Commercial Electrical, Fire Protection, Hvac/Mechanical, Plumbing work permitted July 24, 2025, with 5 permits through November 4, 2025. Contractor on record: Shelly Electric Co Inc.
Get new commercial permits near 19107 or Philadelphia, free weekly email
Upgrade fire alarm install speaker / Strobe qty. 8, install NAC panel qty. 1. ALL WORK IS TO BE DONE ACCORDING TO APPROVED DRAWINGS-2017 NEC,2016 NFPA-72.
Philadelphia permit records name Shelly Electric Co Inc, Lor-Mar Mechanical Services LLC and Tkelly Inc as the contractors on this project, among 4 contractors in all.
The property owner is included with Pro.
5 permits issued Jul 24 – Nov 4, newest first.
| Issued | Permit | Contractor |
|---|
Commercial and multifamily, biggest first.
| Value |
|---|
#EP-2025-010407 Electrical Permit · Addition and/or Alteration Upgrade fire alarm install speaker / Strobe qty. 8, install NAC panel qty. 1. ALL WORK IS TO BE DONE ACCORDING TO APPROVED DRAWINGS-2017 NEC,2016 NFPA-72. Status: Completed | Shelly Electric Co Inc | — | |
#MP-2025-004703 Mechanical / Fuel Gas Permit · Addition and/or Alterations EZ PERMIT SPRINKLER RELOCATION (NFPA 13)- For the relocation of sprinkler heads as per attached standards. Deviations from these standards require submission of construction and site plans. Relocate (19) diffusers in the first floor lobby and provide air balance report. Status: Completed | Lor-Mar Mechanical Services LLC | — | |
#PP-2025-009696 Plumbing Permit · Alterations INTEERIOR ALTERATIONS TO EXISTING COMMERCIAL SPACE. INSTALLATION OF DRAINAGE, WASTE, VENT, AND WATER SUPPLY FOR LISTED FIXTURES. VENTING TO BE DESIGNED AND INSTALLED IN ACCORDANCE WITH SECTION 919 PHILADELPHIA SINGLE STACK VENT SYSTEM. ALL WORK TO BE PERFORMED IN STRICT COMPLIANCE WITH 2018 PPC… Status: Completed | Tkelly Inc | — | |
#FP-2025-001588 Fire Suppression Permit · Addition and/or Alterations EZ PERMIT SPRINKLER RELOCATION (NFPA 13)- For the relocation of sprinkler heads as per attached standards. Deviations from these standards require submission of construction and site plans. Relocate (32) sprinkler heads as per NFPA 13 in the lobby Status: Completed | A & S Sprinkler Co Inc | — | |
#EP-2025-006826 Electrical Permit · Addition and/or Alteration Install new lighting and lighting controls. Install new receptacles as per 2017 NEC and Paradigm drawings dated 7/2/2025. Status: Completed | Shelly Electric Co Inc | — |
In Philadelphia, biggest first.