Get ProEvery project in every city · from $79/mo
Get Procommercial project · Philadelphia, PANew: first permit Oct 12
Commercial Electrical, Hvac/Mechanical work permitted October 12, 2026, with 3 permits through October 28, 2026.
FOR THE INSTALLATION OF GAS PIPING. APPLIANCES TO BE INSTALLED IN ACCORDANCE WITH MANUFACTURER'S SPECIFICATIONS. ALL WORK TO BE DONE PER APPROVED PLANS. IF FIELD CONDITIONS VARY CONTACT DESIGN ENGINEER PRIOR TO THE START OF ANY WORK. SEPARATE PERMITS REQUIRED FOR ALL OTHER WORK. THIS APPLICATION WAS REVIEWED UNDER THE 2021 IMC.
This is a new project: its first permit was issued October 12, 2026. The contractor on it is included with Pro, with the phone number, and is named here 30 days after the first permit.
See the contractor3 permits issued Oct 12 – Oct 28, newest first.
| Issued | Permit | Contractor | Value |
|---|---|---|---|
Commercial and multifamily, biggest first.
#MP-2026-005883 Mechanical / Fuel Gas Permit · Addition and/or Alterations FOR THE INSTALLATION OF GAS PIPING. APPLIANCES TO BE INSTALLED IN ACCORDANCE WITH MANUFACTURER'S SPECIFICATIONS. ALL WORK TO BE DONE PER APPROVED PLANS. IF FIELD CONDITIONS VARY CONTACT DESIGN ENGINEER PRIOR TO THE START OF ANY WORK. SEPARATE PERMITS REQUIRED FOR ALL OTHER WORK. THIS APPLICATION… Status: Issued |
| Contractor with Pro |
| — |
#EP-2026-008758 Electrical Permit · Addition and/or Alteration Installation to include demo, new service and distribution, branch power, lighting fixtures/controls, and mechanical hook-ups per submitted plans and 2017 NEC. Status: Issued | Contractor with Pro | — |
#EP-2026-009796 Electrical Permit · Addition and/or Alteration Install low voltage cabling throughout Status: Issued | Contractor with Pro | — |