Get Procommercial project · Philadelphia, PA
Commercial Electrical, Fire Protection, Hvac/Mechanical work permitted November 19, 2025, with 3 permits through December 15, 2025. Contractor on record: Albarell Electric Inc.
Provide selective demolition of (4) to allow for open cubicle area expansion. Provide new lighting fixtures and controls utilizing existing branch circuit wiring. Provide new receptacles utilizing existing branch circuit wiring. Provide new branch circuit wiring for additional cubicle furniture. Provide in-wall telecommunication sleeves for wiring done by others. Relocate (1) existing fire alarm notification appliance.-2017 NEC,2016 NFPA-72.
Philadelphia permit records name Albarell Electric Inc, Hunter Mechanical Inc and Wayman Fire as the contractors on this project.
Phone numbers and the property owner are included with Pro, where the city publishes them.
3 permits issued Nov 19 – Dec 15, newest first.
| Issued |
|---|
Commercial and multifamily, biggest first.
| Permit |
|---|
| Contractor |
|---|
| Value |
|---|
#EP-2025-011506 Electrical Permit · Addition and/or Alteration Provide selective demolition of (4) to allow for open cubicle area expansion. Provide new lighting fixtures and controls utilizing existing branch circuit wiring. Provide new receptacles utilizing existing branch circuit wiring. Provide new branch circuit wiring for additional cubicle furniture.… Status: Completed | Albarell Electric Inc | — | |
#MP-2025-006082 Mechanical / Fuel Gas Permit · Addition and/or Alterations EZ PERMIT DUCTWORK & WARM-AIR APPLIANCES - For the installation of New Ductwork, Registers/Grilles/Diffusers, and Warm-Air Appliances as per attached standards. Deviations from these standards require submission of construction and site plans. Relocate 5 existing diffusers within a single office… Status: Completed | Hunter Mechanical Inc | — | |
#FP-2025-002320 Fire Suppression Permit · Addition and/or Alterations EZ PERMIT SPRINKLER RELOCATION (NFPA 13)- For the relocation of sprinkler heads as per attached standards. Deviations from these standards require submission of construction and site plans. RELOCATE 7 SPRINKLER HEADS TO ACCOMODATE NEW ARCHITECTURAL LAYOUT Status: Completed | Wayman Fire | — |