Commercial General Building, Electrical, Hvac/Mechanical work permitted December 4, 2024, with 5 permits through June 4, 2026, declaring $767,742 of work. Contractor on record: Allen Raimer, Jr.
Get new commercial permits in New Orleans, free weekly email
Non-structural renovation of an existing 4,982 SF commercial space with a construction cost under 50% the appraised value. The renovation will include new offices, open offices and misc. support spaces.
New Orleans permit records name Allen Raimer, Jr, McDonnel Group LLC, Darryl Paul Brown and Glenn Andrew Cordes as the contractors on this project, among 5 contractors in all.
The property owner is included with Pro.
5 permits issued Dec 4 – Jun 4, newest first.
| Issued | Permit | Contractor | Value |
|---|
| applied Jun 3 | #26-16637-FGAS Mechanical Fuel Gas · FGAS Installing Gas Line for 1- gas water heater and 4- A/C units Status: Finaled | Allen Raimer, Jr | $4K |
| applied Apr 28 | #26-12843-HVAC Mechanical HVAC · HVAC Permit is for the installation of (1) 5 Ton System and (3) 4 Ton Systems all electric and Owner provided and the installation of all ductwork. Status: Finaled | McDonnel Group LLC, Darryl Paul Brown | $35.5K |
| applied Feb 2 | #26-03182-SERV Electrical Service / Circuit / Feeder · SERV Office build out Status: Finaled | Glenn Andrew Cordes | $187K |
| applied Oct 24 | #25-33308-RNVN Renovation (Non-Structural) · RNVN Non-structural renovation of an existing 4,982 SF commercial space with a construction cost under 50% the appraised value. The renovation will include new offices, open offices and misc. support spaces. Status: Finaled | The McDonnel Group, LLC | $525K |
| applied Dec 3 | #24-36396-SERV Electrical Service / Circuit / Feeder · SERV Replaced 400amp 3 phase service due to burnt out lug in main disconnect. Relocated meter and main disconnect to outside of electrical closet for emergency access and meter reading. Need an emergency reconnect with new 3 phase meter. Up graded grounded system to dual ground rods. Status: Meter Release | Nuccio G Nicholas | $16.5K |