Commercial Electrical work permitted October 16, 2026.
Installation of a new 2000A manual transfer switch (UL 1008, 208Y/120V, 3-phase, 4-wire, break-before-make) in the main service line ahead of existing panel MDP-3 (800A main breaker) to allow connection of a portable/standby emergency generator. Includes grounding/bonding relocation as required if the transfer switch becomes the service disconnect. No increase to existing 800A service capacity. All work to be perform according to the 2020 NEC and per approved plans.
This is a new project: its first permit was issued October 16, 2026. The contractor on it is included with Pro, with the phone number, and is named here 30 days after the first permit.
See the contractor1 permit issued Oct 16 – Oct 16, newest first.
| Issued | Permit | Contractor | Value |
|---|---|---|---|
Commercial and multifamily, biggest first.
#EP-2026-008670
Electrical Permit · Addition and/or Alteration
Installation of a new 2000A manual transfer switch (UL 1008, 208Y/120V, 3-phase, 4-wire, break-before-make) in the main service line ahead of existing panel MDP-3 (800A main breaker) to allow connection of a portable/standby emergency generator. Includes grounding/bonding relocation as required if…
Status: Issued
| Contractor with Pro |
| — |