Commercial General Building work permitted November 14, 2024, with 15 permits through September 10, 2026, declaring $7,142,727 of work.
Get new commercial permits near 20902 or Montgomery County MD, free weekly email
Tenant Fit out for a Bowling & Redemption Arcade with a bar and snack bar and support areas.
Montgomery County MD’s permit records for this address don’t name a contractor; the permits list the scope, value and dates below.
15 permits issued Nov 14 – Sep 10, newest first.
| Issued | Permit | Contractor | Value |
|---|---|---|---|
| applied Feb 5 | #1148085 COMMERCIAL BUILDING · ALTER Tenant Fit out for a Bowling & Redemption Arcade with a bar and snack bar and support areas. Status: Issued | Not published | $4.6M |
| applied May 7 | #1157377 |
Commercial and multifamily, biggest first.
COMMERCIAL BUILDING · ALTER
Interior work only,Interior alt for an EXISTING tenant. Demo partitions, finishes and fixtures and construct new drywall partitions, finishes, fixtures and equipment.
Status: Issued
| Not published |
| $317K |
| applied Mar 6 | #1107891 COMMERCIAL BUILDING · ALTER Interior work only,TENANT FIT OUT TO ADD PARTITION WALLS TO HAVE SPA AREAS, INSTALL AN ELECTRICAL STACKABLE WASHER/DRYER, PEDICURE CHAIRS, 2 HAND SINKS, 1 MOP SINK, REPLACE WATER HEATER, INSTALL LED LIGHTS, PAINT AND PATCH AS NEEEDED. Status: Finaled | Not published | $110K |
| applied Jul 8 | #1124256 COMMERCIAL BUILDING · ALTER The alteration will be the demolition of multiple tenant spaces on the ground floor of the Westfield Wheaton Mall. Status: Finaled | Not published | $500K |
| applied Apr 16 | #1113434 COMMERCIAL BUILDING · COMMERCIAL CHANGE OF USE Relocation of restroom with ADA compliance and interior and furniture design for showroom and facade design of the store. Redesign of ceiling with MEP. Bid estimate with renovation cost estimate was not submitted. Status: Finaled | Not published | $150K |
| applied Apr 29 | #1115068 COMMERCIAL BUILDING · ALTER Interior work only,Interior Alteration level II for an existing Costco Warehouse within its Pharmacy and Hearing Center deparments. Status: Finaled | Not published | $350K |
| applied Mar 24 | #1110261 COMMERCIAL BUILDING · ALTER Revision ,1 - Per Inspector, Mop sink must go to Grease Trap, Installed per 2021WSSC code section 1003.,Customer Wants To Use ePlansCustomer Wants To Use ePlans,CONVERSION OF EXISTING RETAIL SPACE FOR CONSTRUCTION OF WETZELS PRETZELS STORE CONSISTS OF COMPLETE TENANT INTERIORS CONSTRUCTION… Status: Finaled | Not published | $200K |
| applied Jun 18 | #1121800 COMMERCIAL BUILDING · COMMERCIAL CHANGE OF USE It is a space located inside of a mall. I need interior renovations. Status: Issued | Not published | $8K |
| applied Feb 12 | #1105461 COMMERCIAL BUILDING · ALTER Interior alteration to existing restaurant space for a new restaurant tenant. No change of use. Status: Finaled | Not published | $239K |
| applied Mar 7 | #1108060 COMMERCIAL BUILDING · INSTALL HHS Review- EPLANS Status: Issued | Not published | $1K |
| applied Nov 5 | #1092427 COMMERCIAL BUILDING · ALTER Interior work only,Installation of a 331.36kWdc rooftop solar system on an existing commercial building Status: Finaled | Not published | $540K |
| applied Feb 3 | #1103972 COMMERCIAL BUILDING · ALTER Interior work only,The selective demolition of non-bearing walls, electrical, plumbing, HVAC and equipment between the existing and to remain demising walls of the previous McDonalds at this site. Status: Issued | Not published | $21.9K |
| applied May 13 | #1070375 COMMERCIAL BUILDING · ALTER Interior work only,Alter existing layout, add partial height partition walls, add outlets and lights. Status: Finaled | Not published | $65K |
| applied Dec 5 | #1095920 COMMERCIAL BUILDING · ALTER Interior work only,interior alterations for a new perfume store in a vacant retail mall space. construct 15 feet of drywall partition Status: Finaled | Not published | $15K |
| applied Sep 18 | #1086996 COMMERCIAL BUILDING · ALTER Revision ,1 - Remove exterior curb cut scope related to accessibility updates due to unforeseen construction cost.,Customer Wants To Use ePlansCustomer Wants To Use ePlans,Closure of Optical space to become storage space in existing Mercantile building footprint. Status: Finaled | Not published | $25.9K |