Get ProEvery project in every city · from $79/mo
Get Procommercial project · New York City, NY
Commercial General Building, Hvac/Mechanical, Plumbing work permitted January 28, 2026, with 4 permits through January 28, 2026, declaring $300,498 of work. Contractor on record: WDF Inc.
REMOVE AND INSTALL PARTITIONS, WALL FURRING, FLOORING, RUBBER BASE, WOOD FLOORING, STEEL BASE, WINDOWS, CEILINGS & SOFFITS, DOORS/FRAME AND HARDWARE, FINISHES. PROVIDE PAINTING THROUGHOUT, SIGNAGE, AND EQUIPMENT. ROOF PATCHING.
New York City permit records name WDF Inc as the contractor on this project.
Phone numbers and the property owner are included with Pro, where the city publishes them.
4 permits issued Jan 28 – Jan 28, newest first.
| Issued | Permit | Contractor | Value |
|---|---|---|---|
| applied Feb 27 | #X01085184-S1-MS Mechanical Systems · Initial Permit FURNISH AND INSTALL AIR-CONDITIONING UNITS, HEAT PUMP, FAN COIL UNITS, ENERGY RECOVERY VENTILATOR ETC. AS SHOWN ON DRAWINGS. EXISTING SUPPLY AND EXHAUST DUCTWORK TO BE REMOVED. EXISTING OPENING SHALL BE CAPPED. FLASHED AND SEALED WATERTIGHT. |
Commercial and multifamily, biggest first.
Status: Permit Issued
| WDF Inc |
| $75K |
| applied Feb 14 | #X01085184-S3-ST Structural · Initial Permit New Beam and Slab on Roof as shown on drawing. Status: Permit Issued | WDF Inc | $50K |
| applied Feb 14 | #X01085184-S2-PL Plumbing · Initial Permit Cap and remove water piping for removed fixtures and remove bathroom fixtures in locker rooms. Install new storm piping and connect to existing. Status: Permit Issued | WDF Inc | $25K |
| applied Feb 27 | #X01085184-I1-GC General Construction · Initial Permit REMOVE AND INSTALL PARTITIONS, WALL FURRING, FLOORING, RUBBER BASE, WOOD FLOORING, STEEL BASE, WINDOWS, CEILINGS & SOFFITS, DOORS/FRAME AND HARDWARE, FINISHES. PROVIDE PAINTING THROUGHOUT, SIGNAGE, AND EQUIPMENT. ROOF PATCHING. Status: Permit Issued | WDF Inc | $150K |
In New York City, biggest first.