Get ProEvery project in every city · from $79/mo
Get Procommercial project · Philadelphia, PA
Commercial General Building, Electrical work permitted March 7, 2025, with 5 permits through October 23, 2026. Contractor on record: David Horlacher.
Get new commercial permits near 19103 or Philadelphia, free weekly email
SHELTER PLATFORM PERMIT- Erection of sidewalk shelter platform 44 l.f. on W Rittenhouse Sq. with the deck at 300 P.S.I. each as per Engineered Plans. Streets Department permit SR-2026-036617
Philadelphia permit records name David Horlacher, Marlon F Travis and RCR Electrical Contractors Inc as the contractors on this project, among 4 contractors in all.
The property owner is included with Pro.
5 permits issued Mar 7 – Oct 23, newest first.
| Issued | Permit | Contractor | Value |
|---|---|---|---|
Commercial and multifamily, biggest first.
#GP-2026-008583 General Permit · Shelter/Platform SHELTER PLATFORM PERMIT- Erection of sidewalk shelter platform 44 l.f. on W Rittenhouse Sq. with the deck at 300 P.S.I. each as per Engineered Plans. Streets Department permit SR-2026-036617 Status: Issued |
| Not published |
| — |
#CP-2026-003396 Commercial Building Permit · Addition and/or Alteration FOR LEVEL II ALTERATIONS TO AN EXISTING STRUCTURE. ALTERATIONS TO INCLUDE PARTIAL DEMOLITION AND THE ERECTION OF PARTITION WALLS, PROVIDE FINISHES/FURNISHINGS AND ACCESSIBILITY IMPROVEMENTS THROUGHOUT. FOR USE AS PREVIOUSLY APPROVED. ALL WORK TO BE DONE PER APPROVED PLANS. *****************… Status: Issued | David Horlacher | — |
#CP-2025-003760 Commercial Building Permit · Addition and/or Alteration FOR LEVEL II INTERIOR ALTERATIONS TO AN EXISTING CONDOMINIUM UNIT (#1701) IN THE EXISTING GROUP R-2 MULTI-FAMILY HIGH-RISE BUILDING AS PER APPROVED PLANS AND IN ACCORDANCE WITH 2018 IEBC AND PHC APPROVAL. SEPARATE PERMITS TO BE OBTAINED FOR MECHANICAL, ELECTRICAL, PLUMBING, AND FIRE SUPPRESSION… Status: Completed | Marlon F Travis | — |
#EP-2025-003917 Electrical Permit · Addition and/or Alteration Installation of 15KV substation in the lower garage. Installation of temporary switch gear in the parking garage to support the building during the changeover. Installation of 19th floor switch gear and a new generator as per plans and specs. Status: Completed | RCR Electrical Contractors Inc | — |
#EP-2025-000418 Electrical Permit · Addition and/or Alteration REPLACE THE EXISTING 200 AMP CIRCUIT BREAKER PANEL WITH A NEW 200 AMP CIRCUIT BREAKER PANEL AND NEW CIRCUIT BREAKERS, WIRE POWER IN MECHANICAL ROOM FOR POWER TO ELECTRICAL SHADES, WIRE RECEPTACLE FOR CAMERA SYSTEM, WIRE LOW VOLTAGE LIGHTING AT WINDOWS AND POWER CONTROLLERS, WIRE SEPARATE LINE FOR… Status: Issued | Joseph Verna | — |
In Philadelphia, biggest first.