Get ProEvery project in every city · from $79/mo
Get Procommercial project · Philadelphia, PA
Commercial General Building, Demolition, Hvac/Mechanical work permitted November 24, 2025, with 8 permits through October 20, 2026. Contractor on record: Torino Inc.
Get new commercial permits near 19106 or Philadelphia, free weekly email
FOR AN ALTERATION TO AN EXISTING MECHANICAL SYSTEM TO ACCOMMODATE THE 12TH FLOOR OF AN EXISTING STRUCTURE. APPLIANCES TO BE INSTALLED IN ACCORDANCE WITH THE MANUFACTURER’S SPECIFICATIONS. ALL WORK TO BE DONE PER APPROVED PLANS. IF FIELD CONDITIONS VARY CONTACT DESIGN ENGINEER PRIOR TO THE START OF ANY WORK. **IMC 2021**
Philadelphia permit records name Torino Inc and Total Construction Inc as the contractors on this project.
The property owner is included with Pro.
The contractor on 2 permits issued in the last 30 days is included with Pro.
See the contractor8 permits issued Nov 24 – Oct 20, newest first.
Commercial and multifamily, biggest first.
| Issued | Permit | Contractor | Value |
|---|---|---|---|
#MP-2026-005944 Mechanical / Fuel Gas Permit · Addition and/or Alterations FOR AN ALTERATION TO AN EXISTING MECHANICAL SYSTEM TO ACCOMMODATE THE 12TH FLOOR OF AN EXISTING STRUCTURE. APPLIANCES TO BE INSTALLED IN ACCORDANCE WITH THE MANUFACTURER’S SPECIFICATIONS. ALL WORK TO BE DONE PER APPROVED PLANS. IF FIELD CONDITIONS VARY CONTACT DESIGN ENGINEER PRIOR TO THE START OF… Status: Issued | Contractor with Pro | — | |
#CP-2026-004742 Commercial Building Permit · Addition and/or Alteration FOR A LEVEL II INTERIOR ALTERATIONS (NO CHANGE IN OCCUPANCY ) TO THE LEVEL 4 & 5 OF AN EXISTING STRUCTURE. ALL WORK TO BE DONE PER APPROVED PLANS.** IF FIELD CONDITIONS VARY CONTACT DESIGN ENGINEER PRIOR TO THE START OF ANY WORK**IEBC 2021**EXISTING BUILDING FULLY SPRINKLERED** SEPARATE PERMITS… Status: Issued | Contractor with Pro | — | |
#CP-2026-004664 Commercial Building Permit · Addition and/or Alteration FOR A LEVEL II INTERIOR ALTERATIONS (NO CHANGE IN OCCUPANCY ) TO A PORTION OF THE 2ND AND 4TH FLOOR LEVEL OF AN EXISTING STRUCTURE. ALL WORK TO BE DONE PER APPROVED PLANS.** IF FIELD CONDITIONS VARY CONTACT DESIGN ENGINEER PRIOR TO THE START OF ANY WORK**IEBC 2021**EXISTING BUILDING FULLY… Status: Issued | Total Construction Inc | — | |
#CP-2026-003195 Commercial Building Permit · Addition and/or Alteration LEVEL II INTERIOR ALTERATIONS (NO CHANGE OF OCCUPANCY) FOR RENOVATIONS TO EXISTING 12TH FLOOR OFFICE SPACE (SUITE 1200) IN AN EXISTING HIGH-RISE BUILDING AS PER APPROVED PLANS. EXISTING BUILDING FULLY SPRINKLERED. *2021 IEBC REVIEW* **SEPARATE PERMITS REQUIRED FOR ANY MEP OR FIRE SUPPRESSION WORK** Status: Issued | Total Construction Inc | — | |
#CP-2026-001821 Commercial Building Permit · Addition and/or Alteration FOR LEVEL II ALTERATIONS WITH NO CHANGE IN OCCUPANY. SEPARATE PERMITS REQUIRED FOR MECHANICAL, ELECTRICAL, PLUMBING AND FIRE SUPPRESSION WORK. Status: Amendment Review | Torino Inc | — | |
#CP-2026-001704 Commercial Building Permit · Addition and/or Alteration FOR LEVEL II ALTERATIONS TO AN EXISTING 6TH FLOOR TENANT SPACE (610). ALTERATIONS TO INCLUDE PARTIAL DEMOLITION AND THE ERECTION OF PARTITION WALLS, PROVIDE FINISHES/FURNISHINGS AND ACCESSIBILITY IMPROVMENTS THROUGHOUT. FOR USE AS A PREVIOUSLY APPROVED. ALL WORK TO BE DONE PER APPROVED PLANS. IF… Status: Issued | Torino Inc | — | |
#CP-2025-005515 Commercial Building Permit · Addition and/or Alteration FOR A LEVEL II ALTERATIONS TO EXISTING TENANT SPACES ON THE 2RD & 12TH FLOOR LEVEL OF AN EXISTING STRUCTURE. BUILDING IS FULLY SPRINKLERED. **ALL WORK TO BE DONE PER APPROVED PLANS.** IF FIELD CONDITIONS VARY CONTACT DESIGN PROFESSIONAL PRIOR TO THE START OF ANY WORK. **SEPARATE PERMITS TO BE… Status: Completed | Torino Inc | — | |
#GM-2025-010871 General Permit Minor · EZ Interior Non-Load-Bearing Wall Demo. EZ INTERIOR NON-LOAD-BEARING WALL DEMOLITION - For the interior demolition on NON-Load-Bearing partition walls and ceilings as per attached standard. Deviations from these standards require submission of construction and site plans. Structural alteration or repair is expressly PROHIBITED under… Status: Completed | Not published | — |
In Philadelphia, biggest first.