Commercial Electrical, Fire Protection, Hvac/Mechanical, Plumbing work permitted April 29, 2025, with 5 permits through August 19, 2025. Contractor on record: Shawn Malloy.
Relocate existing fire alarm devices on 1st floor and add new per plans to accommodate new apartments as per 2016 NFPA 72.
Philadelphia permit records name Shawn Malloy, Mulco Mechanical LLC and DWD Mechanical Contractor Inc as the contractors on this project, among 5 contractors in all.
Phone numbers and the property owner are included with Pro, where the city publishes them.
5 permits issued Apr 29 – Aug 19, newest first.
| Issued | Permit | Contractor |
|---|
Commercial and multifamily, biggest first.
| Value |
|---|
#EP-2025-005439 Electrical Permit · Addition and/or Alteration Relocate existing fire alarm devices on 1st floor and add new per plans to accommodate new apartments as per 2016 NFPA 72. Status: Completed | Shawn Malloy | — | |
#PP-2025-006091 Plumbing Permit · Alterations Sanitary, waste and vent piping; domestic hot and cold water piping; installation of plumbing fixtures and water heaters Status: Completed | Mulco Mechanical LLC | — | |
#MP-2025-002366 Mechanical / Fuel Gas Permit · Addition and/or Alterations FOR THE INSTALLATION OF A NEW HVAC SYSTEMS, ASSOCIATED DUCT WORK, AND REGISTERS/DIFFUSERS AS PER APPROVED PLANS. SEPARATE PERMIT REQUIRED FOR ELECTRICAL, PLUMBING, FIRE SUPPRESSION. Status: Completed | DWD Mechanical Contractor Inc | — | |
#EP-2025-005215 Electrical Permit · Addition and/or Alteration Wire 8 dwelling units on ground floor with new outlets, switches. lighting, and 120v smoke alarms . ALL WORK IS TO BE DONE ACCORDING TO APPROVED DRAWINGS-2017 NEC. -NOTED:GFCI BREAKER FOR WASHING MACHINE CKT Status: Completed | Stokes Electric LLC | — | |
#FP-2025-000844 Fire Suppression Permit · Addition and/or Alterations EZ PERMIT SPRINKLER RELOCATION (NFPA 13)- For the relocation of sprinkler heads as per attached standards. Deviations from these standards require submission of construction and site plans. Relocate 54 sprinklers to ensure the safety of the building, per NFPA 13 Status: Completed | Oneida Fire Protection Inc | — |
In Philadelphia, biggest first.