Get ProEvery project in every city · from $79/mo
Get Procommercial project · New Orleans, LA
Commercial General Building, Electrical, Hvac/Mechanical work permitted April 15, 2025, with 4 permits through October 19, 2026, declaring $2,699,175 of work. Contractor on record: Woodward Design + Build, LLC, Kirk Joseph Boudreaux.
Get new commercial permits in New Orleans, free weekly email
The project is a renovation of the existing Floor 2 Locker Rooms within the New Orleans Jewish Community Center's Health Club facility. This interior renovation includes new floor plan layouts for the Men's and Women's Locker Rooms, as well as a new Gender Neutral Changing Suite. As required for the expanded Steam Room(s), Sauna(s) and new Cold Room(s), the project will include the addition of (3) new rooftop mechanical units.
New Orleans permit records name Woodward Design + Build, LLC, Kirk Joseph Boudreaux, Woodward Design + Build and CJ Williams Construction LLC as the contractors on this project.
The property owner is included with Pro.
4 permits issued Apr 15 – Oct 19, newest first.
| Issued | Permit | Contractor | Value |
|---|---|---|---|
| applied Oct 16 | #26-30522-HVAC Mechanical HVAC · HVAC Remodel of two locker and bathroom areas. Replace all sheet metal ductwork. Reuse 3 existing RTUs. Install one new DOAS unit. Install 2 new package refrigeration units. Status: Permit Issued | Contractor with Pro | $295K |
| applied Sep 17 | #26-27497-SERV Electrical Service / Circuit / Feeder · SERV Renovation of existing floor locker rooms within the New Orleans Jewish Community Center Health Club facility. Installing a new 225 Amp panel with 20 new 20 Amp circuits. Status: Permit Issued | Woodward Design + Build, LLC, Kirk Joseph Boudreaux | $180K |
| applied Jul 14 | #26-20685-RNVN Renovation (Non-Structural) · RNVN The project is a renovation of the existing Floor 2 Locker Rooms within the New Orleans Jewish Community Center's Health Club facility. This interior renovation includes new floor plan layouts for the Men's and Women's Locker Rooms, as well as a new Gender Neutral Changing Suite. As required for… Status: Permit Issued | Woodward Design + Build | $2.2M |
| applied Jan 23 | #25-02386-RNVN Renovation (Non-Structural) · RNVN Replacement of entrance drive paving only to provide ADA accessibility at front entrance and addition of guard rails along sidewalk. All work to be done as per plans. Status: Permit Issued | CJ Williams Construction LLC | $49.3K |