multifamily project · New York City, NY
41 West 86 Street Manhattan, New York City, NY 10024
Multifamily General Building work permitted February 28, 2025, declaring $157,700 of work. Contractor on record: Structural Preserv System.
Get a free email when a new permit is filed here
- $158K
- Project value
- 1
- Permit
- Feb 28
- First permit
- 182 days
- Application to issuemedian
What's being built
Facade repairs as per plans; no change to use, egress, or occupancy.
Who is building at 41 West 86 Street Manhattan?
New York City permit records name Structural Preserv System as the contractor on this project.
On file for this address
- A contractor phone number
- The property owner
One charge, nothing renews. Refunded in full if the record lacks what’s listed here.
Permits at 41 West 86 Street Manhattan
1 permit, issued Feb 28.
| Issued | Permit | Contractor | Value |
|---|---|---|---|
| applied Aug 30 | #M01040700-I1-GC General Construction · Initial Permit Facade repairs as per plans; no change to use, egress, or occupancy. Status: Permit Issued | Structural Preserv System | $158K |
Other projects in 10024
Commercial and multifamily, biggest first.
- 170 Central Park West ManhattanAlteration Type one for addition as per plans.commercialBuilding, Fire protection, HVAC / Mechanical, Plumbing· Turner Construction Compa$61.9MAug 17
- 401 West 79 Street ManhattanPROPOSED STRUCTURAL WORK. ALL AS PER PLANS FILED HEREWITHcommercialBuilding· Judlau Contracting Inc$54.6MFeb 6
- 200 Central Park West ManhattanReplace roof covering, restore facade and copper gutter and flashingscommercialBuilding· Nicholson & Galloway, Inc$12MDec 29
- 200 Central Park West ManhattanRe-roof slate and flat roofs. Remove and install new identical gutters with new drains. Remove mechanical equipment.commercialBuilding· Nicholson & Galloway, Inc$10MFeb 18
- 340 West 85 Street ManhattanALT-CO TO REFLECT CHANGE OF OCCUPANCY OF OFFICES AT 2ND AND 3RD FLOOR TO DWELLING UNITS AND RECONFIGURATION OF SRO UNITS AT 4TH THROUGH 8TH FLOOR TO DWELLING UNITS. INTERIOR AND…commercialBuilding, Fire protection, HVAC / Mechanical, Plumbing· Aspro Plumbing Inc$9.4MDec 8
- 214 West 80 Street ManhattanProposed residential conversion from the existing non-residential building to a residential building according to MDL Article 7B. Obtain a new C of O.commercialBuilding, Fire protection, HVAC / Mechanical, Plumbing· Terra Developers, LLC$6.2MOct 13
More projects by Structural Preserv System
In New York City, biggest first.
- 675 Lincoln Avenue BrooklynSTRUCTURAL WORK FILED IN CONJUNCTION WITH GC APPLICATION: REHABILITATION OF THE EXISTING GARAGES (GARAGES 1, 2 & 3) AND PLAZA STRUCTURE. NO CHANGE TO USE, EGRESS OR OCCUPANCYmultifamilyBuilding, HVAC / Mechanical, Plumbing· Fifth Avenue Builders LLC$44.7MSep 25
- 2253 Third Avenue ManhattanApplication filed for interior apartment renovations; lobby renovation; roof repairs; as per drawings filed herewith.multifamilyBuilding· Structural Preserv System$12MSep 26
- 2253 3 Avenue ManhattanReplacement of residential Ductwork, exhaust fans, equipment, Lobby, as per drawings filed herewith.multifamilyHVAC / Mechanical· Structural Preserv System$9MSep 24
- 230 East 123 Street ManhattanApplication filed for interior apartment renovations; lobby renovation; roof repairs; ramp repairs, as per drawings filed herewith.multifamilyBuilding· Structural Preserv System$8MSep 23
- 2385 2 Avenue ManhattanApplication filed for interior apartment renovations; lobby renovation; roof repairs; ramp repairs, as per drawings filed herewith.multifamilyBuilding· Structural Preserv System$8MSep 23
- 221 East 122 Street ManhattanApplication filed for interior apartment renovations; lobby renovation; roof repairs; ramp repairs, as per drawings filed herewith.multifamilyBuilding· Structural Preserv System$7.1MSep 24