Get ProEvery project in every city · from $79/mo
Get Procommercial project · Portland, OR
Commercial General Building, Electrical, Fire Protection work permitted November 6, 2024, with 18 permits through August 11, 2026, declaring $3,578,000 of work.
SINGLE PDF PROCESS/ MONDELEZ BAKERY TI 1-3 FLRS; DEMO WALLS, NEW WALLS TO CREATE 1ST FLR - CAFETERIA, PRAYER RM, ENTRY, TRAINING RM, VESTIBULES, ATTENDANT RMS, LOCKER RMS W/ SHOWERS, RESTRMS W/ SHOWERS, MOTHERS RM, STORAGE RMS, EMPLOYEE STORE, ENTRY LOBBY, MAIL/PACKAGE RM, LOUNGE, NURSE STATION, CIRCULATION AREAS, MARKET AREA, PHONE RMS, RESTRM, 2ND FLR - VESTIBULES, RESTRMS, STORAGE RM, 3RD FLR - RESTRMS, PIPES RM, MIXING OFFICE, BREAK RM, CEILING, FLOORING, FINISHES, PLUMB AND ELEC
Portland’s permit records for this address don’t name a contractor; the permits list the scope, value and dates below.
18 permits issued Nov 6 – Aug 11, newest first.
| Issued | Permit | Contractor | Value |
|---|---|---|---|
| applied Aug 11 | #2026-059346-000-00-ET Electrical Permit · Addition/Alteration/Replacement 712745 Mondelez Bakery - Demo Line 5. |
Status: Issued
| Not published |
| — |
| applied Aug 10 | #2026-059019-000-00-ET Electrical Permit · Addition/Alteration/Replacement 713213 DEMO EXISTING EQUIPMENT AND REPLACE WITH NEW MACHINES FROM ITALY-INDUSTRAL BAKERY. (1) 80amp PANEL FEEDER, (2) 480V MOTOR REFEEDS, CONTROL WIRING. Status: Issued | Not published | — |
| applied May 21 | #2026-036725-000-00-ET Electrical Permit · Addition/Alteration/Replacement PDOX 800A BUCKET FEEDING THE NEW MCC SECTIONS. PLEASE REFERENCE PERMIT 26-023580-FA. Status: Final | Not published | — |
| applied Apr 1 | #2026-023580-000-00-FA Facility Permit · Alteration SINGLE PDF PROCESS/ MONDELEZ INTERNATIONAL AIR COMPRESSOR TI; INSTALL AIR COMPRESSOR, DUCTWORK, PIPING AND ELEC Status: Final | Not published | $478K |
| applied Apr 1 | #2026-023579-000-00-FA Facility Permit · Alteration SINGLE PDF PROCESS/ MONDELEZ INTERNATIONAL AIR COMPRESSOR TI; INSTALL AIR COMPRESSOR, DUCTWORK, PIPING AND ELEC Status: Issued | Not published | — |
| applied Jan 17 | #2026-004090-000-00-ET Electrical Permit · Addition/Alteration/Replacement Altering 7 existing circuits that are hooked up to exhaust fans. Disconnecting old exhaust fan units, Reconnecting new units. Status: Final | Not published | — |
| applied Dec 18 | #2025-101464-000-00-FS Fire Systems Permit · Alteration SPRINKLER - REROUTE FIRE SPRINKLER PIPE TO ACCOMMODATE NEW HOPPER INSTALL PER NFPA 13 & LOCAL AHJ STANDARDS. Status: Final | Not published | — |
| applied Nov 10 | #2025-091532-000-00-ET Electrical Permit · Addition/Alteration/Replacement Reinstalling new heat trace on some piping, using existing circuits 2 20amp circuits, swapping 2 of the normal breakers to GFCI breakers. Status: Final | Not published | — |
| applied Jun 16 | #2025-047508-000-00-ET Electrical Permit · Addition/Alteration/Replacement Install new 20amp SCADAPACK RTU with Radio antenna and instruments Status: Final | Not published | — |
| applied Sep 9 | #2024-077739-000-00-FA Facility Permit · Alteration power-MONDELEZ BAKERY TI 1-3 FLRS; DEMO WALLS, NEW WALLS TO CREATE 1ST FLR - CAFETERIA, PRAYER RM, ENTRY, TRAINING RM, VESTIBULES, ATTENDANT RMS, LOCKER RMS W/ SHOWERS, RESTRMS W/ SHOWERS, MOTHERS RM, STORAGE RMS, EMPLOYEE STORE, ENTRY LOBBY, MAIL/PACKAGE RM, LOUNGE, NURSE STATION, CIRCULATION… Status: Final | Not published | — |
| applied Dec 16 | #2024-077624-REV-01-FA Facility Permit · Alteration SINGLE PDF PROCESS/ MONDELEZ BAKERY TI 1-3 FLRS; REVISION TO EXTERIOR - RESURFACE & REPAINT DRIVEWAY, INTERIOR - 1ST FLR - REMOVE EXTIRE SCOPE OF WORK EXCEPT UNISEX RESTRM, 3RD FLR - BREAKRM LAYOUT, CEILING, FLOORING, FINISHES, PLUMB AND ELEC Status: Final | Not published | — |
| applied May 29 | #2024-044136-000-00-FS Fire Systems Permit · New HAZARDOUS/TANK - INSTALL 404 GALLON ABOVE GROUND DIESEL TANK AT MONDELEZ GLOBAL / NABISCO KRAFT. Status: Final | Not published | — |
| applied Nov 25 | #2024-099739-000-00-FA Facility Permit · Alteration MONDELEZ BAKERY TI 1-3 FLRS; ALARM - MODIFICATIONS TO EXISTING FIRE ALARM IN REMODEL AREAS ON 1ST - 3RD FLOORS; REMOVE AND RELOCATE (6) EXISTING NOTIFICATION DEVICES; INSTALL (4) NEW NOTIFICATION DEVICES; INSTALL NEW 4009 NAC PANEL ON 2ND FLOOR RESTROOM & STORAGE ROOM. Status: Final | Not published | — |
| applied Sep 12 | #2024-078812-000-00-FA Facility Permit · Alteration SINGLE PDF PROCESS/ MONDELEZ BAKERY TI 1-3 FLRS; DEMO WALLS, NEW WALLS TO CREATE 1ST FLR - CAFETERIA, PRAYER RM, ENTRY, TRAINING RM, VESTIBULES, ATTENDANT RMS, LOCKER RMS W/ SHOWERS, RESTRMS W/ SHOWERS, MOTHERS RM, STORAGE RMS, EMPLOYEE STORE, ENTRY LOBBY, MAIL/PACKAGE RM, LOUNGE, NURSE STATION,… Status: Final | Not published | — |
| applied Sep 9 | #2024-077629-000-00-FA Facility Permit · Alteration SINGLE PDF PROCESS/ MONDELEZ BAKERY TI 1-3 FLRS; INSTALL 2ND LFR - MINI-SPLIT, EXHAUST FANS, ALL FLRS - DUCTWORK, DIFFUSERS, GRILLES, PIPING AND ELEC Status: Final | Not published | $750K |
| applied Sep 9 | #2024-077624-000-00-FA Facility Permit · Alteration SINGLE PDF PROCESS/ MONDELEZ BAKERY TI 1-3 FLRS; DEMO WALLS, NEW WALLS TO CREATE 1ST FLR - CAFETERIA, PRAYER RM, ENTRY, TRAINING RM, VESTIBULES, ATTENDANT RMS, LOCKER RMS W/ SHOWERS, RESTRMS W/ SHOWERS, MOTHERS RM, STORAGE RMS, EMPLOYEE STORE, ENTRY LOBBY, MAIL/PACKAGE RM, LOUNGE, NURSE STATION,… Status: Final | Not published | $2.4M |
| applied Nov 4 | #2024-094518-000-00-FA Facility Permit · Alteration MONDELEZ BAKERY TI 1-3 FLRS - INSTALL, RELOCATE, & DEMO A.S. TO NEW FLOOR/ CEILING LAYOUT. CUT EXISTING SPRINKLER DROPS TO NEW CEILING HEIGHTS Status: Final | Not published | — |
| applied Nov 6 | #2024-095086-000-00-ET Electrical Permit · Addition/Alteration/Replacement 700074-01 Mondelez - Restroom, Office and break room remodel (East End floors 1,2,3) Status: Final | Not published | — |