Get ProEvery project in every city · from $33/mo
Get Procommercial project · Pittsburgh, PA
Commercial General Building, Electrical, Fire Protection, Hvac/Mechanical work permitted April 28, 2025, with 15 permits through October 16, 2026, declaring $16,422,163 of work. Contractor on record: Triple Crown Electric, LLC.
OFFICE FIT-OUT OF PARTIAL FLOOR 3 AND FLOORS 4-6 WITH 6TH FLOOR ADDITION, INCLUDING 5TH FLOOR DOUBLE HEIGHT ATRIUM, 4 STORY INTERCONNECTING STAIR, COOKING AND DINING FACILITES, MEETING ROOMS, 5TH EXTERIOR TERRACE WITH NEW STAIR AT GARAGE, AND 6TH FLOOR TERRACES.
Pittsburgh permit records name Triple Crown Electric, LLC, Westmoreland Electric Services, LLC and Elk Air Conditioning Inc as the contractors on this project, among 7 contractors in all.
Phone numbers and the property owner are included with Pro, where the city publishes them.
The contractor on 2 permits issued in the last 30 days is included with Pro.
Commercial and multifamily, biggest first.
15 permits issued Apr 28 – Oct 16, newest first.
| Issued | Permit | Contractor | Value |
|---|---|---|---|
#SSP-2026-06720 Suppression System Permit · MINOR ALTERATION Status: Issued | Contractor with Pro | $7.3K | |
#BDA-2026-06231 Building & Development Application · Existing (alteration/addition) INTERIOR ALTERATIONS TO CONVERT LOCKER ROOMS INTO SINGLE SHARED SHOWER ROOM INCLUDING MULTIPLE SHOWER COMPARTMENTS, BATHROOMS, SINKS AND LOCKERS. Status: Issued | Not published | $215K | |
#SSP-2026-03639 Suppression System Permit · NEW SYSTEM INSTALLATION OF ANSUL SYSTEMS IN 5 COOKING HOODS IN LEVEL 4 KITCHEN AS PART OF OFFICE TENANT FITOUT WITH COOKING AND DINING FACILITIES Status: Completed | Summit Fire & Security, LLC | $17.3K | |
#MP-2026-00899 MECHANICAL · NEW CONSTRUCTION INSTALLATION OF WALK-IN COOLERS AND FREEZER ON LEVEL 4 AS PART OF OFFICE FIT-OUT OF PARTIAL FLOOR 3 AND FLOORS 4-6 WITH COOKING AND DINING FACILITES. Status: Completed | Huckestein Mechanical Services Inc | $40K | |
#FAS-2025-07625 Fire Alarm Permit · ADDITION / ALTERATION MODIFICATIONS TO CORE AND SHELL EVACS SYSTEM AS PART OF INITIAL TENANT FIT-OUT OF OFFICES ON FLOORS 3-6 WITH CAFETERIA/KITCHEN, ATRIUM, FIRE SHUTTERS, AND AUTOMATIC SMOKE DETECTION SYSTEM Status: Completed | Westmoreland Electric Services, LLC | $246K | |
#EP-2025-01610 ELECTRICAL · ADDITION / ALTERATION NEW DISTRIBUTION PANELS, WIRING, POWER, AND LIGHTING AS PART OF INITIAL OFFICE FIT-OUT OF PARTIAL FLOOR 3 AND FLOORS 4-6 WITH 6TH FLOOR ADDITION Status: Completed | Westmoreland Electric Services, LLC | $5.5M | |
#SSP-2025-06303 Suppression System Permit · ADDITION / ALTERATION INSTALLATION F 18 NEW HEADS AND RELOCATON OF EXISTING FOR TENANT FIT OUT Status: Completed | Fire Fighter Sales and Service Co., Inc. | $19.8K | |
#SSP-2025-05311 Suppression System Permit · ADDITION / ALTERATION MODIFICATION OF SHELL SPRINKLER SYSTEM AS PART OF INITIAL OFFICE FIT-OUT OF PARTIAL FLOOR 3 AND FLOORS 4-6 WITH 6TH FLOOR ADDITION Status: Completed | Interstate Fire Protection Co Inc | $400K | |
#FAS-2025-05822 Fire Alarm Permit · ADDITION / ALTERATION FIRE ALARM MODIFICATION FOR INTERIOR TENANT FIT OUT OF 8TH FLOOR OFFICE SPACE Status: Completed | Triple Crown Electric, LLC | $20.7K | |
#MP-2025-04994 MECHANICAL · ADDITION / ALTERATION INSTALL (11) VAV AND (9) FPB UNITS ALONG WITH ALL ASSOCIATED DUCTWORK, GRILLES, AND DIFFUSERS FOR OFFICE FIT OUT Status: Completed | Elk Air Conditioning Inc | $212K | |
#MP-2025-01627 MECHANICAL · ADDITION / ALTERATION NEW HVAC SYSTEM WITH DUCTWORK, PIPING, VAVS, EXHAUSTS, AHUS, MAUS, TYPE I & II HOODS AND DIRECT VENT GAS FIRED PIZZA OVEN AS PART OF OFFICE FIT-OUT OF PARTIAL FLOOR 3 AND FLOORS 4-6 WITH 6TH FLOOR ADDITION Status: Completed | Elk Air Conditioning Inc | $2.2M | |
#EP-2025-04715 ELECTRICAL · ADDITION / ALTERATION FIT OUT OF 8TH FLOOR INCLUDING LIGHTING, SERVICE DISTRIBUTION AND LOW VOLTAGE SYSTEMS. Status: Completed | Triple Crown Electric, LLC | $273K | |
#BDA-2025-05026 Building & Development Application · New Construction INTERIOR TENANT FIT OUT OF 8TH FLOOR OFFICE SPACE Status: Issued | Not published | $210K | |
#EP-2025-03349 ELECTRICAL · ADDITION / ALTERATION ADDITION OF ONE 100A PANEL IN ELECTRICAL ROOM FOR OPEN OFFICE ON SECOND FLOOR TENANT A RELATED TO BP-2023-14013 Status: Completed | Triple Crown Electric, LLC | $16.5K | |
#BDA-2024-02653 Building & Development Application · New Construction OFFICE FIT-OUT OF PARTIAL FLOOR 3 AND FLOORS 4-6 WITH 6TH FLOOR ADDITION, INCLUDING 5TH FLOOR DOUBLE HEIGHT ATRIUM, 4 STORY INTERCONNECTING STAIR, COOKING AND DINING FACILITES, MEETING ROOMS, 5TH EXTERIOR TERRACE WITH NEW STAIR AT GARAGE, AND 6TH FLOOR TERRACES. Status: Completed | Not published | $7M |
In Pittsburgh, biggest first.