Commercial Electrical, Fire Protection, Hvac/Mechanical, Plumbing work permitted December 30, 2025, with 4 permits through January 26, 2026. Contractor on record: Lor-Mar Mechanical Services LLC.
Furnish and install 2 duplex outlets, 2 GFI's, 1 dedicated circuit and 3 floor cores, 14 downlights, 1 dimmer and 1 wall motion. Fire Alarm . ALL WORK IS TO BE DONE ACCORDING TO APPROVED DRAWINGS-2017 NEC,2016 NFPA-72.
Philadelphia permit records name Lor-Mar Mechanical Services LLC, Shoreline Electric Inc and A & S Sprinkler Co Inc as the contractors on this project.
Phone numbers and the property owner are included with Pro, where the city publishes them.
4 permits issued Dec 30 – Jan 26, newest first.
| Issued |
|---|
Commercial and multifamily, biggest first.
| Permit |
|---|
| Contractor |
|---|
| Value |
|---|
#EP-2026-000344 Electrical Permit · Addition and/or Alteration Furnish and install 2 duplex outlets, 2 GFI's, 1 dedicated circuit and 3 floor cores, 14 downlights, 1 dimmer and 1 wall motion. Fire Alarm . ALL WORK IS TO BE DONE ACCORDING TO APPROVED DRAWINGS-2017 NEC,2016 NFPA-72. Status: Completed | Shoreline Electric Inc | — | |
#MP-2026-000263 Mechanical / Fuel Gas Permit · Addition and/or Alterations EZ PERMIT DUCTWORK & WARM-AIR APPLIANCES - For the installation of New Ductwork, Registers/Grilles/Diffusers, and Warm-Air Appliances as per attached standards. Deviations from these standards require submission of construction and site plans. Relocate [1] VAV box, [1] thermostat, [7] diffusers,… Status: Completed | Lor-Mar Mechanical Services LLC | — | |
#PP-2025-016635 Plumbing Permit · Alterations Furnish and install [1] sink with 6 -gallon hot water heater - Connect to existing Sanitary, vent and domestic cold water lines. 2 FIXTURES. Status: Completed | Lor-Mar Mechanical Services LLC | — | |
#FP-2025-002556 Fire Suppression Permit · Addition and/or Alterations EZ PERMIT SPRINKLER RELOCATION (NFPA 13)- For the relocation of sprinkler heads as per attached standards. Deviations from these standards require submission of construction and site plans. RELOCATE (13) SPRINKLER HEADS ON THE 11TH FLOOR, PER NFPA 13 Status: Completed | A & S Sprinkler Co Inc | — |