Commercial Electrical, Fire Protection, Hvac/Mechanical, Plumbing work permitted March 28, 2025, with 4 permits through March 3, 2026. Contractor on record: It Landes Company.
EXTENSION OF VENT THROUGH ROOF AND DOMESTIC PIPING FROM THE EXISTING TENANT FIT OUT FOR FUTURES FOR FIT-OUT OF PROVIDED HALL. ALL WORK TO BE PERFORMED IN STRICT COMPLIANCE WITH 2018 PPC AND APPROVED PLANS. ALL WORK SHALL BE REFLECTED TO THE PROVIDED PLANS. EXTENSION ON WORK BEYOND THESE PLANS SHALL REQUIRE AN ADDITIONAL PLAN REVIEW.
Philadelphia permit records name It Landes Company, Oneida Fire Protection Inc and Tri-M Group LLC as the contractors on this project.
Phone numbers and the property owner are included with Pro, where the city publishes them.
4 permits issued Mar 28 – Mar 3, newest first.
Commercial and multifamily, biggest first.
| Issued | Permit | Contractor | Value |
|---|
#PP-2026-001211 Plumbing Permit · Alterations EXTENSION OF VENT THROUGH ROOF AND DOMESTIC PIPING FROM THE EXISTING TENANT FIT OUT FOR FUTURES FOR FIT-OUT OF PROVIDED HALL. ALL WORK TO BE PERFORMED IN STRICT COMPLIANCE WITH 2018 PPC AND APPROVED PLANS. ALL WORK SHALL BE REFLECTED TO THE PROVIDED PLANS. EXTENSION ON WORK BEYOND THESE PLANS… Status: Completed | It Landes Company | — | |
#FP-2025-000034 Fire Suppression Permit · Addition and/or Alterations FOR THE INSTALLATION OF 321 NEW PENDENT SPRINKLERS TO AN EXISTING FIRE SUPPRESSION SYSTEM COMPLYING WITH NFPA 13 THROUGHOUT THE BUILDING. AS PER APPROVED PLANS. ALL WORK SHALL BE PERFORMED BY A FIRE SUPPRESSION CONTRACTOR LICENSED BY THE CITY OF PHILADELPHIA. ALL WORK SHALL BE DONE IN ACCORDANCE… Status: Completed | Oneida Fire Protection Inc | — | |
#EP-2025-001749 Electrical Permit · Addition and/or Alteration INSTALL NEW SWITCHGEAR LINE TO ELECTRICAL ROOM AND CONNECT TO THE ASSOCIATE PANELBOARDS. INSTALL POWER TO HEAT PUMP, CONDENSATE PUMP, BOILERS, MINI SPLITS, HEAT TRACE, HYDRAULIC ELEVATOR AND ADA LIFT ACCORDING TO THE 2017 NEC AND PER PLANS. Status: Completed | Tri-M Group LLC | — | |
#MP-2025-001436 Mechanical / Fuel Gas Permit · Addition and/or Alterations FOR THE INSTALLATION OF HVAC APPLIANCES, EQUIPMENT, DUCTWORK AND REGISTERS/DIFFUSERS PER APPROVED PLANS AND MANUFACTURER'S SPECIFICATIONS. *2018 IMC REVIEW* **AMENDMENT 8/15/2025 FOR THE INSTALLATION OF AIR EXHAUST FAN.** Status: Completed | It Landes Company | — |
In Philadelphia, biggest first.