Commercial Electrical, Fire Protection, Hvac/Mechanical, Plumbing work permitted November 1, 2024, with 4 permits through November 8, 2024. Contractor on record: Herman Goldner Co Inc.
ELECTRICAL: (5) Connect to existing panels. Branch: (56) Duplex Receptacles; (16) Junction box & connection 20/1. Lighting: Controls: (5) Dimmer switch. Fixtures: (4) Type L1A; (66) Type L2A; (5) W1A. T/D pathways: (16) Data junction box for connection by others; (5) Box & stub to ceiling (All cabling and equipment is by others). As per 2017 NEC.
Philadelphia permit records name Herman Goldner Co Inc, Shelly Electric Co Inc and Oliver Sprinkler Co., Inc. as the contractors on this project.
Phone numbers and the property owner are included with Pro, where the city publishes them.
4 permits issued Nov 1 – Nov 8, newest first.
Commercial and multifamily, biggest first.
| Issued | Permit | Contractor | Value |
|---|
#EP-2024-010628 Electrical Permit · Addition and/or Alteration ELECTRICAL: (5) Connect to existing panels. Branch: (56) Duplex Receptacles; (16) Junction box & connection 20/1. Lighting: Controls: (5) Dimmer switch. Fixtures: (4) Type L1A; (66) Type L2A; (5) W1A. T/D pathways: (16) Data junction box for connection by others; (5) Box & stub to ceiling (All… Status: Completed | Shelly Electric Co Inc | — | |
#FP-2024-002335 Fire Suppression Permit · Addition and/or Alterations EZ PERMIT SPRINKLER RELOCATION (NFPA 13)- For the Relocation of Sprinkler Heads as per attached standards. Deviations from these standards require submission of construction and site plans. Relocate (5) sprinkler heads to accommodate interior alterations to 4th floor operating rooms Status: Completed | Oliver Sprinkler Co., Inc. | — | |
#MP-2024-005011 Mechanical / Fuel Gas Permit · Addition and/or Alterations FOR THE INSTALLATION OF REGISTERS / DIFFUSERS TO BE INSTALLED IN ACCORDANCE WITH THE MANUFACTURER’S SPECIFICATIONS. FOR USE AS PREVIOUSLY APPROVED. ALL WORK TO BE DONE PER APPROVED PLANS. IF FIELD CONDITIONS VARY CONTACT DESIGN ENGINEER PRIOR TO THE START OF ANY WORK. SEPARATE PERMITS TO BE… Status: Completed | Herman Goldner Co Inc | — | |
#PP-2024-015177 Plumbing Permit · Alterations FIXTURE REPLACEMENT WITHOUT PIPING Replace 5 Scrub sinks Status: Completed | Herman Goldner Co Inc | — |