Commercial Electrical, Fire Protection, Hvac/Mechanical, Plumbing work permitted November 14, 2024, with 4 permits through January 15, 2025. Contractor on record: Lor-Mar Mechanical Services LLC.
FOR THE INSTALLATION OF REGISTERS, DIFFUSERS, AND APPLIANCES WITH ASSOCIATED DUCTWORK. APPLIANCES TO BE INSTALLED IN ACCORDANCE WITH MANUFACTURER'S SPECIFICATIONS. ALL WORK TO BE DONE PER APPROVED PLANS. IF FIELD CONDITIONS VARY CONTACT DESIGN ENGINEER PRIOR TO THE START OF ANY WORK. SEPARATE PERMITS REQUIRED FOR ALL OTHER WORK.
Philadelphia permit records name Lor-Mar Mechanical Services LLC, Independence Fire Sprinkler Company and Hatzel & Buehler Inc as the contractors on this project.
Phone numbers and the property owner are included with Pro, where the city publishes them.
4 permits issued Nov 14 – Jan 15, newest first.
Commercial and multifamily, biggest first.
| Issued | Permit | Contractor | Value |
|---|
#MP-2024-005140 Mechanical / Fuel Gas Permit · Addition and/or Alterations FOR THE INSTALLATION OF REGISTERS, DIFFUSERS, AND APPLIANCES WITH ASSOCIATED DUCTWORK. APPLIANCES TO BE INSTALLED IN ACCORDANCE WITH MANUFACTURER'S SPECIFICATIONS. ALL WORK TO BE DONE PER APPROVED PLANS. IF FIELD CONDITIONS VARY CONTACT DESIGN ENGINEER PRIOR TO THE START OF ANY WORK. SEPARATE… Status: Completed | Lor-Mar Mechanical Services LLC | — | |
#PP-2024-015440 Plumbing Permit · Alterations Furnish and install [1] Floor Drain, [1] Floor Sink, [1] Hub Drain, [2] Lab Sinks, [1] Electric Water Heater. Provide labor and material to extend from existing Sanitary, Vent, Domestic Water, Lab Waste and Lab Vent as shown ALL WORK PERFORMED IN COMPLIANCE WITH 2018 PPC AND APPROVED PLANS Status: Completed | Lor-Mar Mechanical Services LLC | — | |
#FP-2024-002375 Fire Suppression Permit · Addition and/or Alterations EZ PERMIT DUCTWORK & WARM-AIR APPLIANCES- For the installation of New Ductwork, Registers/Grilles/Diffusers, and Warm-Air Appliances as per attached standards. Deviations from these standards require submission of construction and site plans. Relocate 6 Sprinkler Heads Status: Completed | Independence Fire Sprinkler Company | — | |
#EP-2024-010696 Electrical Permit · Addition and/or Alteration Provide new circuits and lighting to shared equipment room of existing lab space as per 2017 NEC. Install fire alarm system as per 2016 NFPA 72. Status: Completed | Hatzel & Buehler Inc | — |