Get ProEvery project in every city · from $79/mo
Get Procommercial project · Philadelphia, PA
Commercial Electrical, Fire Protection, Hvac/Mechanical, Plumbing work permitted October 16, 2025, with 5 permits through December 2, 2025. Contractor on record: Fred Dinardo JR.
Get new commercial permits near 19148 or Philadelphia, free weekly email
INSTALLING NAPCO COMMUNICATOR TO MONITOR EXISTING FIRELITE PANEL AS PER 2016 NFPA 72. EXISTING FIRELITE PANEL WIRED TO EXISTING EDWARDS RELAY MODULES. EXISTING RELAY MODULES ARE WIRED TO MAIN FIRE ALARM PANEL.
Philadelphia permit records name Fred Dinardo JR, B.H. HOLDINGS CORP ( Emergency Response Associates) and A & S Sprinkler Co Inc as the contractors on this project, among 4 contractors in all.
The property owner is included with Pro.
5 permits issued Oct 16 – Dec 2, newest first.
| Issued |
|---|
Commercial and multifamily, biggest first.
| Permit |
|---|
| Contractor |
|---|
| Value |
|---|
#EP-2025-010439 Electrical Permit · Addition and/or Alteration INSTALLING NAPCO COMMUNICATOR TO MONITOR EXISTING FIRELITE PANEL AS PER 2016 NFPA 72. EXISTING FIRELITE PANEL WIRED TO EXISTING EDWARDS RELAY MODULES. EXISTING RELAY MODULES ARE WIRED TO MAIN FIRE ALARM PANEL. Status: Completed | B.H. HOLDINGS CORP ( Emergency Response Associates) | — | |
#FP-2025-002138 Fire Suppression Permit · Addition and/or Alterations EZ PERMIT SPRINKLER RELOCATION (NFPA 13)- For the relocation of sprinkler heads as per attached standards. Deviations from these standards require submission of construction and site plans. RELOCATE (31) SPRINKLER HEADS AS PER NFPA 13 AND LOCAL CODE Status: Completed | A & S Sprinkler Co Inc | — | |
#MP-2025-005299 Mechanical / Fuel Gas Permit · Addition and/or Alterations Mechanical / Fuel Gas Permit for combo CP-2025-004362 For the installation of HVAC RTUs, GRDs, exhaust fans, and associated ductwork throughout as per approved plans and in accordance with 2018 IMC. Separate permits to be obtained for all other work. If site conditions vary, contact design… Status: Completed | Fred Dinardo JR | — | |
#PP-2025-013548 Plumbing Permit · Alterations Plumbing Permit (Interior) for combo CP-2025-004362 Installation of drainage, waste, vent, and water supply for listed fixtures connecting to existing metallic piping. Venting to be designed and installed in accordance with section 919 Philadelphia single stack vent system. all work to be… Status: Completed | William Pasquarello | — | |
#EP-2025-010052 Electrical Permit · Addition and/or Alteration Electrical Permit for combo CP-2025-004362 Install all lighting and receptacles PER APPROVED DRAWINGS-2017 NEC. Status: Completed | Fred Dinardo JR | — |
In Philadelphia, biggest first.