Get ProEvery project in every city · from $79/mo
Get Procommercial project · Philadelphia, PA
Commercial Electrical, Hvac/Mechanical, Plumbing work permitted November 17, 2024, with 4 permits through November 1, 2025. Contractor on record: Clarence Morris.
FOR THE INSTALLATION OF REGISTERS, DIFFUSERS, AND APPLIANCES WITH ASSOCIATED DUCTWORK. APPLIANCES TO BE INSTALLED IN ACCORDANCE WITH MANUFACTURER'S SPECIFICATIONS. ALL WORK TO BE DONE PER APPROVED PLANS. IF FIELD CONDITIONS VARY CONTACT DESIGN ENGINEER PRIOR TO THE START OF ANY WORK. SEPARATE PERMITS REQUIRED FOR ALL OTHER WORK.
Philadelphia permit records name Clarence Morris, Philadelphia Detect System Inc and Hvac Doctor LLC as the contractors on this project, among 4 contractors in all.
Phone numbers and the property owner are included with Pro, where the city publishes them.
4 permits issued Nov 17 – Nov 1, newest first.
| Issued | Permit |
|---|
Commercial and multifamily, biggest first.
| Contractor |
|---|
| Value |
|---|
#MP-2025-005098 Mechanical / Fuel Gas Permit · Addition and/or Alterations FOR THE INSTALLATION OF REGISTERS, DIFFUSERS, AND APPLIANCES WITH ASSOCIATED DUCTWORK. APPLIANCES TO BE INSTALLED IN ACCORDANCE WITH MANUFACTURER'S SPECIFICATIONS. ALL WORK TO BE DONE PER APPROVED PLANS. IF FIELD CONDITIONS VARY CONTACT DESIGN ENGINEER PRIOR TO THE START OF ANY WORK. SEPARATE… Status: Completed | Clarence Morris | — | |
#EP-2025-007277 Electrical Permit · Addition and/or Alteration Install fire alarm as per the attached plans as per 2016 NFPA 72. Status: Completed | Philadelphia Detect System Inc | — | |
#MP-2025-002412 Mechanical / Fuel Gas Permit · Addition and/or Alterations FOR INSTALLATION OF AN HVAC APPLIANCE AND RELATED EQUIPMENT PER APPROVED PLANS AND MANUFACTURER'S SPECIFICATIONS. Status: Completed | Hvac Doctor LLC | — | |
#PP-2024-012989 Plumbing Permit · Alterations INTERIOR INSTALLATION OF 10 LAVS, 4 WATER CLOSETS, 1 DRINKING FOUNTAIN, 5 CUSTOM HAND SINKS, 1 KITCHEN SINK, 1 WATER HEATER, 2 FLOOR DRAINS AND FUTURE PIPING FOR VACANT COMMERCIAL SPACE IN COMPLIANCE WITH 2018 PPC AND APPROVED PLANS Status: Completed | Gary Thompson | — |