Get Procommercial project · Pittsburgh, PA
Commercial General Building, Electrical, Hvac/Mechanical work permitted March 17, 2025, with 9 permits through August 13, 2026, declaring $1,101,832 of work. Contractor on record: Ted Neff.
Get new commercial permits near 15213 or Pittsburgh, free weekly email
REPLACEMENT OF BOILER, GARAGE EXHAUST, HOT WATER HEATER, AND RELATED INFRASTRUCTURE. INSTALL NEW BOILER SYSTEM INCLUDING FUEL GAS PIPING, HYDRONIC PIPING, AND VENTING - ENERGY INSPECTION REQUIRED
Pittsburgh permit records name Ted Neff, Junction Climate Control, Inc. and Independent Mechanical, Inc as the contractors on this project, among 4 contractors in all.
9 permits issued Mar 17 – Aug 13, newest first.
| Issued | Permit | Contractor | Value |
|---|---|---|---|
Commercial and multifamily, biggest first.
#BDA-2026-06709 Building & Development Application · Existing (alteration/addition) INSTALLATION OF REPLACEMENT WINDOWS Status: Issued |
| Not published |
| $25.6K |
#BDA-2026-06671 Building & Development Application · Existing (alteration/addition) INSTALLATION OF REPLACEMENT WINDOWS SAME SIZE & LOCATION Status: Issued | Not published | $24.9K |
#EP-2025-08352 ELECTRICAL · ADDITION / ALTERATION ALTERATION TO THE EXISTING ELECTRICAL SYSTEM IN RELATION TO BDA-2025-04248. WORK INCLUDES NEW CIRCUITS AND LIGHTING. Status: Issued | Ted Neff | $20K |
#MP-2025-07361 MECHANICAL · MINOR ALTERATION Status: Completed | Junction Climate Control, Inc. | $3.2K |
#BDA-2025-08501 Building & Development Application · Existing (alteration/addition) REPLACEMENT OF WINDOWS AT EXISTING APARTMENT BUILDING Status: Issued | Not published | $33.3K |
#EP-2024-14491 ELECTRICAL · ADDITION / ALTERATION ALTERATIONS TO EXISTING ELECTRICAL SYSTEM THAT INCLUDES NEW LIGHTING AND POWER SERVING UPGRADES TO MECHANICAL SYSTEM. Status: Completed | Independent Mechanical, Inc | $5K |
#BDA-2025-04248 Building & Development Application · Existing (alteration/addition) INTERIOR ALTERATION TO RENOVATE AND CHANGE LAYOUT OF THE RESIDENTIAL UNIT. WORK INCLUDES NEW NON-LOAD BEARING WALLS, AND FINISHES Status: Issued | Not published | $150K |
#MP-2024-14490 MECHANICAL · ADDITION / ALTERATION REPLACEMENT OF BOILER, GARAGE EXHAUST, HOT WATER HEATER, AND RELATED INFRASTRUCTURE. INSTALL NEW BOILER SYSTEM INCLUDING FUEL GAS PIPING, HYDRONIC PIPING, AND VENTING - ENERGY INSPECTION REQUIRED Status: Completed | Guy's Mechanical Systems Inc | $830K |
#BDA-2025-01611 Building & Development Application · Existing (alteration/addition) LEVEL 2 ALTERNATIONS, NON STRUCTURAL DEMOLITION OF INTERIOR WALLS IN UNIT 3B IN EXISTING APARTMENT BUILDING Status: Issued | Not published | $10K |
In Pittsburgh, biggest first.