, UPTAKE RMS, HOT LAB, REMODEL - STAFF LOUNGE, RAD NURSE RM, CEILING, FLOORING, FINISHES, PLUMB AND ELEC Status: Issued | Not published | — |
| applied Sep 11 | #2026-067612-000-00-FA Facility Permit · Alteration SINGLE PDF PROCESS/ ADVENTIST MEDICAL CENTER ELEVATOR MODERNIZATION ALL FLRS; REMOVING SPRINKLER SYSTEM IN ELEVATOR RM 1 & 2 DUE TO NEW BELT DRIVE ELEVATOR EQUIPMENT Status: Issued | Not published | $3.6K |
| applied Sep 8 | #2026-066657-000-00-FA Facility Permit · Alteration power - ADVENTIST MEDICAL CENTER ELEVATOR MODERNIZATION ALL FLRS; MINOR DEMO, LVL 6 - INFILL WALL, FINISHES AND ELEC Status: Issued | Not published | — |
| applied Sep 2 | #2026-065449-000-00-FA Facility Permit · Alteration SINGLE PDF PROCESS/ ADVENTIST MEDICAL CENTER ELEVATOR MODERNIZATION ALL FLRS; MINOR DEMO, LVL 6 - INFILL WALL, FINISHES AND ELEC Status: Issued | Not published | — |
| applied Sep 2 | #2026-065599-000-00-FA Facility Permit · Alteration SINGLE PDF PROCESS/ ADVENTIST MED CENTER PET CT REMODEL LEVEL 1; DEMO WALLS, NEW WALLS TO CREATE WORK RM, CT ROOM #3 - OFFICE, CONTROL RM, UPTAKE ROOM - RESTRM, CORRIDOR, UPTAKE RMS, HOT LAB, REMODEL - STAFF LOUNGE, RAD NURSE RM, CEILING, FLOORING, FINISHES, PLUMB AND ELEC Status: Issued | Not published | — |
| applied Jun 26 | #2026-046152-000-00-ET Electrical Permit · Addition/Alteration/Replacement PDOX NEW FEEDERS FOR (4) NEW CHILLERS, BRANCH CIRCUITS FOR (7) PUMPS, VFD INSTALL, BRANCH CIRCUITS FOR EXHAUST FANS70247-25: AHPL ENFRA ENERGY IMPROVEMENTS Status: Issued | Not published | — |
| applied Aug 13 | #2026-060245-000-00-ET Electrical Permit · Addition/Alteration/Replacement Energy improvement Controls Migration Status: Issued | Not published | — |
| applied Aug 8 | #2026-048986-000-00-SG Sign Permit · New Sign/Awning SINGLE PDF - NEW 95 SQFT ILLUMINATED RACE MOUNTED SIGN FOR ADVENTIST HEALTH ON SW ELEVATION ABOVE SE 100TH PEDESTRIAN ENTRANCE **ET SEPARATE** Status: Issued | Not published | — |
| applied Feb 11 | #2026-010624-000-00-FA Facility Permit · Alteration BAS Controller, MSTP CAT5 cable and Tstat.- ADVENTIST MED CENTER WOOD SHOP HVAC UPGRADE; INSTALL DUCTWORK, WATER SOURCE HEAT PUMP AND ELEC Status: Issued | Not published | — |
| applied Feb 26 | #2026-010552-REV-01-FA Facility Permit · Alteration SINGLE PDF PROCESS/ ADVENTIST MED CENTER WOOD SHOP HVAC UPGRADE; REVISION TO STRUCTURAL CALCULATIONS Status: Issued | Not published | — |
| applied Feb 11 | #2026-010552-000-00-FA Facility Permit · Alteration SINGLE PDF PROCESS/ ADVENTIST MED CENTER WOOD SHOP HVAC UPGRADE; INSTALL DUCTWORK, WATER SOURCE HEAT PUMP AND ELEC Status: Issued | Not published | $40K |
| applied Feb 11 | #2026-010542-000-00-FA Facility Permit · Alteration SINGLE PDF PROCESS/ ADVENTIST MED CENTER WOOD SHOP HVAC UPGRADE; INSTALL DUCTWORK, WATER SOURCE HEAT PUMP AND ELEC Status: Issued | Not published | — |
| applied Dec 5 | #2023-103168-DFS-01-CO Commercial Building Permit · Alteration SINGLE PDF - DFS FOR SEISMIC ANCHORAGE FOR ELECTRICAL EQUIPMENT Status: Final | Not published | — |
| applied Nov 25 | #2025-096104-000-00-FA Facility Permit · Alteration 1-ZONE VALVE BOX, 2-OUTLETS Status: Final | Not published | — |
| applied Nov 25 | #2025-096098-000-00-FA Facility Permit · Alteration 1-ZONE VALVE BOX, O2 AND VACUUM OUTLETS Status: Issued | Not published | — |
| applied Oct 9 | #2023-103168-REV-01-CO Commercial Building Permit · Alteration PDOX PS - REVISION TO CHANGE LOCATION OF THE PROPOSED ADDED LANDSCAPE IN THE EAST PARKING AREA. Status: Final | Not published | — |
| applied May 21 | #2025-040092-000-00-FA Facility Permit · Alteration SINGLE PDF PROCESS/ ADVENTIST MEDICAL CENTER HVAC UPGRADE ALL FLRS; INSTALL NEW RETURN & SUPPLY FAN MOTORS ARRAYS, VFDS, VALVES, PIPING AND ELEC Status: Issued | Not published | $5.8M |
| applied Feb 5 | #2024-010058-000-00-FS Fire Systems Permit · Alteration SPRINKLER - FIRE SPRINKLER SYSTEM ADDITION FOR NEW SWITCHGEAR ROOM AND NEW CEILING LAYOUT. Status: Final | Not published | — |
| applied May 21 | #2025-040088-000-00-FA Facility Permit · Alteration SINGLE PDF PROCESS/ ADVENTIST MEDICAL CENTER HVAC UPGRADE ALL FLRS; INSTALL NEW RETURN & SUPPLY FAN MOTORS ARRAYS, VFDS, VALVES, PIPING AND ELEC Status: Issued | Not published | — |
| applied Mar 20 | #2025-021621-000-00-FA Facility Permit · Alteration ADVENTIST MEDICAL CENTER FIRE ALARM BASEMENT TI; ADDING 3 SMOKE DETECTORS, 1 HORN STROBE, 1 STROBE TO TELECOM RM Status: Final | Not published | $6.3K |
| applied Mar 20 | #2025-021620-000-00-FA Facility Permit · Alteration ADVENTIST MEDICAL CENTER FIRE ALARM BASEMENT TI; ADDING 3 SMOKE DETECTORS, 1 HORN STROBE, 1 STROBE TO TELECOM RM Status: Issued | Not published | — |
| applied Feb 4 | #2025-009191-000-00-FA Facility Permit · Alteration ADVENTIST HOSPITAL STERILE PROCESSING DEPT 1ST FLR - INSTALL, RELOCATE, AND ADD A.S. TO NEW FLOOR/CEILING LAYOUT Status: Final | Not published | — |
| applied Jan 29 | #2025-007050-000-00-FS Fire Systems Permit · New HAZARDOUS / TANK - INSTALLING 30,000 GALLON UNDERGROUND DIESEL STORAGE TANK (UST-1) (revised description to no longer include above ground tank) Status: Final | Not published | — |
| applied Jul 5 | #2024-058388-000-00-FA Facility Permit · Alteration power - ADVENTIST HOSPITAL STERILE PROCESSING DEPT 1ST FLR; CREATE INS CART AREAS, ANTE RM, REPLACE & INSTALL INSTRUMENT WASHERS, CART WASHER, CEILING, FLOORING, FINISHES, ELECTRICAL Status: Final | Not published | — |
| applied Jul 9 | #2024-059011-000-00-FA Facility Permit · Alteration SINGLE PDF PROCESS/ ADVENTIST HOSPITAL STERILE PROCESSING DEPT 1ST FLR; DEMO WALLS, NEW WALLS TO CREATE INS CART AREAS, ANTE RM, REPLACE & INSTALL INSTRUMENT WASHERS, CART WASHER, CEILING, FLOORING, FINISHES, PLUMB AND ELEC, 1-FLOOR SINK, 1-FLOOR DRAIN, 1-TRAP PRIMER Status: Final | Not published | — |
| applied Oct 23 | #2024-091051-000-00-MT Mechanical Permit · Addition/Alteration/Replace (MT) SINGLE PDF - INSTALLING AST-1 ABOVE GROUND DIESEL FUEL TANK , INSTALLING UST-1 30,000 GAL BELOW GROUND DIESEL FUEL TANK, FSP FUEL POLISHERS, TS-1 TRANSITION PUMP, DT-1 DAY TANK WITH CONTROLS, FUELING PIPING, VENTING AND SEISMIC, CONNECT TO NEW REPLACEMENT GENERATOR. SEE 23-103168-CO Status: Final | Not published | — |
| applied Sep 24 | #2024-080010-000-00-FS Fire Systems Permit · Alteration ALARM - FIRE ALARM ALTERATION Status: Final | Not published | — |
| applied Jan 30 | #2023-103168-000-00-CO Commercial Building Permit · Alteration PDOX PS - TI FOR EXISTING TENANT, NO CHANGE OF OCCUPANCY. NEW EMERGENCY GENERATOR AND 30,000 GAL BELOW GROUND FUEL TANK, MODIFICATIONS TO MECHANICAL ROOM IN BASEMENT, MATERIALS MANAGEMENT AREA, NURSING TOWER, AND LINEN STORAGE ON LOWER LEVEL, MATERIALS MANAGEMENT AREA AND NURSING TOWER ON FIRST… Status: Final | Not published | $15.9M |
| applied Feb 1 | #2024-002418-000-00-MT Mechanical Permit · Addition/Alteration/Replace (MT) PDOX PS - NEW FAN COIL TO SUPPORT COOLING NEEDS FOR A NEW ELECTRICAL ROOM. MODIFICATIONS TO DUCTWORK TO SUPPORT REROUTING AND NEW ELECTRICAL CONDUIT. DDC CONTROLS UPGRADE TO MONITOR NEW ELECTRICAL EQUIPMENT. w/23-103168-CO & 24-002408-CO Status: Final | Not published | — |