Get Procommercial project · Philadelphia, PA
Commercial Electrical, Fire Protection, Hvac/Mechanical, Plumbing work permitted March 18, 2025, with 5 permits through April 16, 2025. Contractor on record: LGB Mechanical Inc.
Get new commercial permits near 19124 or Philadelphia, free weekly email
INTERIOR ALTERATION TO RETAIL SPACE. DIRECT REPLACMENT OF FIXTURES LIKE FOR LIKE NO PIPING BEING REPLACED OR INSTALLED. FIXTURE REPLACEMENT WITHOUT PIPING INSTALLED PER 2018 PPC
Philadelphia permit records name LGB Mechanical Inc, Goldsmith Associates Inc and Paramount Electrical as the contractors on this project, among 5 contractors in all.
The property owner is included with Pro.
5 permits issued Mar 18 – Apr 16, newest first.
| Issued | Permit |
|---|
Commercial and multifamily, biggest first.
| Contractor |
|---|
| Value |
|---|
#PP-2025-003418 Plumbing Permit · Alterations INTERIOR ALTERATION TO RETAIL SPACE. DIRECT REPLACMENT OF FIXTURES LIKE FOR LIKE NO PIPING BEING REPLACED OR INSTALLED. FIXTURE REPLACEMENT WITHOUT PIPING INSTALLED PER 2018 PPC Status: Completed | LGB Mechanical Inc | — | |
#EP-2025-002601 Electrical Permit · Addition and/or Alteration Provide modifications to existing fire alarm and security system as per 2016 NFPA 72 and 2017 NEC. Status: Completed | Goldsmith Associates Inc | — | |
#EP-2025-002662 Electrical Permit · Addition and/or Alteration INSTALL LIGHTING, SWITCHES, EMERGENCY EXIT SIGN AND LIGHTING. INSTALL POWER BOX AND RECEPTACLE OUTLETS FOR 2017 NEC AND PER PLANS. Status: Completed | Paramount Electrical | — | |
#FP-2025-000651 Fire Suppression Permit · Addition and/or Alterations EZ PERMIT SPRINKLER RELOCATION (NFPA 13)- For the relocation of sprinkler heads as per attached standards. Deviations from these standards require submission of construction and site plans. Relocate 20 existing sprinkler heads due to new walls/ceiling. Status: Completed | Charles G. Hunter III | — | |
#MP-2025-001573 Mechanical / Fuel Gas Permit · Addition and/or Alterations FOR THE INSTALLATION OF REGISTERS, DIFFUSERS, AND APPLIANCES TO BE INSTALLED IN ACCORDANCE WITH THE MANUFACTURER’S SPECIFICATIONS. FOR USE AS PREVIOUSLY APPROVED. ALL WORK TO BE DONE PER APPROVED PLANS. IF FIELD CONDITIONS VARY CONTACT DESIGN ENGINEER PRIOR TO THE START OF ANY WORK. SEPARATE… Status: Completed | Mccloskey Mechanical Cont Inc | — |