Get ProEvery project in every city · from $79/mo
Get Procommercial project · Philadelphia, PA
Commercial Electrical, Fire Protection, Hvac/Mechanical, Plumbing work permitted October 24, 2025, with 4 permits through November 7, 2025. Contractor on record: PMC Mechanical Enterprise, LLC.
EZ PERMIT SPRINKLER RELOCATION (NFPA 13)- For the relocation of sprinkler heads as per attached standards. Deviations from these standards require submission of construction and site plans. Relocate (2) existing sprinkler heads
Philadelphia permit records name PMC Mechanical Enterprise, LLC, Oliver Sprinkler Co., Inc. and Liberty Integrated Solutions, Inc. as the contractors on this project.
Phone numbers and the property owner are included with Pro, where the city publishes them.
4 permits issued Oct 24 – Nov 7, newest first.
Commercial and multifamily, biggest first.
| Issued | Permit | Contractor | Value |
|---|
#FP-2025-002252 Fire Suppression Permit · Addition and/or Alterations EZ PERMIT SPRINKLER RELOCATION (NFPA 13)- For the relocation of sprinkler heads as per attached standards. Deviations from these standards require submission of construction and site plans. Relocate (2) existing sprinkler heads Status: Completed | Oliver Sprinkler Co., Inc. | — | |
#EP-2025-009978 Electrical Permit · Addition and/or Alteration Demo receptacles. Install new receptacles utilizing existing circuits and panels as per attached sealed electrical drawings. Install tele/data raceways AS PER 2017 NEC. Install 2 new fire alarm devices as per 2016 NFPA 72. Status: Completed | Liberty Integrated Solutions, Inc. | — | |
#PP-2025-013322 Plumbing Permit · Alterations INSTALLATION OF 6 NEW CUP SINKS AND ALL ASSOCIATED PIPING IN ACCORDANCE WITH 2018 PPC AND EZ STANDARD. Status: Completed | PMC Mechanical Enterprise, LLC | — | |
#MP-2025-005218 Mechanical / Fuel Gas Permit · Addition and/or Alterations FOR THE INSTALLATION OF (5) SNORKELS, (3) GAS CABINETS, (3) FUME HOODS S WITH ASSOCIATED DUCTWORK. APPLIANCES TO BE INSTALLED IN ACCORDANCE WITH MANUFACTURER'S SPECIFICATIONS. ALL WORK TO BE DONE PER APPROVED PLANS. IF FIELD CONDITIONS VARY CONTACT DESIGN ENGINEER PRIOR TO THE START OF ANY WORK.… Status: Completed | PMC Mechanical Enterprise, LLC | — |
In Philadelphia, biggest first.