commercial project · New York City, NY
304 Franklin Avenue Brooklyn, New York City, NY 11238
Commercial General Building, Fire Protection, Plumbing work permitted June 9, 2026, with 6 permits through October 14, 2026. Contractor on record: MJM Constr Associates LLC.
Get a free email when a new permit is filed here
- n/a
- Project value
- 6
- Permits2 in the last 30 days
- Jun 9
- First permit
- 325 days
- Application to issuemedian
What's being built
Filing of hydraulically calculated sprinkler system, with booster pump, for proposed 6-story mixed use building. Refer to DOB NOW #B01213419-I1 for all zoning architectural aspects of the project.
Who is building at 304 Franklin Avenue Brooklyn?
New York City permit records name MJM Constr Associates LLC as the contractor on this project.
On file for this address
- The contractor on this job
- A contractor phone number
One charge, nothing renews. Refunded in full if the record lacks what’s listed here.
Permits at 304 Franklin Avenue Brooklyn
6 permits issued Jun 9 – Oct 14, newest first.
| Issued | Permit | Contractor | Value |
|---|---|---|---|
| applied Sep 10 | #B01213419-S3-EW-SP Sprinklers · Initial Permit Filing of hydraulically calculated sprinkler system, with booster pump, for proposed 6-story mixed use building. Refer to DOB NOW #B01213419-I1 for all zoning architectural aspects of the project. Status: Permit Issued | Contractor with Pro | — |
| applied Nov 4 | #B01213419-S2-PL Plumbing · Initial Permit Filing of plumbing system for proposed 6-story mixed use building. Refer to DOB NOW #B01213419-I1 for all zoning architectural aspects of the project. Status: Permit Issued | Contractor with Pro | — |
| applied Aug 20 | #B01213419-S7-FO-EA Foundation · Initial Permit Herewith filing FO/EA application for proposed 6-Story New building. The scope of work involves concrete isolated footings for columns, Mat footing for elevator and stirp footings for walls. This job is filed in conjunction to the DOB job# B01213419-I1 Status: Permit Issued | MJM Constr Associates LLC | — |
| applied Aug 20 | #B01213419-S5-SE Support of Excavation · Initial Permit Herewith filing SOE plans for proposed 6-story new building. The SOE scope of work involves shoring & 1:1 berming. This application is filed in conjunction with DOB job # B01213419-I1 Status: Permit Issued | MJM Constr Associates LLC | — |
| applied Feb 23 | #B01213419-S6-ST Structural · Initial Permit Herewith filing ST plans of 6-story concrete building. The proposed structure is a concrete building with column & shear walls as gravity & lateral system respectively. Status: Permit Issued | MJM Constr Associates LLC | — |
| applied May 2 | #B01213419-I1-GC General Construction · Initial Permit PROPOSED 6 STORY MIXED USE NEW BUILDING WITH COMMERCIAL SPACE AND 14 RESIDENTIAL DWELLING UNITS Status: Permit Issued | MJM Constr Associates LLC | — |
Other projects in 11238
Commercial and multifamily, biggest first.
- 2 Eastern Parkway Brooklynproposed general construction on 1st, 2nd, 3rd floors, as per plan. no changes to egress, occupancy or use.commercialBuilding, HVAC / Mechanical, Plumbing· Gilbane Building Company$46.8MJun 11
- 483 Carlton Avenue BrooklynFACADE RESTORATION AS INDICATED ON DRAWINGS. THERE WILL BE NO CHANGE IN THE USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION.multifamilyBuilding· P & K Contracting Inc$24.6MJul 14
- 1104 Pacific Street BrooklynPROPOSING VERTICAL AND HORIZONTAL ENLARGEMENT TO AN EXISTING TWO-STORY BUILDING, PROPOSING 9 STORY, CELLAR, AND BASEMENT MIXED USE BUILDINGcommercialBuilding, HVAC / Mechanical· B Contractors Group LLC$19.6MOct 21
- 200 Eastern Parkway BrooklynInstallation of 6 new boilers and removal of 7 existing boilers at the Brooklyn Museum. No change of use, egress or occupancy.commercialBuilding, HVAC / Mechanical, Plumbing· Dynamic US, Inc$11.1MSep 1
- 105 Underhill Avenue BrooklynVertical and horizontal enlargement and renovation of existing building.commercialBuilding, HVAC / Mechanical, Plumbing· Pro-H Development Inc$10.3MJun 10
- 200 Eastern Parkway BrooklynInterior Renovation of 3rd floor and mez.3 associated with the GC scope. No change in use, egress, or occupancy under this application.commercialBuilding, Fire protection, HVAC / Mechanical, Plumbing· Tishman Construction Corp$9.3MSep 16
More projects by MJM Constr Associates LLC
In New York City, biggest first.
- 60 East 54 Street ManhattanRENOVATION OF EXISTING HOTEL. ADDITIONAL OF CELLAR MEZ LEVEL.commercialBuilding, Fire protection, HVAC / Mechanical, Plumbing· MJM Constr Associates LLC$14.9MMar 13
- 64 Fulton Street ManhattanConversion of 3rd-11th floors to residential use under ZR Article I Chapter 5. MPP project #423.commercialBuilding, Fire protection, HVAC / Mechanical, Plumbing· Mmi Plumbing & Heating In$5.3MFeb 12
- 2 Lexington Avenue ManhattanINTERIOR RENOVATION OF EXISTING 17TH FLOOR PENTHOUSE, INCLUDING RECEPTION, LOUNGES, TOILET ROOMS, BARS, FINISHES, AND LIGHTING THROUGHOUT, PARTITION MODIFICATIONS,NEW WINDOWS AND…commercialBuilding, HVAC / Mechanical, Plumbing· MJM Constr Associates LLC$2.3MSep 14
- 392 West Broadway ManhattanApplic. filed herewith for the conversion of exist. old code comm/resid to resid (2nd & 5th fls only) under ZR-15-00 and Art. 7B of the MDL. Remove, relocate & install new inter…commercialBuilding· MJM Constr Associates LLC$2.2MMar 1
- 50 Gramercy Park North ManhattanInterior demolition and construction of non- load bearing partitions and hung ceilings related to BOH renovations and upgrades. No change in occupancy, use or egress.multifamilyBuilding, HVAC / Mechanical, Plumbing· MJM Constr Associates LLC$1MOct 29
- 64 Fulton Street ManhattanReplacement of windows in existing facade openings at 2nd through 11th floorscommercialBuilding, Plumbing· MJM Associates Constr LLC$810KFeb 19