Commercial Electrical, Fire Protection, Hvac/Mechanical, Plumbing work permitted June 30, 2025, with 5 permits through October 14, 2025. Contractor on record: Williams Group Electrical.
Get new commercial permits near 19149 or Philadelphia, free weekly email
FOR THE INSTALLATION OF NEW GRDs AND ASSOCIATED DUCTWORK CONNECTED TO EXISTING HVAC RTUs AS PER APPROVED PLANS AND IN ACCORDANCE WITH 2018 IMC. SEPARATE PERMITS TO BE OBTAINED FOR ALL OTHER WORK. SEE CP-2025-002245 FOR ASSOCIATED BUILDING PERMIT.
Philadelphia permit records name Williams Group Electrical, Louis DiLuzio and GM Mechanical Services as the contractors on this project, among 4 contractors in all.
The property owner is included with Pro.
5 permits issued Jun 30 – Oct 14, newest first.
| Issued |
|---|
Commercial and multifamily, biggest first.
| Permit |
|---|
| Contractor |
|---|
| Value |
|---|
#MP-2025-003765 Mechanical / Fuel Gas Permit · Addition and/or Alterations FOR THE INSTALLATION OF NEW GRDs AND ASSOCIATED DUCTWORK CONNECTED TO EXISTING HVAC RTUs AS PER APPROVED PLANS AND IN ACCORDANCE WITH 2018 IMC. SEPARATE PERMITS TO BE OBTAINED FOR ALL OTHER WORK. SEE CP-2025-002245 FOR ASSOCIATED BUILDING PERMIT. Status: Completed | Louis DiLuzio | — | |
#EP-2025-006856 Electrical Permit · Addition and/or Alteration Furnish and install fire alarm per vendor's engineered drawings as per 2016 NFPA 72 - certification by vendor Status: Completed | Williams Group Electrical | — | |
#PP-2025-007987 Plumbing Permit · Alterations INTERIOR ALTERATIONS TO CLINIC. INSTALLATION OF DRAINAGE, WASTE, VENT, AND WATER SUPPLY FOR LISTED FIXTURES. VENTING TO BE DESIGNED AND INSTALLED IN ACCORDANCE WITH SECTION 919 PHILADELPHIA SINGLE STACK VENT SYSTEM. METALLIC PIPING SHALL BE UTILIZED. NO HUB IS NOT APPROVED TO BE INSTALLED BELOW… Status: Completed | GM Mechanical Services | — | |
#FP-2025-001478 Fire Suppression Permit · Addition and/or Alterations EZ PERMIT SPRINKLER RELOCATION (NFPA 13)- For the relocation of sprinkler heads as per attached standards. Deviations from these standards require submission of construction and site plans. Relocate 27 sprinkler heads to ensure the safety of the building per NFPA 13 Status: Completed | Oneida Fire Protection Inc | — | |
#EP-2025-005589 Electrical Permit · Addition and/or Alteration Install new panels fed from existing MDP - install lighting and branch circuits along with outlets as per 2017 NEC. Status: Completed | Williams Group Electrical | — |