Get ProEvery project in every city · from $79/mo
Get Procommercial project · Philadelphia, PA
Commercial Electrical, Hvac/Mechanical, Plumbing work permitted November 3, 2025, with 3 permits through April 30, 2026. Contractor on record: Baldwin Electrical Construction LLc.
Get new commercial permits near 19124 or Philadelphia, free weekly email
Install a new 200-amp electrical service to the church, including meter socket, main circuit breaker panel, service conductors, and proper grounding and bonding. Provide complete electrical distribution throughout the building, including installation of wiring, lighting fixtures, switches, exit signs, emergency lighting, and receptacle outlets. Furnish and install a fire alarm system, including control equipment, initiating devices, notification appliances, wiring, All work shall be performed in accordance with the 2017 NEC, 2016 NFPA 72 and per approved plans.
Philadelphia permit records name Baldwin Electrical Construction LLc, Nazar Plumbing LLC and Eugene Naydovich as the contractors on this project.
The property owner is included with Pro.
3 permits issued Nov 3 – Apr 30, newest first.
Commercial and multifamily, biggest first.
| Issued | Permit | Contractor | Value |
|---|
#EP-2026-002265 Electrical Permit · Addition and/or Alteration Install a new 200-amp electrical service to the church, including meter socket, main circuit breaker panel, service conductors, and proper grounding and bonding. Provide complete electrical distribution throughout the building, including installation of wiring, lighting fixtures, switches, exit… Status: Completed | Baldwin Electrical Construction LLc | — | |
#PP-2025-013354 Plumbing Permit · Alterations Installation of 2 toilets,2 lavatories,3 floor drains,1 hub drain,1 hot water heater Status: Completed | Nazar Plumbing LLC | — | |
#MP-2025-005202 Mechanical / Fuel Gas Permit · Addition and/or Alterations FOR INSTALLATION OF HVAC SYSTEM AS PER APPROVED PLANS. Status: Completed | Eugene Naydovich | — |
In Philadelphia, biggest first.