Get ProEvery project in every city · from $79/mo
Get Procommercial project · Philadelphia, PA
Commercial Electrical, Fire Protection, Hvac/Mechanical, Plumbing work permitted August 26, 2025, with 5 permits through May 5, 2026. Contractor on record: Richard Christopher.
Installation of fire alarm devices, ANSUL hood connection, and all work per approved plans.
Philadelphia permit records name Richard Christopher, East Coast Business Fire Inc and Nhan T Le as the contractors on this project.
Phone numbers and the property owner are included with Pro, where the city publishes them.
5 permits issued Aug 26 – May 5, newest first.
| Issued | Permit | Contractor | Value |
|---|
Commercial and multifamily, biggest first.
#EP-2026-001990 Electrical Permit · Addition and/or Alteration Installation of fire alarm devices, ANSUL hood connection, and all work per approved plans. Status: Completed | Richard Christopher | — | |
#FP-2025-002319 Fire Suppression Permit · Addition and/or Alterations EZ KITCHEN FIRE SUPPRESSION- For the installation of New Wet Chemical Kitchen Fire Suppression System as per attached standard. Deviations from these standards require submission of construction and site plans. Kitchen suppression system Status: Completed | East Coast Business Fire Inc | — | |
#MP-2025-005359 Mechanical / Fuel Gas Permit · Addition and/or Alterations FOR THE INSTALLATION OF A TYPE 1 COMMERCIAL KITCHEN HOOD (14'-0") AND ASSOCIATED DUCTWORK, FANS AS PER APPROVED PLANS. *********SEPARATE PERMITS REQUIRED FOR ANY ELECTRICAL AND FIRE SUPPRESSION WORK. **IMC 2018** Status: Completed | East Coast Business Fire Inc | — | |
#EP-2025-008342 Electrical Permit · Addition and/or Alteration INSTALL GFCI RECEPTACLE OUTLET IN BATHROOM AREA. REPLACE LIGHT FIXTURES IN DINING ARA AND RLOCATE WALL SWITCHES. INSTALL BRANCH CIRCUIT FOR STOVE, REPAIR SWITCH TO EXHAUST FAN AND INSTALL WALL PLATE. ALL WORK TO BE DONE ACCORDING TO THE 2017 NEC AND PER PLANS. Status: Completed | Richard Christopher | — | |
#PP-2025-009330 Plumbing Permit · Alterations Rough in plumbing for a commercial kitchen fixtures and 2 ADA restrooms. Hot and cold water to fixtures. Status: Completed | Nhan T Le | — |
In Philadelphia, biggest first.