Commercial General Building, Electrical, Elevator, Hvac/Mechanical, Sign work permitted January 3, 2025, with 8 permits through August 4, 2026, declaring $23,311,208 of work. Contractor on record: Jeremy Chase Martin.
RENOVATION OF AN EXISTING OFFICE BUILDING INTO A 39 UNIT, 195 BED HOTEL. ALL WORK TO BE DONE AS PER PLANS. * * FINAL INSPECTION VERIFY that they relocated all critical equipment from the basement to the first floor above the BFE to meet the floodplain BFE requirement.
New Orleans permit records name Jeremy Chase Martin, Pro Signs & Graphics and Katawan Vashon Fletcher, Sr. as the contractors on this project, among 4 contractors in all.
Phone numbers and the property owner are included with Pro, where the city publishes them.
8 permits issued Jan 3 – Aug 4, newest first.
In New Orleans, biggest first.
| Issued | Permit | Contractor | Value |
|---|---|---|---|
| applied Jul 29 | #26-22250-SATT Attached Sign · SATT Interior marquee was changed on and existing sign. The sign itself was not modified or adjusted Status: Finaled | Pro Signs & Graphics | — |
| applied May 13 | #26-14486-FGAS Mechanical Fuel Gas · FGAS New gas lines installed for water heater dryer and pool heater Status: Finaled | Not published | $3K |
| applied Feb 22 | #26-05057-FGAS Mechanical Fuel Gas · FGAS Gas line ran for generator Status: Finaled | Katawan Vashon Fletcher, Sr. | $7K |
| applied Mar 11 | #26-07108-SERV Electrical Service / Circuit / Feeder · SERV Installation of 200kW Temporary generator for the facility. Status: Finaled | Jeremy Chase Martin | — |
| applied Jul 28 | #25-22760-MOVG Moving Equipment · MOVG Modernization of Three ( 3 ) Passenger Elevators Status: Finaled | Pinnacle Elevator | — |
| applied Jan 31 | #25-03301-HVAC Mechanical HVAC · HVAC Subcontractor shall provide all labor, materials, equipment, and services to supply and install a complete and comprehensive mechanical system to include but not limited to permitting, tests & inspections, OAUs, Heat Pumps, Piping & Coils, Gauges, Ductwork, Insulations, fittings & valves,… Status: Finaled | Not published | $2.2M |
| applied Jan 8 | #25-00755-SERV Electrical Service / Circuit / Feeder · SERV Maintain temporary power for construction phase. REWORK existing electrical panels as needed. Repurpose existing 2,000A main switchboard. Repurpose (2) existing 800A distribution panelboards. Furnish, install, and update new electrical distribution. Furnish and install new panels,… Status: Finaled | Jeremy Chase Martin | $2.3M |
| applied Sep 12 | #22-27469-RNVS Renovation (Structural) · RNVS RENOVATION OF AN EXISTING OFFICE BUILDING INTO A 39 UNIT, 195 BED HOTEL. ALL WORK TO BE DONE AS PER PLANS. * * FINAL INSPECTION VERIFY that they relocated all critical equipment from the basement to the first floor above the BFE to meet the floodplain BFE requirement. Status: Finaled | Not published | $18.8M |