Commercial General Building, Electrical, Elevator, Hvac/Mechanical work permitted April 7, 2025, with 15 permits through September 29, 2026, declaring $30,025,619 of work. Contractor on record: Broadmoor Construction.
Get new commercial permits in New Orleans, free weekly email
Floor 4 of this 8‑story office building scope Includes Installation of FCU-4.1 (DX) serving elevator control room; CU-4.1 paired with FCU-4.1. this Includes associated ductwork, piping, and controls.
New Orleans permit records name Broadmoor Construction, Todd P Trosclair, Sr. and Broadmoor, LLC as the contractors on this project, among 7 contractors in all.
The property owner is included with Pro.
15 permits issued Apr 7 – Sep 29, newest first.
| Issued |
|---|
In New Orleans, biggest first.
| Permit |
|---|
| Contractor |
|---|
| Value |
|---|
| applied May 5 | #26-07772-HVAC Mechanical HVAC · HVAC Floor 4 of this 8‑story office building scope Includes Installation of FCU-4.1 (DX) serving elevator control room; CU-4.1 paired with FCU-4.1. this Includes associated ductwork, piping, and controls. Status: Permit Issued | Broadmoor, LLC | $7.4M |
| applied Aug 14 | #26-23938-SERV Electrical Service / Circuit / Feeder · SERV Permit for Fire Pump Electrical Installation. Will require a meter release upon inspection. Feeder for Fire Pump is 180 amps. Existing Electrical Service. Status: Permit Issued | Todd P Trosclair, Sr. | $1K |
| applied Jun 23 | #26-18431-HVAC Mechanical HVAC · HVAC Installation of a complete HVAC system on Floors 5-8 of an 8-story Office Building. Work includes installation of dry coolers, computer room air conditioning (CRAC) units, chilled water ceiling cassettes, inline exhaust fans, and associated air distribution systems (grilles, registers, diffusers,… Status: Permit Issued | Broadmoor Construction | $2.4M |
| applied May 19 | #26-15119-SERV Electrical Service / Circuit / Feeder · SERV Interior single tenant build-out of office space and conference center. Status: Permit Issued | Todd P Trosclair, Sr. | $5.2M |
| applied Jun 1 | #26-16304-HVAC Mechanical HVAC · HVAC The roof and penthouse of this 8-story office Building include installation of ACWCU‑1 and ACWCU‑2 air‑cooled water chillers serving the building chilled water plan, providing central chilled water generation, air handling, and dedicated cooling for the penthouse, elevator control, telecom, and… Status: Permit Issued | Broadmoor Construction | $740K |
| applied May 4 | #26-13508-HVAC Mechanical HVAC · HVAC Floor 8 of this 8‑story office building Scope includes AHU‑8.1 and AHU‑8.2 supplying conditioned air to VAV terminal units, each receiving outdoor air through VAV‑OA‑8.1 with electric duct heaters EHC‑8.1.1 and EHC‑8.1.2 (10 kW each) and through VAV‑OA‑8.2 with electric duct heaters EHC‑8.2.1,… Status: Permit Issued | Broadmoor Construction | $7.4M |
| applied May 4 | #26-13428-HVAC Mechanical HVAC · HVAC Floor 6 of this 8‑story office building scope Includes AHU 6.1 and AHU 6.2 supplying conditioned air to VAV terminal units, each receiving outdoor air through VAV OA 6.1 with electric duct heaters EHC 6.1.1, EHC 6.1.2, and EHC 6.1.3 (10 kW each) and through VAV OA 6.2 with electric duct heaters… Status: Permit Issued | Broadmoor Construction | $7.4M |
| applied May 4 | #26-13431-HVAC Mechanical HVAC · HVAC Floor 7 of this 8‑story office building scope Includes AHU 7.1 and AHU 7.2 supplying conditioned air to VAV terminal units, each receiving outdoor air through VAV OA 7.1 with electric duct heaters EHC 7.1.1, EHC 7.1.2, and EHC 7.1.3 (10 kW each) and through VAV OA 7.2 with electric duct heaters… Status: Permit Issued | Broadmoor Construction | $7.4M |
| applied Apr 14 | #26-11226-HVAC Mechanical HVAC · HVAC Floor 5 of this 8-story building Scope includes Underfloor interior zones that are served by dual‑path AHU‑5.1 and AHU‑5.2, with the Telecom space served by FCU‑5.1 (CHW). Scope includes installation of both AHUs and FCU, associated routing and controls, and electric duct heaters—AHU‑5.1 (13 kW,… Status: Permit Issued | Broadmoor Construction, Charles K Sardi | $7.4M |
| applied Mar 16 | #26-07657-HVAC Mechanical HVAC · HVAC Floor 2 of this 8‑story office building Scope Includes Installation of AHU-2.1 (CHW) serving fitness mezzanine; Fan Powered Terminal Units-FPTU-2.1 (6.5 kW), FPTU-2.2 (4.5 kW), FPTU-2.3 (4.5 kW) serving interior zones, this Includes associated ductwork, piping, and controls. Status: Permit Issued | Broadmoor Construction | $7.4M |
| applied Mar 2 | #26-05932-HVAC Mechanical HVAC · HVAC Floor 1 of this 8‑story office building includes a total of eight (8) split‑system heat pump units serving various first‑floor spaces. The equipment mix consists of (1) 0.5‑ton unit, (2) 1‑ton units, (2) 2‑ton units, (2) 2.5‑ton units, and (1) 3.5‑ton unit, each paired with its corresponding fan… Status: Permit Issued | Broadmoor, LLC | $7.4M |
| applied Jan 30 | #26-03083-MOVG Moving Equipment · MOVG Installation of Two Buckhoist Status: Permit Issued | Lewis Crane and Hoist LLC. | — |
| applied Jan 8 | #26-00632-MOVG Moving Equipment · MOVG Elevator Installation Status: Permit Issued | Schindler Elevator | — |
| applied Mar 24 | #25-09061-SERV Electrical Service / Circuit / Feeder · SERV A NEW CONSTRUCTION OF A CLASS A OFFICE BUILDING. THE DEVELOPMENT IS A PARTIAL BLOCK BOUNDED BY HENDERSON STREET, CONVENTION CENTER BLVD, AND EUTERPE STREET. THE BUILDING IS COMPRISED OF (8) STORIES INCLUDING (3) STORIES OF GARAGE PARKING, (4) STORIES OF OFFICE, AND (1) STORY OF RETAIL WITH… Status: Meter Release | Todd P Trosclair, Sr. | $6.8M |
| applied Mar 25 | #25-09265-LOOP Construction Loop · LOOP Temporary Power for Construction. Status: Finaled | Trosclair Todd | $15K |