Commercial Electrical, Fire Protection, Hvac/Mechanical, Plumbing work permitted January 9, 2025, with 5 permits through April 3, 2025. Contractor on record: David L Davis.
Install 400amp service/wire building as per submitted plans to include: outlets-switches-em/exit light fixtures--hard wired smoke alarms-utility circuits-fire alarm system . ALL WORK IS TO BE DONE ACCORDING TO APPROVED DRAWINGS-2017 NEC,2016 NFPA-72,2018 PHILA FIRE CODE. AMENDMENT: Install service according to amended drawings (PARALLEL 4/0 SE CABLE)-2017 NEC.
Philadelphia permit records name David L Davis, Air Masters HVAC Inc and Michael J Mccullough jr as the contractors on this project, among 4 contractors in all.
Phone numbers and the property owner are included with Pro, where the city publishes them.
5 permits issued Jan 9 – Apr 3, newest first.
Commercial and multifamily, biggest first.
| Issued | Permit | Contractor | Value |
|---|
#EP-2024-012015 Electrical Permit · New Construction Install 400amp service/wire building as per submitted plans to include: outlets-switches-em/exit light fixtures--hard wired smoke alarms-utility circuits-fire alarm system . ALL WORK IS TO BE DONE ACCORDING TO APPROVED DRAWINGS-2017 NEC,2016 NFPA-72,2018 PHILA FIRE CODE. AMENDMENT: Install service… Status: Completed | David L Davis | — | |
#MP-2025-001428 Mechanical / Fuel Gas Permit · New Construction FOR INSTALLATION OF HVAC APPLIANCES PER APPROVED PLANS AND MANUFACTURER'S SPECIFICATIONS. Status: Completed | Air Masters HVAC Inc | — | |
#FP-2025-000478 Fire Suppression Permit · New Construction INSTALL NEW FIRE SUPPRESSION SYSTEM COMPLYING WITH NFPA 13R THROUGHOUT THE BUILDING TO INCLUDE 2" MAIN FIRE SERVICE LINE WITH A 2" WILKINS 950XLT2 BACKFLOW PREVENTION ASSEMBLY AS PER APPROVED PLANS. ALL WORK SHALL BE PERFORMED BY A FIRE SUPPRESSION CONTRACTOR LICENSED BY THE CITY OF PHILADELPHIA. Status: Completed | Michael J Mccullough jr | — | |
#PP-2024-016707 Plumbing Permit · New Construction or Additions NEW CONSTRUCTION OF QUADPLEX. EXTERIOR INSTALLATION OF 1-1/2 WATER DISTRIBUTION PIPE, CURB TRAP, FAI, AND MAIN DRAIN. INTERIOR DRAINAGE,WASTE,VENT, AND WATER SUPPLY FOR 30 FIXTURES. ALL WORK PERFORMED IN COMPLIANCE WITH 2018 PPC AND APPROVED PLANS. Status: Completed | Thomas Uhl | — | |
#EP-2024-012014 Electrical Permit · New Construction temp 100amp service for job site power Status: Completed | David L Davis | — |