Get ProEvery project in every city · from $79/mo
Get Procommercial project · New Orleans, LA
Commercial General Building, Electrical, Hvac/Mechanical work permitted December 2, 2024, with 23 permits through May 28, 2026, declaring $2,979,973 of work. Contractor on record: Tasch LLC.
Get new commercial permits in New Orleans, free weekly email
New Orleans permit records name Tasch LLC, Alfred C Deubler, III and ALFRED Clinton DEUBLER, III as the contractors on this project, among 9 contractors in all.
The property owner is included with Pro.
23 permits issued Dec 2 – May 28, newest first.
| Issued | Permit | Contractor | Value |
|---|---|---|---|
In New Orleans, biggest first.
#26-03729-SERV Electrical Service / Circuit / Feeder · SERV COMPUTER ROOM, A/C UNITS, AND UPS REPLACEMENT Status: Permit Issued |
| Not published |
| $576K |
| applied Feb 20 | #26-04982-SERV Electrical Service / Circuit / Feeder · SERV Installation of floor track raceways in conference rooms. Installation of outlets throughout space. Status: Permit Issued | Not published | $47.1K |
| applied Jan 27 | #26-02534-SERV Electrical Service / Circuit / Feeder · SERV INSTALL FIXTURES SWITCHES AND RECEPTACLES. Status: Closed | ALFRED Clinton DEUBLER, III | $79.9K |
| applied Jan 27 | #26-02541-FGAS Mechanical Fuel Gas · FGAS Test existing gas line. Extend gas line 15' and connect new owner supplied stove. Status: Finaled | David E Bremermann | $3.5K |
| applied Jan 27 | #26-02709-HVAC Mechanical HVAC · HVAC Alterations: Relocate 39 existing modulines with 30 thermostats. Relocate 24 existing return air grills. Check 27 existing heat grills to remain. Furnish and install two new modulines and six thermostats. Furnish and install 3 sound cells. Furnish and install one VAV box with 2 slot diffusers at… Status: Finaled | King Company LLC | $56.3K |
| applied Oct 1 | #25-30204-RNVN Renovation (Non-Structural) · RNVN Tenant Office Build-Out. Status: Finaled | King Company LLC | $669K |
| applied Aug 14 | #25-24735-ERPR Electrical Repair / Replacement / Addition · ERPR Install fixtures, switches and receptacles. Status: Finaled | Tasch LLC | $78.6K |
| applied Aug 18 | #25-25055-HVAC Mechanical HVAC · HVAC Check 6 modulines. Relocate 12 modulines. Furnish and install 6 new modulines. Furnish and install 9 new moduline thermostats. Furnish and install 24 new lay-in return grills. Demo units and cap up duct. Furnish and install 4 new VAV boxes, duct, controls and grilles. Status: Finaled | Tasch, LLC | $73K |
| applied Jun 19 | #25-18732-RNVN Renovation (Non-Structural) · RNVN Interior Tenant Office Build-Out Status: Permit Issued | Tasch LLC | $617K |
| applied Jul 23 | #25-22305-ERPR Electrical Repair / Replacement / Addition · ERPR Minor renovations to the existing 30th floor and 31st floor of an existing highrise building. Includes minor demolition, minor electrical upgrades to floor boxes and modular walls. Status: Permit Issued | Not published | $102K |
| applied Feb 26 | #25-06204-RNVN Renovation (Non-Structural) · RNVN THIS PROJECT ADDRESSES NECESSARY REPAIRS TO AN AGING CLADDING SYSTEM AT THE HIGHEST FLOOR AND ROOF LEVEL OF 201 SAINT CHARLES AVENUE. THE WORK INCLUDES THE REPAIR OF EXISTING METAL PANELS AND THE INSTALLATION OF AN OVERCLAD SYSTEM OF NEW INSULATED METAL PANELS FOR THE 53RD LEVEL PENTHOUSE AND THE… Status: Permit Issued | Centennial Moisture Control, Inc | $350K |
| applied Apr 15 | #25-11581-EVAC Electrical Vacancy · EVAC 6 MONTH METER RELEASE FOR SUITE 2409. NO WORK DONE. Status: Permit Issued | ALFRED Clinton DEUBLER, III | $115 |
| applied Apr 6 | #25-10539-RNVN Renovation (Non-Structural) · RNVN change of use. no work needed. FOOD COURT Change of use to fast food burger place Status: Finaled | Not published | — |
| applied Jun 19 | #25-18672-HVAC Mechanical HVAC · HVAC Install (4) new electric VAV boxes. Status: Finaled | August R Gallo, Jr. | $3.5K |
| applied Jun 19 | #25-18671-HVAC Mechanical HVAC · HVAC Install (4) new electric VAV boxes. Status: Finaled | August R Gallo, Jr. | $3.5K |
| applied Apr 15 | #25-11582-EVAC Electrical Vacancy · EVAC 6 MONTH METER RELEASE FOR SUITE 3209. NO WORK DONE. Status: Finaled | Alfred C Deubler, III | $115 |
| applied Apr 15 | #25-11579-EVAC Electrical Vacancy · EVAC 6 MONTH METER RELEASE FOR SUITE 2210. NO WORK DONE. Status: Finaled | Alfred C Deubler, III | $115 |
| applied Dec 2 | #24-36106-RNVN Renovation (Non-Structural) · RNVN THIS PROJECT CONSISTS OF MINOR RENOVATIONS TO THE EXISTING 30TH FLOOR AND 31ST FLOORS OF AN EXISTING HIGHRISE BUILDING. SCOPE OF WORK INCLUDES SELECTIVE DEMOLITION, MINOR MEHCANICAL AND ELECTRICAL UPGRADES, AND FINISH UPGRADES. Status: Permit Issued | Not published | $300K |
| applied Mar 20 | #25-08775-ERPR Electrical Repair / Replacement / Addition · ERPR refeed three circuits Status: Finaled | PPS Commercial Unlimited,LLC | $1.5K |
| applied Feb 21 | #25-05819-FGAS Mechanical Fuel Gas · FGAS test existing gas line for leaks. Check two existing gas appliance connections to gas line. Status: Finaled | David Bremermann | $2.2K |
| applied Jan 15 | #25-01735-RNVS Renovation (Structural) · RNVS addition of new demising wall to divide suite 2700 and give remaining space back to Landlord. Status: Permit Issued | PPS Commercial Unlimited LLC | $15.2K |
| applied Nov 25 | #24-35848-FGAS Mechanical Fuel Gas · FGAS test existing gas line and connect one fryer and stove. Need meter increase for 350,000BTU's Status: Finaled | Not published | $4.9K |
| applied Nov 22 | #24-35621-EVAC Electrical Vacancy · EVAC No work done. Meter release only. Status: Finaled | Alfred C Deubler, III | $150 |