Get ProEvery project in every city · from $79/mo
Get Procommercial project · Philadelphia, PA
Commercial General Building, Electrical, Sign work permitted December 2, 2024, with 9 permits through February 11, 2026. Contractor on record: Katzin Electrical Group LLC.
Get new commercial permits near 19103 or Philadelphia, free weekly email
FOR THE ERECTION OF ONE (1) STATICALLY ILLUMINATED WALL SIGN. SIZE AND LOCATION AS SHOWN IN THE APPLICATION / PLANS.
Philadelphia permit records name Katzin Electrical Group LLC, Warren Oree II and Integrity - Emmons LLC as the contractors on this project, among 7 contractors in all.
The property owner is included with Pro.
9 permits issued Dec 2 – Feb 11, newest first.
| Issued | Permit | Contractor | Value |
|---|
Commercial and multifamily, biggest first.
#GP-2025-009433 General Permit · Sign FOR THE ERECTION OF ONE (1) STATICALLY ILLUMINATED WALL SIGN. SIZE AND LOCATION AS SHOWN IN THE APPLICATION / PLANS. Status: Completed | Not published | — |
#ZP-2025-010971 Zoning Permit · Signs (Accessory / Non-Accessory) FOR THE ERECTION OF ONE NON-ILLUMINATED ACCESSORY CABINET SIGN. SIZE AND LOCATION AS SHOWN IN PLANS. Status: Completed | Warren Oree II | — |
#CP-2025-004961 Commercial Building Permit · Addition and/or Alteration FOR LEVEL II INTERIOR ALTERATIONS TO COMBINE DWELLING UNITS- 3501 AND 3502 WITHIN AN EXISTING HIGH RISE BUILDING OF R2 OCCUPANCY. ALTERATIONS TO INCLUDE THE ERECTION OF PARTITION WALLS AND PROVIDE FINISHES/ FURNISHINGS THROUGHOUT. ALL WORK TO BE DONE PER APPROVED PLANS. IF FIELD CONDITIONS VARY… Status: Issued | Integrity - Emmons LLC | — |
#ZP-2025-010096 Zoning Permit · Change of Use Residential - Household Living - Multi-Family Status: Issued | Higgins Consulting Services LLC | — |
#CP-2025-004280 Commercial Building Permit · Addition and/or Alteration FOR THE LEVEL II INTERIOR ALTERATIONS AND CREATION OF EXTERIOR DOOR FOR THE CHANGE OF OCCUPANCY TO SIT-DOWN RESTAURANT (A2 OCCUPANCY) PER APPROVED PLANS. ALTERATIONS TO INCLUDE THE ERECTION OF PARTITION WALLS, PROVIDE FINISHES/FURNISHINGS AND ACCESSIBILITY IMPROVMENTS THROUGHOUT. IF FIELD… Status: Completed | Vincent T Bolger | — |
#EP-2025-007964 Electrical Permit · Addition and/or Alteration Supply and install main electrical breaker in the main switch board 277/480 volt Run 200 amp line all way to the second floor up to 200 feet long with 4 number 4/0 wire copper and one run of # 4 ground wire Supply and install 1 200 amp 480 volt 42 circuit breaker panel 225/250 amp panel one 150… Status: Completed | Katzin Electrical Group LLC | — |
#ZP-2025-008511 Zoning Permit · Change of Use Eating and Drinking Establishments - Sit-Down Restaurant Status: Issued | Group G LLC | — |
#EP-2025-003742 Electrical Permit · Addition and/or Alteration Service Work-Electrical panel - Check and relabel existing circuits in panel. Bathroom - Install Lutron Maestro motion sensor with dimmer functionality in place of the existing single-pole switch, Add GFCI for toilet utilizing existing GFCI inside bathroom Closet -Add jamb switch for double door,… Status: Completed | Your Electric Now Inc | — |
#EP-2024-009374 Electrical Permit · Addition and/or Alteration INSTALL 60 AMP, 480 VOLT 3 PHASE DISCONNECT FOR POOL HEATER SYSTEM. INSTALL CONDUIT FROM DISCONNECT TO CIRCUIT BREAKER PANEL WITH PROPER GROUNDING AND BONDING ACCORDING TO THE 2017 NEC AND PER PLANS. Status: Completed | Katzin Electrical Group LLC | — |