Get ProEvery project in every city · from $79/mo
Get Procommercial project · Philadelphia, PA
Commercial Electrical, Fire Protection, Hvac/Mechanical work permitted April 1, 2026, with 4 permits through April 20, 2026. Contractor on record: Dale Depriest.
Replace fluorescent lights with LED hardwired shielded lights Install 8" lights and switch Replace exit signs/lights Storefront sign hookup and disconnect install Install new receptacle
Philadelphia permit records name Dale Depriest, Latech Electrical Contractors LLC and David Nguyen as the contractors on this project.
Phone numbers and the property owner are included with Pro, where the city publishes them.
4 permits issued Apr 1 – Apr 20, newest first.
| Issued | Permit | Contractor | Value |
|---|
Commercial and multifamily, biggest first.
#EP-2026-003134 Electrical Permit · Addition and/or Alteration Replace fluorescent lights with LED hardwired shielded lights Install 8" lights and switch Replace exit signs/lights Storefront sign hookup and disconnect install Install new receptacle Status: Completed | Latech Electrical Contractors LLC | — |
#EP-2026-003132 Electrical Permit · Addition and/or Alteration Install two (2) dedicated branch circuits for: Kitchen exhaust hood fan Make-up air unit Install and/or extend branch circuit(s) for kitchen hood lighting, including all required switching and controls Provide all wiring, conduit, fittings, and terminations required to connect: Exhaust fan Make-up… Status: Completed | David Nguyen | — |
#FP-2026-000631 Fire Suppression Permit · Addition and/or Alterations EZ KITCHEN FIRE SUPPRESSION- For the installation of New Wet Chemical Kitchen Fire Suppression System as per attached standard. Deviations from these standards require submission of construction and site plans. Install kitchen fire supression system Status: Completed | Dale Depriest | — |
#MP-2025-006179 Mechanical / Fuel Gas Permit · Addition and/or Alterations FOR THE INSTALLATION OF A TYPE 1 COMMERCIAL KITCHEN HOOD (10'-0") AND ASSOCIATED DUCTWORK, FANS AS PER APPROVED PLANS. SEPARATE PERMITS REQUIRED FOR ELECTRICAL AND FIRE SUPPRESSION WORK. **IMC 2018** Status: Completed | Dale Depriest | — |