Get Procommercial project · Philadelphia, PA
Commercial Electrical, Fire Protection, Hvac/Mechanical, Plumbing work permitted April 30, 2025, with 6 permits through December 30, 2025. Contractor on record: Prostar Plumbing LLC.
Get new commercial permits near 19121 or Philadelphia, free weekly email
INSTALL400A SERVICE, WIRING THROUGHOUT, INSTALL LIGHT FIXTURES, INSTALL OUTLETS, SWITCHES, SMOKE ALARMS, GROUNDING . INSTALL FIRE ALARM W/ LOW FREQUENCY SOUND IN ALL LIVING RMS AND BEDROOMS -2017 NEC,2016 NFPA-72.
Philadelphia permit records name Prostar Plumbing LLC, Euroquality LLC and Michael J Mccullough jr as the contractors on this project, among 5 contractors in all.
The property owner is included with Pro.
6 permits issued Apr 30 – Dec 30, newest first.
Commercial and multifamily, biggest first.
| Issued |
|---|
| Permit |
|---|
| Contractor |
|---|
| Value |
|---|
#EP-2025-009645 Electrical Permit · New Construction INSTALL400A SERVICE, WIRING THROUGHOUT, INSTALL LIGHT FIXTURES, INSTALL OUTLETS, SWITCHES, SMOKE ALARMS, GROUNDING . INSTALL FIRE ALARM W/ LOW FREQUENCY SOUND IN ALL LIVING RMS AND BEDROOMS -2017 NEC,2016 NFPA-72. Status: Completed | Euroquality LLC | — | |
#PP-2025-008461 Plumbing Permit · New Construction or Additions NEW CONSTRUCTION OF QUADPLEX. INTERIOR INSTALLATION OF DRAINAGE, WAST, VENT, AND WATER SUPPLY FOR LISTED FIXTURES. VENTING TO BE DESIGNED AND INSTALLED IN ACCORDANCE WITH SECTION 919 PHILADLEPHIA SINGLE STACK VENT SYSTEM. ALL WORK TO BE PERFORMED IN STRICT COMPLIANCE WITH 2018 PPC AND APPROVED… Status: Completed | Prostar Plumbing LLC | — | |
#PP-2025-013598 Plumbing Permit · New Construction or Additions INSTALL SANITARY & STORM CT, FAI, MD & 1.5" WDP Status: Completed | Prostar Plumbing LLC | — | |
#FP-2025-001791 Fire Suppression Permit · New Construction INSTALL NEW FIRE SUPPRESSION SYSTEM COMPLYING WITH NFPA 13 THROUGHOUT THE BUILDING TO INCLUDE 2" MAIN FIRE SERVICE LINE WITH 2 INCH WILKINS 950XLT2 BACKFLOW PREVENTER AND AUTOMATIC FIRE SUPPRESSION SYSTEM. ALL WORK TO BE DONE PER APPROVED PLANS. IF FIELD CONDITIONS VARY CONTACT DESIGN ENGINEER… Status: Completed | Michael J Mccullough jr | — | |
#MP-2025-003592 Mechanical / Fuel Gas Permit · Addition and/or Alterations FOR THE INSTALLATION OF REGISTERS, DIFFUSERS, AND APPLIANCES WITH ASSOCIATED DUCTWORK. APPLIANCES TO BE INSTALLED IN ACCORDANCE WITH THE MANUFACTURER’S SPECIFICATIONS. ALL WORK TO BE DONE PER APPROVED PLANS. IF FIELD CONDITIONS VARY CONTACT DESIGN ENGINEER PRIOR TO THE START OF ANY WORK. SEPARATE… Status: Completed | Air Masters HVAC Inc | — | |
#SP-2025-000320 Site / Utility Permit · Excavation Site / Utility Permit for CP-2025-000308 [AMENDMENT 12/5/2025 FOR CHANGES TO THE DESIGN PROFESSIONAL IN RESPONSIBLE CHARGE OF SPECIAL INSPECTIONS (DPRC-SI) AND SPECIAL INSPECTIONS AGENCY.] Status: Completed | Grosso Concrete LLC | — |