Get ProEvery project in every city · from $79/mo
Get Promultifamily project · Minneapolis, MN
Multifamily General Building, Plumbing work permitted November 18, 2024, with 25 permits through October 7, 2026, declaring $950,807 of work. Contractor on record: Scoobs Plumbing Inc.
Get new commercial permits in Minneapolis, free weekly email
(DMH-Pdox) KITCHEN & BATHROOM REMODEL IN CONDO UNIT #L202. REPLACE FIXTURES IN SAME LOCATIONS. INSTALL FIBER-CEMENT OR GLASS MAT GYPSUM BACKERS AT BATHTUB/SHOWER LOCATIONS FOR CERAMIC TILE FINISHES. IN MULTI-UNIT BUILDINGS, COMMON PARTY WALLS MUST USE
Minneapolis permit records name Scoobs Plumbing Inc, 4 Seasons Construction and Warners Stellian Co Inc as the contractors on this project, among 11 contractors in all.
The contractor on 1 permit issued in the last 30 days is included with Pro.
See the contractor25 permits issued Nov 18 – Oct 7, newest first.
In Minneapolis, biggest first.
| Issued | Permit | Contractor | Value |
|---|---|---|---|
#BLDG1193028 Commercial · Remodel UNIT 2601. REPLACE BATHTUB W/ WALK IN SHOWER. NO STRUCTURAL WORK. (JJL) Status: Issued | Contractor with Pro | $10K | |
#BLDG1202776 Plumbing · ComMin Pull two toilet and replace with new toilets Status: Issued | Freedom Mechanical LLP | — | |
#BLDG1199804 Plumbing · ComMin Replace shower valve, 3 toilets, 2 sinks Status: Issued | Scoobs Plumbing Inc | — | |
#BLDG1198138 Plumbing · ComMin Replace Dishwasher Status: Closed | Warners Stellian Co Inc | — | |
#BLDG1182718 Commercial · Remodel RECONFIGURE KITCHEN ROOM, NOT STRUCTURAL 2020 MSBC Status: Closed | 4 Seasons Construction | $50K | |
#BLDG1186989 Plumbing · ComMin Replace kitchen faucet/shut offs; move fridge wateline Status: Issued | Scoobs Plumbing Inc | — | |
#BLDG1185339 Plumbing · ComMin Kitchen remodel and bathroom fixtures Status: Issued | Barr Web Industries Inc | — | |
#BLDG1179145 Commercial · Remodel (DMH-Pdox) KITCHEN & BATHROOM REMODEL IN CONDO UNIT #L202. REPLACE FIXTURES IN SAME LOCATIONS. INSTALL FIBER-CEMENT OR GLASS MAT GYPSUM BACKERS AT BATHTUB/SHOWER LOCATIONS FOR CERAMIC TILE FINISHES. IN MULTI-UNIT BUILDINGS, COMMON PARTY WALLS MUST USE Status: Issued | MSP Construction & Design Co | $250K | |
#BLDG1171856 Plumbing · ComMin Remodel existing bathroom One shower valve, one lav faucet, one toilet Status: Closed | Berg Plumbing and Heating Inc | — | |
#BLDG1162566 Plumbing · ComMin Replace Dishwasher Status: Closed | Warners Stellian Co Inc | — | |
#BLDG1153311 Plumbing · ComMin Replace shower valve, lav, kitchen faucets, fridge water line Status: Closed | Scoobs Plumbing Inc | — | |
#BLDG1147775 Commercial · Remodel REPLACE UNIT 902 EXTERIOR DOOR 2020 MSBC Status: Closed | RC Elite Construction LLC | $18K | |
#BLDG1137220 Commercial · Remodel (DMH-Pdox) KITCHEN AND BATHROOM REMODEL IN CONDO UNIT #1801 INSTALL FIBER-CEMENT OR GLASS MAT GYPSUM BACKERS FOR CERAMIC TILE FINISHES AT BATHTUB/SHOWER LOCATIONS. IN MULTI-UNIT BUILDINGS, COMMON PARTY WALLS MUST USE SAME OR EQUIVALENT MATERIALS TO Status: Closed | 4 Seasons Construction | $133K | |
#BLDG1133780 Plumbing · ComMin dishwasher Status: Closed | Warners Stellian Co Inc | — | |
#BLDG1125736 Plumbing · ComMin Tub to shower, toilet,sink in master, kitchen sink, replace toilet, shower valve sink in 3/4 bath Status: Closed | Scoobs Plumbing Inc | — | |
#BLDG1112773 Commercial · Remodel (DMH-Pdox) REMODEL KITCHEN AND 2 BATHROOMS IN CONDO UNIT #1605 APPROVED PLANS AND PERMIT MUST BE ON SITE BEFORE INSPECTIONS WILL BE PROVIDED. APPLICANT IS REQUIRED TO PRINT COPIES OF ELECTRONIC APPROVED PLANS AND DOCUMENTS FROM PROJECTDOX AND HAVE A Status: Closed | 4 Seasons Construction | $145K | |
#BLDG1111861 Plumbing · ComMin REPLACING NEW ROOF DRAIN ON PATIO ENCLOSER Status: Closed | Kramer Mechanical Inc | — | |
#BLDG1104225 Commercial · Remodel ADDITION, UNIT 303 const type: IA occupancy: R2 2020 MSBC sprinklered: YES architect: 23018 - Mackey, James A @ JIM MACKEY ARCHITECT engineer: 19906 - Hostetler, Mark William @ MW Hostetler, Inc engineer: 19922 - D Status: Closed | Construct All Corp | $140K | |
#BLDG1104464 Plumbing · ComMin Replacing current bath tub in master bathroom Status: Closed | Kohler Co | — | |
#BLDG1102046 Plumbing · ComMin Replace toilets, faucets in baths, kitchen sink, shower valve Status: Closed | Scoobs Plumbing Inc | — | |
#BLDG1102047 Plumbing · ComMin Toilet, kitchen sink, dishwasher Status: Closed | Scoobs Plumbing Inc | — | |
#BLDG1096476 Commercial · Remodel REMODEL BATHROOM, SUITE 1102 occupancy: R2 2020 MSBC Status: Closed | Kohler Co | $39.4K | |
#BLDG1095770 Commercial · Remodel REMODEL KITCHEN+ENTRYWAY+2 BATHROOMS (MAA) Status: Closed | 4 Seasons Construction | $148K | |
#BLDG1089321 Commercial · Remodel REMODEL BATHROOM & DOOR, UNIT 1102 2020 MSBC Status: Closed | 4 Seasons Construction | $17.4K | |
#BLDG1094723 Plumbing · ComMin REPLACEMENT DISHWASHER Status: Closed | Warners Stellian Co Inc | — |