Commercial General Building, Electrical work permitted March 11, 2025, with 7 permits through October 7, 2026. Contractor on record: Generation 3 Electric Inc.
FOR THE LEVEL II ALTERATIONS TO COMBINE UNITS 111 & 112 INTO A SINGLE UNIT. FOR USE AS A SINGLE-FAMILY HOUSEHOLD LIVING. AS PER APPROVED PLANS.
Philadelphia permit records name Generation 3 Electric Inc, David Mcarthur and Marlon Williams as the contractors on this project, among 5 contractors in all.
Phone numbers and the property owner are included with Pro, where the city publishes them.
The contractor on 1 permit issued in the last 30 days is included with Pro.
See the contractor7 permits issued Mar 11 – Oct 7, newest first.
Commercial and multifamily, biggest first.
| Issued | Permit | Contractor | Value |
|---|---|---|---|
#CP-2026-005484 Commercial Building Permit · Addition and/or Alteration FOR THE LEVEL II ALTERATIONS TO COMBINE UNITS 111 & 112 INTO A SINGLE UNIT. FOR USE AS A SINGLE-FAMILY HOUSEHOLD LIVING. AS PER APPROVED PLANS. Status: Issued | Contractor with Pro | — | |
#ZP-2026-009265 Zoning Permit · Change of Use Residential - Household Living - Multi-Family Status: Issued | David Mcarthur | — | |
#EP-2025-011421 Electrical Permit · Addition and/or Alteration Install proper wiring and devices in kitchen, new circuits, tamper resistant receptacles, panel directory adjusted properly, bathroom lighting circuit corrected, new devices installed throughout, AFCI breakers installed at panel & complete the general lighting areas with customer provided… Status: Completed | Marlon Williams | — | |
#CP-2025-004272 Commercial Building Permit · Addition and/or Alteration INTERIOR ALTERATION TO APT 108 OF AN EXISTING STRUCTURE. ALL WORK TO BE DONE PER APPROVED PLANS. IF FIELD CONDITIONS VARY CONTACT DESIGN ENGINEER PRIOR TO THE START OF ANY WORK. SEPARATE PERMITS TO BE OBTAINED FOR ALL OTHER WORK. **SEPARATE PERMITS REQUIRED FOR ELECTRICAL, MECHANICAL, PLUMBING &… Status: Completed | Mr Contractor inc | — | |
#EP-2025-007033 Electrical Permit · Addition and/or Alteration Replace 7 existing 100 amp 3phase electrical panels with new electrical panels and circuit breakers o basement: 2 panels (bike room) o first floor: 1 panel (server room) o second floor: 1 panel (electrical room) o third floor: 1 panel (electrical room) o forth floor: 1 panel (electrical room) o… Status: Completed | Dmitriy Bershadskiy | — | |
#EP-2025-006802 Electrical Permit · Addition and/or Alteration Disconnect damaged bathroom circuit x1 Rewire all affected areas x1 GFCI x1 3 gang box x1 Replace exhaust fan x1 Crawlspace circuit x1 Living room outlet rewire x1 Rewire portion of kitchen x1 Hallway smoke/ CO replacement x1 FISH ONLY PER 2017 NEC Status: Completed | Generation 3 Electric Inc | — | |
#EP-2025-002051 Electrical Permit · Addition and/or Alteration Electrical Repairs Light Fixture Installations Panel Tune Up and Labeling 18 Device Replacements 1- 20 amp line **********Fish Only******** No exterior work permitted as part of this permit. Status: Completed | Generation 3 Electric Inc | — |