Get ProEvery project in every city · from $79/mo
Get Procommercial project · New Orleans, LANew: first permit Oct 21
Commercial General Building work permitted October 21, 2026, declaring $343,869 of work.
Get new commercial permits in New Orleans, free weekly email
N.O. Lakefront Airport McDermott Hangar Flat Roof Replacement: Includes the furnishings of all labor, equipment and materials necessary for the demolition and removal of the existing roofing system and installation of a new multi-ply SBS-modified bitumen membrane torch down roofing system over new deck cover board, tapered rigid insulation and decking. Work also includes the removal of the five existing HVAC units, existing curbs, and existing skylight and replacement of damaged existing wood soffit decking. Two new 10-ton HVAC units and new curbs will be installed on the new roofing system.…
This is a new project: its first permit was issued October 21, 2026. The contractor on it is included with Pro and is named here 30 days after the first permit.
See the contractor1 permit issued Oct 21 – Oct 21, newest first.
| Issued | Permit | Contractor | Value |
|---|---|---|---|
| applied Oct 9 |
#26-16815-RENO Renovation (Structural or Non-structural) · RENO N.O. Lakefront Airport McDermott Hangar Flat Roof Replacement: Includes the furnishings of all labor, equipment and materials necessary for the demolition and removal of the existing roofing system and installation of a new multi-ply SBS-modified bitumen membrane torch down roofing system over new… Status: Permit Issued |
| Contractor with Pro |
| $344K |