Get ProEvery project in every city · from $79/mo
Get Procommercial project · New York City, NY
Commercial General Building, Hvac/Mechanical, Plumbing work permitted June 27, 2025, with 5 permits through June 12, 2026, declaring $700,000 of work. Contractor on record: Metrocity Group,Inc.
Replacement of (1) oil-fired storage water heater with (1) gas-fired hot water heater and installation of new gas piping to water heater and burner. The burner replacement is filed under the initial filing.
New York City permit records name Metrocity Group,Inc, Boilermatic Weldng Inds I and Boilermatic Welding Indus as the contractors on this project.
Phone numbers and the property owner are included with Pro, where the city publishes them.
5 permits issued Jun 27 – Jun 12, newest first.
| Issued | Permit | Contractor | Value |
|---|
Commercial and multifamily, biggest first.
| applied May 28 | #Q01219238-S4-BE Boiler Equipment · No Work Permit This project is for the legalization of an existing 660 MBH gas-fired hot water boiler. Existing boiler previously installed under LAA Q00376959-I1-LA and was never signed off. Status: Signed-Off | Metrocity Group,Inc | — |
| applied Dec 19 | #Q01219238-S3-GC General Construction · Initial Permit Filing for the installation of two new chimney liners as per plans filed herewith. Status: Signed-Off | Boilermatic Welding Indus | $50K |
| applied Dec 12 | #Q01219238-S2-BE Boiler Equipment · Initial Permit Register existing boiler in the cellar as per plans filed herewith. Status: Signed-Off | Boilermatic Weldng Inds I | $150K |
| applied Jun 20 | #Q01219238-S1-PL Plumbing · Initial Permit Replacement of (1) oil-fired storage water heater with (1) gas-fired hot water heater and installation of new gas piping to water heater and burner. The burner replacement is filed under the initial filing. Status: Permit Issued | Metrocity Group,Inc | $300K |
| applied Jun 20 | #Q01219238-I1-BE Boiler Equipment · Initial Permit This job is for the replacement of (2) two existing dual fuel burners, no change to existing boilers. A new natural gas line is to be connected to the replacement burner in the annex. Gas piping to be filed under subsequent filing. Status: Signed-Off | Boilermatic Weldng Inds I | $200K |
In New York City, biggest first.