Commercial Hvac/Mechanical work permitted April 3, 2025, declaring $152,350 of work. Contractor on record: The Metro Group, Inc.
Get a free email when a new permit is filed here
- $152K
- Project value
- 1
- Permit
- Apr 3
- First permit
- 5 days
- Application to issuemedian
What's being built
REPLACE WATER COOLED AIR CONDITIONER UNIT AS PER PLANS. NO CHANGE IN USE, OCCUPANCY OR EGRESS
Who is building at 6 St Johns Lane Manhattan?
New York City permit records name The Metro Group, Inc as the contractor on this project.
On file for this address
- A contractor phone number
- The property owner
One charge, nothing renews. Refunded in full if the record lacks what’s listed here.
Permits at 6 St Johns Lane Manhattan
1 permit, issued Apr 3.
| Issued | Permit | Contractor | Value |
|---|---|---|---|
| applied Mar 29 | #M01179769-I1-MS Mechanical Systems · Initial Permit REPLACE WATER COOLED AIR CONDITIONER UNIT AS PER PLANS. NO CHANGE IN USE, OCCUPANCY OR EGRESS Status: Signed-Off | The Metro Group, Inc | $152K |
Other projects in 10013
Commercial and multifamily, biggest first.
- 417 Canal Street ManhattanRemoval of sidewalk, curbs, asphalt pavement, utilities and site preparation. Excavation and installation of sewers and utilities and curbing, sidewalk, and asphalt pavement.commercialPlumbing· Gramercy Group, Inc$22.7MApr 14
- 200 Lafayette Street ManhattanConstruction modifications taking place on the 3-4th & 6-7th floors as indicated on the drawings.commercialBuilding, Fire protection, HVAC / Mechanical, Plumbing· JT Magen & Company Inc$12.9MApr 2
- 148 Lafayette Street ManhattanFiling herewith architectural plans to include interior renovation and general construction on floors 10 thru 13. There will be no change of use, occupancy or egress under this…commercialBuilding, HVAC / Mechanical, Plumbing· Structure Tone, LLC$8MAug 25
- 370 Canal Street ManhattanExisting guestrooms interior renovation including fixtures and related finishes as per plans (Guest Rooms). There will be no change in use, egress, or occupancy.commercialBuilding· Continental Contractors I$5.9MJan 27
- 417 Canal Street ManhattanFiling to install six (6) below grade reinforced cast-place and precast structures. Scope includes excavation and backfill, placing steel reinforcement, placing and curing…commercialBuilding· Gramercy Group, Inc$5.3MMar 19
- 56 North Moore Street ManhattanFacade Renovations as shown on plans filed herewith.commercialBuilding· Leeding Builders Group LL$4.6MMay 27
More projects by The Metro Group, Inc
In New York City, biggest first.
- 222 East 6 Street ManhattanREPLACE (2) COOLING TOWERS WITH VRF HVAC SYSTEM AND ASSOCIATED DUCTWORK AS PER PLANS. NO CHANGE IN USE, OCCUPANCY OR EGRESS.commercialHVAC / Mechanical, Plumbing· The Metro Group, Inc$2.1MAug 20
- 24 5 Avenue ManhattanGENERAL CONSTRUCTION FOR THE INSTALLATION OF NEW HEATING PLANT EQUIPMENT AND CHIMNEY LINER. NO CHANGE IN EGRESS OR OCCUPANCY.multifamilyBuilding, HVAC / Mechanical, Plumbing· Marlande Heating Corp$1.3MJul 24
- 1596 York Avenue ManhattanREPLACE BOILER AND GAS/OIL BURNERS.multifamilyBuilding, HVAC / Mechanical, Plumbing· The Metro Group, Inc$1MJun 5
- 1048 5 Avenue ManhattanAC UNITS TO BE REFURBISHED & REBUILT.HUMIDIFIERS TO BE REMOVED & REPLACED ON THE 5TH FL.GAS BOILER AND ASSOCIATED PIPING TO BE REMOVED. PIPING AND ELECTRIC BOILER TO BE…commercialBuilding, HVAC / Mechanical, Plumbing· The Metro Group, Inc$790KJul 13
- 43-34 Union Street QueensREPLACEMENT (2) NEW LOW PRESSURE BOILERS. REPLACEMENT (2) COMBINATION GAS/OIL BURNERS. STRAIGHT GAS ONLY AT THIS TIME. NO CHANGE IN MEANS OF EGRESS USE GROUP OR OCCUPANCY.multifamilyBuilding, HVAC / Mechanical, Plumbing· The Metro Group, Inc$695KJun 10
- 18-65 211 Street QueensINSTALLATION OF AIR COOLED CHILLER AND COOLING TOWER.. ALL WORK AS PER PLANS FILED HEREWITH. NO CHANGE TO USE, EGRESS, OR OCCUPANCY.multifamilyBuilding· The Metro Group, Inc$600KJul 15