Commercial General Building work permitted September 12, 2025, with 4 permits through October 12, 2026, declaring $1,605,570 of work.
PROJECT SCOPE INCLUDES DESIGN OF NEW SUPPLEMENTAL AC SYSTEM TO SERVE A VARIETY OF EXISTING SPACES ON LEVELS ONE, TWO, FOUR, AND SIX, ALONG WITH NEW MECHANICAL DESIGN OF SPACES ON LEVELS TWO AND FOUR. SCOPE OF WORK INCLUDES SELECTIVE DEMOLITION OF CEILING ELEMENTS, EXPANSION OF EXISTING SLAB OPENINGS AS REQUIRED FOR NEW PIPING AND EXISTING EXTERIOR LOUVER MODIFICATION.
Montgomery County MD’s permit records for this address don’t name a contractor; the permits list the scope, value and dates below.
4 permits issued Sep 12 – Oct 12, newest first.
| Issued | Permit | Contractor | Value |
|---|---|---|---|
| applied Jul 31 | #1166791 COMMERCIAL BUILDING · ALTER INTERIOR ALTERATION OF EXISTING FULL FLOOR TENANT. TENANT MODIFICATIONS TO INCLUDE DEMOLITION OF EXISTING PARTITIONS; AND CONSTRUCTION OF NEW PARTITIONS AND DOORS. NEW ELECTRICAL WORK TO MODIFY LIGHTING AND POWER TO REFLECT NEW PLAN. ALL ELECTRICAL RUNS ARE TO CONNECT TO EXISTING BUILDING MAIN… Status: Issued |
Commercial and multifamily, biggest first.
| $142K |
| applied May 21 | #1158942 COMMERCIAL BUILDING · ALTER INTERIOR ALTERATION OF EXISTING FULL FLOOR TENANT. MODIFICATIONS TO INCLUDE DEMOLITION OF EXISTING SYSTEMS FURNITURE; AND CONSTRUCTION OF NEW DEMOUNTABLE PARTITIONS AND DOORS, AND REPLACEMENT OF EXISTING SYSTEMS FURNITURE. NEW ELECTRICAL WORK TO MODIFY POWER TO REFLECT NEW PLAN. ALL ELECTRICAL… Status: Issued | Not published | $137K |
| applied Apr 22 | #1155538 COMMERCIAL BUILDING · RESTORE AND / OR REPAIR Structural maintenance work to existing concrete pedestrian bridge including expansion joint replacement, waterproofing, coating and trench drain repairs. No change of use, function or layout. No land disturbance, no HVAC, Sprinkler, Firealarm of electrical work taking place. Status: Issued | Not published | $110K |
| applied Jun 3 | #1119922 COMMERCIAL BUILDING · ALTER PROJECT SCOPE INCLUDES DESIGN OF NEW SUPPLEMENTAL AC SYSTEM TO SERVE A VARIETY OF EXISTING SPACES ON LEVELS ONE, TWO, FOUR, AND SIX, ALONG WITH NEW MECHANICAL DESIGN OF SPACES ON LEVELS TWO AND FOUR. SCOPE OF WORK INCLUDES SELECTIVE DEMOLITION OF CEILING ELEMENTS, EXPANSION OF EXISTING SLAB… Status: Issued | Not published | $1.2M |