Get ProEvery project in every city · from $79/mo
Get Promultifamily project · New York City, NY
Multifamily General Building, Hvac/Mechanical, Plumbing work permitted March 2, 2026, with 5 permits through June 26, 2026, declaring $143,255 of work. Contractor on record: Slsco,LTD.
Get new commercial permits near 10314 or New York City, free weekly email
First phase preparatory interior demolition of non bearing walls. No work to VCT or Mastic.
New York City permit records name Slsco,LTD and Metrocity Group,Inc as the contractors on this project.
The property owner is included with Pro.
5 permits issued Mar 2 – Jun 26, newest first.
| Issued | Permit | Contractor | Value |
|---|---|---|---|
| applied Feb 5 | #S01100017-S1-MS Mechanical Systems · Initial Permit |
Commercial and multifamily, biggest first.
HUB consultation accepted. Remove and replace steam traps, valves, traps, vents, and EMR HVAC components. Insulate steam/condensate piping. Temp monitoring system installed in elevator lobby. Exhaust fans and electric convectors in bathrooms.
Status: Permit Issued
| Slsco,LTD |
| $10.9K |
| applied Jul 15 | #S01100017-S2-PL Plumbing · Initial Permit Remove and replace domestic water, storm and sanitary systems; Bathroom Fixtures. Remove Gas Risers, part of Gas Main, and Gas Meter. Decommission gas system. Status: Permit Issued | Metrocity Group,Inc | $10.5K |
| applied Oct 14 | #S01100017-I1-GC General Construction · Initial Permit HUB consultation accepted on 5/9/2024. Alteration within 72 units and common areas and exterior facade. Removal of non-load bearing walls. Replacement of fixtures, doors, partitions, lighting, electrical devices/switches, windows, & flooring. Status: Permit Issued | Slsco,LTD | $11.1K |
| applied Feb 23 | #S01100017-S3-GC General Construction · Renewal Permit Without Changes First phase preparatory interior demolition of non bearing walls. No work to VCT or Mastic. Status: Permit Issued | Slsco,LTD | $111K |
| applied Feb 25 | #S01100017-S4-PL Plumbing · Initial Permit Removal of fixtures and bath tubs. First phase preparatory interior demolition. No work to VCT or Mastic. Status: Permit Issued | Metrocity Group,Inc | $111K |
In New York City, biggest first.